HomeMy WebLinkAbout2202 Maple Hill Dr - Disclosures/Mechanical - 04/21/2013VED063%
City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form Is a record of testing targets and results, with Pass/Fall outcomes. For Information on measurement tools and testing techniques, see the "Residential Now
Constru;lion Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Coto r key
Measured value to;.
Target orlimit
compare with target o
_Pass
�t
_.Caution„
Other data
Ila
Address 2202 Ma le Hill
I Builder
,
HVAC conlracto
Testing
p
.V
I'm eXnaust
Airflow measurement metho F ow box _ Flow collar
_ Passive flow hood _ Pilot tube traverse
Temperature ofu air a ugitoo�F Indicated flow to Volumetric flow multipli
measurement too 6%
nt eQ 5000', air temperature
re
Measured Exhaust Airflow
Operation
Minimum
Exhaust Pickup location
Intermittent or
AirflowIndieated
Flow
Volumelde Flow
PassFait
Continuous
Requirement
(CFM)
(CFM 5,000)
CFM 5000')
piaster Bath
intermit _Conan
'50,cfni
73
80.154
❑ ��
U.L. Bath
Nolermit _Conlin
$O.cfni•
�69
75.762
—
_ ❑
Intermit Conlin
_ Intermit Conlin
.
❑�❑
�.
Intermit _ Conlin
❑
❑1
_ Intermit -Conlin
... ❑
=Ell
_Intermit _Conlin
�y
_Intermit _Conlin
Kitchen exhaust
Oven fuel Oas
clrlc
Exhaust airflow
Operation _ Intermittent _Continuous
Minimum exhaust aldlow requlremenlCFM 5000'
red alrflow,
Airflow measurement method =Flow box =Flow collar
II Passive flow hood I Pilot tube traverse
Temperature of air Through I-----aF Indicated flow to Volumetric flow
peramultiplier
measurement tool fl Q 5000', air temperature
Indicated flow I f FM Volumetric flowCFM 5000' 0 ! Pass tfti;j) Fall
, t_..�.
Testing notes (fan speed, masking,
flow out of range....
OLPC�
Machanical Systems Performance Testing Submittal FormV20120321 1 S� -4 24113
Systems other than sub -structural floor exhaust
t
' 'Min lmum exhaust airflow requirement
60
FM 5000'
`
Indicated to
Measured Airflow
I
Volumetric
Volumotric
Design Airflow
Measurement
Measurement Location +
Flow
Indicated Flow Flow Pass/Fall
(CFM 5000')
Method
Air Temperature(F)
Multiplier
(CFM) (CFM 5000)
�.
Agw box
Passive flow hood
-
-
-;
Total exhaust aldlow
-
_
Flowcollar
�,.
..1
Pilot tube traverse
nistr Bath
1.098
69 ".
75.762.. -
Flow collar - -
Total supply alrilow Pilot tube traverse p„
Flow box
L Passive flow hood -
r systems which supply airflow Is dreulaledlblhe aichandler fan, fan speed for measuremen Heal Cooling _Conlinuoos-tan
r1ealanced aldlow, In balanced systems
Average of measured suppl Target How rang ,
CFM 5000' : -iq CFM 5000'
and exhaust How (average +(-15%) ,
❑ 'Pass grate wFall
Sub -structural floor exhaust
Designairflow I ICFM 5000'
,,Measured aft -flow
Airflow measurement melho — Flow box _ Flow collar
I '
_ Passive flow hood _ Pilot tube: traverse,
` # Temperature of air through I1f�'I(1 Indicated flow to Volumetric flow multiplier I1f�IIf
ittt measurement tool 1 1F Q 5000', air temperature) 1
I {
Indicated flow CFM Volumetric flow CFM 5000' [IPass Fall
Temperature ofair k I
measurement
rementent to too 69
House conditioned floor area 3080 1 at
Indicated flow to Vofumetrlc flow multiplier 1 098'
Q 5000', air temperature
I.
Maximum Allowed Duel Leakage
Measured Duet Leakage
Illj
t}
i
Test Parameter and Conditions
Normalized Leakage
(CFM251100 sit
Absolute
Leakage
(CFM25)
Indicated Flow
CFM25)
Volumetric
Flow
(CFM25 5000'
Measurement
Timing
Air Handler
Pass1Fall
Total leakage
Rough -In
Excluded
4
❑
miQ
i
Total leakage
Rough -In
Included
6
❑
ter..
p
j
Total leakage
Complete
Included
12
El�°
q
i
i
Leakage to outdoorsC
mplete
Included
6246'
- -
37
t10.62❑
Mechanical Systems Performance Testing Submittai
y20f2032i
2ofa
F_Iiter type
( _( Bran skuttle
Is
Static pressures (OPTIONAL)
t'
(;
{ Mode:- Healing
Cooling
j
Continuous Fan
Fan speed tap
Humidifier bypass _ Open _Closed
—All registers open
—Zone dampers open
i„
P=.
I
tlfff
{ AP filter=
Type! style IBIS )OSRI)IC Thicknes 3° Inches MERV (optional)4 i
P=+
IF
AP AC coil =
P=+
is AP Total ESP =
1{Cooling: Measured air flow through indoor coil ushg flow grid
3 (Design cooling airflo I o2i CFM 5000' Target airflow limit; (design +1.1504) 869 to 1175 CFM 5000.
i d
i{Measured airflow
{jl! Cooling fan speed lap 1'Itgl] Flow grid plate siz _ 14 _ 20
Temperature of air Ihroug Indicated flow to Volumelrlc flow mulllpll�
j measurement too 67 F Q 5000', air temperature 1.098
` NSOP 73 Pa TFSOP 35.1 7 Pa Flow Resistance Correction Facto DG 700
i I Measured airflow, no adjustments or correction CFM Adjusted (indicated) airflo 101 g CFM
j Volumetric no 1 1 17.764 CFM 5000' Pass .,❑'-'�` � Fall
Heating: Gas manifold pressure
I OEM anifolprossur
specification, 5000 3.3 IWC Target manifold pressure limils (spec +l•5%) 3,1� 'to�1, 1r IWC
yy v�
1 Measured manifold presaur 3.35 IWC Pass '�,�❑t,. �' Fell
..1
Heating: Temperature rise `'
j OEM temperature rise Ilmll - L) ?> to 7 U F
j:Measured temperature rise
F i
I{� Return air F Supply air 1118 F
j�� Caution: Temp rise within
Temp rise 56 F _Pass Fall ❑ 10 F of top of range
Mechanical Systems Performance Testing Suemltteifo V20120321 3 of S
(This section under development, not yet being enforced)
Supply air flows (This section underdevelopment, not yet being enforced)
balance
difference limit, room -to -core 3'to,+3 '' ':` Pa
Room
Measured pressure I
drop (Pal Pass
Fall
master Bedroom
®�
e e.
.. ».
htechanlcal Systems Performance Testing Submillalfo V20120321 4of8
Outdoor temperature ,p ' ` L
Worst -case depressurization testing i IC A I e_ wed'PF tu+eC-
I ..1
_!Housesetup
N of bath fans on.
Vented range hood on
Clothes dryer on
Air handler on.
Fans on
Nested appliances
Applianc
Typi
Locatiol
'CAZ pressure
UP[ depressurization limit Pa wrt outside
Measured net CAZ depressurizalionPa wrt outside
ii OK (less negative) (.Caution (more negative)
BPI maximum limit
seconds
Measured spillage duration
seconds
Pass = duration not exceeding limit
tit pressure
BPI limit
Pa wrt CAZ
Measured
Pa wrt CAZ
Pass = pressure more negative than limit
concentration In undiluted flue gas
BPI maximum limit
ppm
Measured CO
ppm
Pass = CO level not exceeding limit
Caution a CO level 25 to 100 ppm
These doors.ars closed:
Oraft-hood
Induced -draft
_ gralthood
Induced -draft
_ Draft -hood'
Induced -draft
❑
Pass
M kall
Pass
- II
- Q
ass
'r,<r all
100
100
100
Pass
`Q' ell
❑
Pass
IIEl
ass
0'.. all
❑_
autlon
Cautlon El
11. autlon
Mechanical Systems Performance Testing SuemllleWo V20120321 5 of 6
System controls operating per design Intent
Approved Agency
}Name (print)
Title
lllf , company
>_ISignature and Dale
HVAC contractor
( Name (print)
Title
Company
. Signature and Dale
qvqtam
pas-4
Fall
Localexhousl
by
Whole house ventilation
_ O
,� )
Subivstructural floor exhaust
❑,t
_ ❑
�❑
Healing
Cooling
❑
❑
jjj
Owner/Operator
IMS Heating & Air, Inc.
Mechanical Systems Performance Testing SubmittAFo V20120321 6 of 6