Loading...
HomeMy WebLinkAbout832 Ridge Runner Dr - Special Inspections/Engineering - 04/04/2013A • G Wassenaar 2180 South Ivanhoe Street, Suite 5 • � Denver. Colorado 80222-5710 Geotechnical and Environmental Consultants D.R. Horton 9555 South Kingston Court, Suite 200 Englewood, CO 80112 Attention: Mr. Tim Karns Subject: 832 Ridge Runner Drive Lot 6, Block 4 Trail Head Project Number 121913 Reference: A.G. Wassenaar Report Project Number 121913, Dated 6/26/2012 303-759-8100 Fax 303-756-2920 • www.agwassenaar.com April 04, 2013 As requested, the following portions of the foundation system were observed on the date(s) indicated below. It is our opinion that these portions of the foundation system were found to be in substantial conformance with the foundation plan and requirements of the soil report for the subject site. Observations were conducted on a periodic, on -call basis. Date: Observation: 02/20/13 Excavation Observation 03/11/13 Excavation and Footing Form Observation 03/18/13 Damp -Proofing Observation 03/18/13 Foundation Void Observation 03/18/13 Perimeter Drain Observation 03/26/13 Foundation Wall Reinforcing Steel Observation 03/29/13 Damp -Proofing Observation 03/29/13 Perimeter Drain Observation Sincerely, A. D. WA� Kenneth R. Brose I I, P. Senior Engineer A.G. enaar Geotechnical and Environmental Consultants D.R. Horton 9555 South Kingston Court, Suite 200 Englewood, CO 80112 Attention: Mr. Tim Karns Subject: 832 Ridge Runner Drive Lot 6, Block 4 Trail Head Project Number 121913 Reference: A.G. Wassenaar Report Project Number 121913, Dated 6/26/2012 2180 South Ivanhoe Street, Suite 5 Denver, Colorado 80222-5710 303-759-8100 Fax 303-756-2920 bC,0 www.agwassenaar.com June 25, 2013 As requested, we performed a slab -on -grade observation at the subject site on the date(s) listed below. Our observations indicate the interior slab construction details are in general conformance with the recommendations provided in the soils report prepared for the subject site. If you have any questions regarding our services, do not hesitate to contact our office. Date: Observation: 06/20/13 Slab -On -Grade Observation Sincerely, A. Kenneth R. Broseg ' i, .E. Senior Engineer 1