Re: Open Excavation Observation
2220 Maple Hill Dr
Lot 99, Maple Hill, Replat 44
Fort Collins, Colorado
Dear Jeff:
+,�<�pd Irirtp�Arpp
;s
sK.:s.198b-
RMG Engineers Group (RMG) conducted a foundation excavation review for a single-family
residence under construction at the above -referenced site located in Fort Collins, Colorado on
February 25, 2013.
The footings were excavated to the silty sandy clay, which is similar to those soils described in
the Preliminary Subsurface Exploration Report, Maple Hill Subdivision, prepared by Earth
Engineering Consultants, Inc, EEC project number 1002250 and dated January 19, 2001.
RMG did not encounter groundwater within three feet of the proposed footing elevation. The
soils supporting the footings will be a low expansive material. Based on the soil conditions
encountered within three feet of the footing level, a continuous spread footing may be designed
and constructed in accordance to the above mentioned Preliminary Subsurface Exploration
Report.
Should you have questions, please feel free to contact our office.
Cordially,
Thomas M. Cope
Professional Engineer
REG/
24995 m
Southern Office: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077
nLrucuurel • LoeOLecf V V Cel
RMG
ENGINEERS
Job No. 137008
March 5, 2013
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Footing and Foundation Observation
2220 Maple Hill Dr
Lot 99, Maple Hill, Replat #4
Fort Collins, Colorado
Dear Larry:
As requested, personnel of RMG Engineers Group (RMG) observed the footing and foundation
formwork and reinforcing steel for the above referenced single family residential property and
found them to be in substantial compliance with the design drawings prepared by High Plains
Engineering & Design, LLC for this structure. The "Ufer" electrical ground system was placed
in the footing and meet the requirements of Article 250.52(A)(3) of the 2008 National Electrical
Code (NEC). The footings were observed on March 1, 2013 and the foundation walls were
observed on March 5, 2013.
Should you have questions, please feel free to contact our office.
Cordially,
Thomas M. Cope
Professional Engineer
REG
3/12/13
24995
Southern Office:
Colorado Springs, CO
719.548.0600
Monument: 719.488.2145
Englewood, CO 80112
303.688.9475
Pueblo:719.544.7750
Northern Office:
Evans, CO 80620
970.330.1071
Woodland Park: 719.687.6077
" St0000 ructural • Geotechnica
RMG
ENGINEERS
www.rmgengincers.com
Job No. 137008
March 7, 2013
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Foundation Damp Proofing
2220 Maple Hill Dr
Lot 99, Maple Hill, Replat #4
Fort Collins, Colorado
Dear Larry:
�Jy yard inno�onoo
'ru+ee.. 198b
As requested, personnel of RMG Engineers Group (RMG) observed the foundation damp
proofing and found it to be complete and in substantial compliance with the design drawings
prepared by High Plains Engineering & Design, LLC for this structure at the date of the
inspection. The damp proof was observed on March 7, 2013.
Should you have questions, please feel free to contact our office.
Cordially,
27,M6Er"�;
�.�r 3/12/13
24995
Thomas M. Cope s�ONAI F
Professional Engineer
Southern Office: Central Office: Northern Office:
Colorado Springs, Co Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077
` Structural • Geotechni`
„ RMG
ENGINEERS
www.
Job No. 137008
March 12, 2013
Journey Homes, Northern CO
7251 W. 20ih St., L-200
Greeley, CO 80634
Re: Foundation Subsurface Drain Observation
2220 Maple Hill Dr
Lot 99, Maple Hill, Replat #4
Fort Collins, Colorado
Dear Larry:
M
As requested, personnel of RMG Engineers Group (RMG) observed the foundation subsurface
drainage pipe and sump pit perimeter drain system on March 12, 2013. RMG found it to be
complete and in substantial compliance with the design drawings prepared by High Plains
Engineering & Design, LLC for this structure at the date of this observation.
Should you have questions, please feel free to contact our office:
Cordially,
Cp REGNt��e'-
tiv sM
�.� 4/16/13
24995
Thomas M. Cope /OVAL E
Professional Engineer
Southern Office: Central Office: Northern Office:
Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687,6077
. . . � . ���T-. �-3i 300��9
f�����' HIGH PLAINS ENGINEERING & DESIGN, iC
7214th STREEf,SUfTE D,FORT WPTON,CO 80621.PHONE(303}g57-9280.FAX:(303}-857-9238
April 25, 2013
Journey Homes, LLC
7251 West 20+h Street, Building L, Suite 200
Greeley, CO 80634
RE: Foundation repair recommendation and cerfification for the
proposed SL-1888 model home at Lot 99, Maple Hill 4ih Replat, 2220 Maple
Hill Drive, Fort Collins, CO
�Job # 13-3399
To Whom It May Concem:
_ A small section of the upper concrete wall at the rear of the tandem
garage bay wall was damaged during construction. The damaged
section shall be formed up and repaired with self-leveling epoxy at the
inside ancl outside of the wall. '
The observation on April 25, 2013 indicated that the crack had been
repaired.
Please call if you have any questions or concerns.
' Sincerely, p RE��S�,
�"SCHq�••F'� '
. F`O''•.a
�;
33 48 �
Todd M. Schroe er PE
. �s¢����
�IONA���
This report was prepared for the exclusive usa of our client and is not intended for any other purpose. Our
raport is based on the information made available to us at this time. Should additional in£ormation become
available,we reserve the right to determine the impact,if any,ofthe new information on our opinions and
conclusions,and to revise our opinions and conclusions if necessary and warranted by the discovery of
addiHonal information.
� �