Loading...
HomeMy WebLinkAbout807 Columbia Rd - Special Inspections/Engineering - 12/06/2012Maus 6 G155nCX0TMS MTWUCTUR.L CNOINECR@ December 6, 2012 Jason Schumacher 807 Columbia Fort Collins, CO Re: 807 Columbia Fort Collins, Colorado On December 5; 2012 1 visited the referenced site.as. requested. The purpose of this visit was to determine the feasibility of cutting an egress window in the basement wail. The house is one-story wood framed with a full basement. The basement walls are 8" thick concrete. The. window is to be placed near the north end of the east basement wall in the location Hof an`existfi 30" wide by 20" tall window. The new window will either be the same width but deeper to meet. egress requirements or will be a 4' by. 4' slider. The,_ east wall supports floor and partial roof. Based on the proposed windows and existing, construction it is. my opinion it is feasible to cut the window in the. proposed location. If the window is the same width or narrower than the existing then: a.supplemental header is not required provided the concrete over the window is not disturbed. If a 4' by 4' window is used then it is recommended a (3)-1 3/4 x 7 114" LVL header be installed over the window opening in the east wall supported on treated. 2x8 window bucks. GENERAL COMMENTS This report has been prepared based on observations of the portions of the structure visible and with generally accepted engineering practices In the area. Should different Information become available the opinions and recommendations contained in this report should be reviewed and modified or supplemented as necessary. No warranty or guarantee, express or implied, is made or intended by this written or any oral report. if I can be of further assistance please contact me. Sinc'rely, ^�pp FEG Tary ks& A pQcyae23012 G. W e , P.E. •', tructural E� ' e F......... „S /pNA,. 4700 South College Ave, Suite l . Fort Caliina, CQ 80525 Phone (970) 225.2422 - Fax (970) 225.2622 r.N