HomeMy WebLinkAbout4045 Stoney Creek Dr - Disclosures/Mechanical - 05/30/2013City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools and testing techniques, see the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color key
Measured value to
Target or limit
compare with target o
Pass
Fail
Caution
Other data
n 4045 Stoney creek
Buildel S12anier Const
FIVAC contracto GaEy Hoole
Testing date(s) 5 /7 ]
Bath exhaust
Flow box _ Flow collar
Airflow measurement metho Passive flow hood Pilot tube traverse
Temperature of air throng Indicated flow to Volumetric flow multipli r1 098
measurement too 67 F @ 5000', air temperature
Measured Exhaust Airflow
Operation
Minimum
Airflow
Indicated
Volumetric Flow
Exhaust Pickup Location
Intermittent or
Requirement
Flow
(CFM 5,000' )
PassFail
Continuous
(CFM)
(CFM 5000')
mster
' qn rmit —Conlin
50 cfm
58
63.684
❑
Bath
termit —Conlin
50 cfm
87
95.526
❑
L.L.Bath
/,Jntermit —Conlin
50 cfi»
56
161.488
❑
M.L. Bath
Xlotermit —Contin
50 cfm
65
71.37
❑
Intermit Contin
❑
❑
Intermit Contin
❑
❑
Intermit Contin
❑
❑
Intermit Corrtin
❑
❑
Kitchen exhaust
Oven fuel — Gas
lectric
Exhaust airflow Minimum exhaust airflow requirementCFM 5000'
Operation!Intermittent Continuous
Measured airflow
Airflow measurement method — Flow box — Flow collar
_ Passive flow hood _ Pitot tube traverse
Temperature of air through Indicated flow to Volumetric flow multiplier
measurement tool F @ 5000% air temperature
Indicated flow JFM Volumetric flowCFM 5000' ❑ Pass ❑ Fail
Testing notes (fan speed, masking
flow out of range, .. .
Mechanical Systems Performance Testing Submittal FormV20120321
�, a// ��)
1 of S
W3.Whole-Dwelling-Unit Ventilation
Svstems other than sub -structural floor exhaust
Minimum exhaust airflow requirement
62
FM 5000'
Ic
Indicated to
Measured Airflow
Volumetric
Design Airflow
Measurement
Measurement Location +
Flow
Volumetric
Indicated Flow
(CFM 5000')
Method
Air Temperature (F)
Multiplier
Flow
(CFM)
Pass/Fail
(CFM 5000')
VF�box
Total exhaust airflow
_ Passive flow hood
Eh
Flow collar
_
Pitot tube traverse
U.I. Bath
1.098
87
95.526
_ Flow collar
_ Pitot tube traverse
La
U]
Total supply airflow
_ Flow box
Passive flow hood
For systems in which supply airflow is circulatedybthe air handler fan, fan speed for measuremen Heat Cooling Continuous
Balanced airflow in balanced systems
Average of measured suppl
and exhaust flo CFM 5000'
Sub -structural floor exhaust
Design airflow
❑ Pass
CFM 5000'
Target flow rang
(average +/- 15
to CFM 5000'
❑ Fail
Measured airflow
=Fl.w _Flow collar
Airflow measurement metho hood _ Pitot tube traverse
Indicated flow to Volumetric flow multiplier
Temperature of air through F Q
measurement tool @ 5000', air temperature
Indicated flow CFM Volumetric flow 7 CFM 5000' ❑ Pass ❑ Fail
Temperature of air throug 6 7
measurement too F
_j
House conditioned floor area 2 772 sf
Indicated flow to Volumetric flow multiplier
@ 5000', air temperature 1 .09fi
Maximum Allowed Duct Leakage Measured Duct Leakage
Test Parameter and Conditions
Normalized Leakage
(CFM25 / 100 sf)
Absolute
Leakage
(CFM25)
Indicated Flow
(CFM25)
Volumetric
Flow
(CFM25 5000')
Measurement
Timing
Air Handler
Pass/Fail
Total leakage
Rough -in
Excluded
4
❑
IDTotal
leakage
Rough -in
Included
6
❑
❑
Total leakage
lComplete
lincluded
12
❑
❑
Leakage to outdoorsC
mplete
Included
8
12 7
142
146.116
I ❑
Mechanical Systems Performance Testing SubmittakFo V20120321 2 of 6
Filter type
Brand Generic
Static pressures (OPTIONAL)
Mode: eating
Doling
—Continuous Fan
Fan speed tap"
Humidifier bypass _ Open _(
b4II registers open
!Tone dampers open
o. �
L1P filter =
Type / styl Disposable Thickness inches MERV (optional)
1
LP AC coil =
�O
V Total ESP4
g ��
Cooling: Measured air flow through indoor coil usirg flow grid
Design cooling airflo 72 JCFM 5000' Target airflow limit; (design +/- 15%) 1618 to 828 CFM 5000'
Measured airflow
Cooling fan speed tap Med-H i gh
Temperature of air throug
measurement too 68 F
NSOP 81 •8 1Pa TFSOP Pa
Measured airflow, no adjustments or correction CFM
Volumetric flo 71 5.c896 CFM 5000' Pass
Flow grid plate siz 20
Indicated flow to Volumetric flow multipli r
@ 5000', air temperature •�98
Flow Resistance Correction Factor
Adjusted (indicated) airfll_6�=CFM
❑ Fail
Heating: Gas manifold pressure
OEM manifold pressur IWC Target manifold pressure limits (spec +/- 5%) 3 to IWC
specification, 5000 •5
Measured manifold pressur 3 6 IWC Pass ❑ Fail
Heating: Temperature rise
OEM temperature rise limi 3o to(ap IF
Measured temperature rise
Return air fi8 IF
Temp rise 59 F
Supply air ) 27 F
vy_ Pass ❑ Fail
-loif Caution: Temp rise within
10 F of top of range
Mechanical Systems Performance Testing SubmittairFo V20120321 3 of 6
E6. Refrigerant Charge
(This section under development, not yet being enforced)
17. Room Air Flow and Pressure Balance
Supply air flows (This section underdevelopment, not yet being enforced)
Pressure balance
Pressure difference limit, room -to -core -$ to +3 Pa
Room
Measured pressure
drop (Pa)
Pass
Fail
Master
-0.8
❑
Bdrm #2
+ 0.3
❑
BNS Room
-0.2
❑
M. L, Room
-0.4
n
LL.Room South
-0.1
El
L.L. Roon North
-1.0
�-
❑
❑
❑
❑
n
Mechanical Systems Performance Testing SubmittdrFo V20120321
4 of
Worst -Outdoor temperature F Worst -"se depressurization testing
House setup
Tested appliances
_ # of bath fans on These doors are closed:
-Vented range hood on
_ Clothes dryer on
Air handler on
Other fans on
Applianc,
Typo
Locatioi
CAZ pressure
BPI depressurization limit Pa wrt outside
Measured net CAZ depress urizationPa wrt outside
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit seconds
Measured spillage duration seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit Pa wrt CAZ
Measured Pa wrt CAZ
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit ppm
Measured CO ppm
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
_ Draft -hood
Induced -draft
_ Draft -hood
Induced -draft
_ Draft -hood
Induced -draft
❑ OK ❑ Caution ❑ K I U on ❑ K I ❑ Caution
60
60
60
❑
Pass
j ❑ ail
❑
Pass
it
❑
ass
I ❑
ail
❑ Pass ❑ ail ❑ Pass I Diall ❑ ass ❑ ail
100
100
100
❑
Pass
❑ ail
❑
Pass
it
❑
ass
❑ ail
❑
aution
❑
Caution
❑
aution
Mechanical Systems Performance Testing Submittm fo V20120321 5 of 6
t
i V
System controls operating per design intent
Approved Agency
Name (print)
Title
Company
Signature and Date
HVAC contractor (F(
Name (print)
Title
Company
Signature and Date
qwct—
Pass
Fail
Localexhaust
❑
Whole -house ventilation
�5
�Li
❑
Sub -structural floor exhaust ��
❑
❑
Heating
I❑
Cooling
❑
technician performing inspection ad testing documented on this form
Paul Higman
Energy Rater
Thermal Concepts/ Allied
in corms license
Mechanical Systems Performance Testing SubmittMfo V20120321 6 of 6