HomeMy WebLinkAbout306 Cherry St - Special Inspections/Engineering - 05/20/2013May 20, 2013
Manuel Martinez
306 Cherry Street
Fort Collins, CO
Re: Interior Columns
306 Cherry Street
Fort Collins, Colorado
Project No. 212177
wialams
EN C7950C2GITIRS
STRUCTURAL ENGINEERS
$1200it
Based on my review 4x6 solid sawn DF or HF columns may be substituted for the two
interior steel pipe columns under the ceiling beam on the main floor of the structure.
The columns should be attached top and bottom with two 8" Ledgerloks toed into the
beam and blocking.
If we can be of further assistance please contact us.
Sincerely,
Weeks & As4
ary G. Week;
tructural Engi
CPC' REG(g+l^e%
cia`tes; �Inc:�;\
:fl T.
,•C N .
G3QiL
4700 South College Ave, Suite 1, Fort Collins, CO 80525
Phone (970) 225,2422 - Fax (970) 225,2622