Loading...
HomeMy WebLinkAbout1009 Linden Gate Ct - Special Inspections/Engineering - 10/05/20122 .i.. T Structural Engineering LLC 1329 East Seventh Street. Loveland. Colorado 80937 Office, (970) 663-6016. Fax, (970) 622-9324 October 5, 2012 Jamestown Builders, LLC 3003 East Harmony Road, 4th Floor Fort Collins, CO 80528 Foundation Reinforcement Observation Lot 4, Lindenmeier Estates 1009 Linden Gate Court Fort Collins, Colorado Project Number: 12-033-32 Dear Mr. Everitt: On September 26, 2012, a representative from this office visited the site referenced above to observe the foundation wall reinforcement size, and location and to confirm the vertical reinforcement spacing in foundation forms. The reinforcement appeared to be in general compliance with the foundation drawing and details by T2 Structural Engineering, project number: 11-110, dated September 19, 2012. There are two Ufer bars, one on the west garage foundation wall and one on the east basement foundation wall. The west Ufer bar is located approximately 4-feet from the north face of the garage and the west Ufer bar is located approximately 2-feet from the front basement foundation wall. The Ufer bars were lapped and tied to the continuous bottom row of reinforcing steel. Protect freshly placed concrete from temperatures that will compromise the design strength of the concrete. Concrete placement and reinforcement is to be installed in accordance with ACI 318 and the 2006 IRC. Please contact this office if there are questions, or if additional information is required. Thank you for the opportunity to work with you on this project. Susan Tagg, P. , ,. KT 0 5 701? A Enclosures <'02 ......•. $� No Text No Text No Text No Text