Loading...
HomeMy WebLinkAbout306 Cherry St - Special Inspections/Engineering - 05/20/2013May 20, 2013 Manuel Martinez 306 Cherry Street Fort Collins, CO Re: Interior Columns 306 Cherry Street Fort Collins, Colorado Project No. 212177 wialams EN C7950C2GITIRS STRUCTURAL ENGINEERS $1200it Based on my review 4x6 solid sawn DF or HF columns may be substituted for the two interior steel pipe columns under the ceiling beam on the main floor of the structure. The columns should be attached top and bottom with two 8" Ledgerloks toed into the beam and blocking. If we can be of further assistance please contact us. Sincerely, Weeks & As4 ary G. Week; tructural Engi CPC' REG(g+l^e% cia`tes; �Inc:�;\ :fl T. ,•C N . G3QiL 4700 South College Ave, Suite 1, Fort Collins, CO 80525 Phone (970) 225,2422 - Fax (970) 225,2622