HomeMy WebLinkAbout2501 Bar Harbor Dr - Disclosures/Mechanical - 04/13/2013`bl
City of Fort Collins
Residential Mechanical Systems Performance Testing Submittal Form
This form is a record of testing targets and results, with Pass/Fall outcomes. For information an measurement tools and testing techniques, see the "Residential New
Construction Mechanical Systems Testing Guide." The guide and this form may be periodically updated; check the Building Services web site for the current version.
This fom must be completed and signed by an "Approved Agency;' and submitted to Building Services as a requirement for receiving C.O.
Color key
HVAC
l tz
Measured value to
-�
'fUN ��
Tar et or If
g
eom are with target.o
pF��
Pass°i^
'�
Cau`tfo`n
Otherdata -
12501 Bar Harbor
UTMC"T-Tantirro 1
Testing date(s) "
ain exnaust
Flow ;box Flow collar.,
` Airflow measurement metho
Passive flow hood" Pilot tube traverse
— =
Temperature ofu air through Indicated Flow to Volumetric flow
measurement teo 68 F � @5000', air temperature 1.098
temperature
t
-"i Measured Exhaust Airflow
Operation
Minimum
Indicated
Exhaust Pickup Location
Intermittent or
Airflow
Flow
Volumetric Flow
PassPail
Continuous
Requirement
(CFM)
(CFM 5,000')
(CFM 5000')
master Bath.
Intermix _ Conlin
, 0 c
75
82.35
❑�
U.L. Bath
A(Wtermlx'. Conlin
50;oftu
64
66.978
5-�.
�❑
;
_�.
Intermit: Conlin
:
= Intermix _Conlin
Intermit
*v
❑
❑-`
- -
Intermit'. Conlin
r"i
--
❑
❑ `` "+
-
_ Intermix-_ Conlin
❑
_.o❑}
-
—Intermix Contin
g, ,
❑
Intermix — Conlin
Kitchen exhaust
Oven fuel Gas
ctric
Exhaust airflow Minimum exhaust airflow requirementCFM 5000'
r....._� — _ I
Operation intermittent. Contfnuous
!Measured airflow,
— _
Airflow measurement method Pass ve fl Flow tubecollar
Passiveflow:hbod _ Pilot tube traverse-
i Temperature of through �F Indicated Flow to Volumetric Flow ter
� measurement tool @ 5000', air temperature
fi f �I�1p,
Indicated Dow Ll FM Volumetric FlowCFM 5000' ❑ Pass Q' Fail
,
i Testing notes (fan speed, masking
1 flow out of range....
Mechanical Systems Performance Testing Submittal FormV20120021
1 of
other than sub -structural floor exhaust
n exhaust airflow requirement 60 1 a CFM 5000'
Indicated to
Measured Alrgow
Volumetric
.i Design Airflow Measurement Measurement Location +
Flow
Indicated Flow
Volumetric
Flow
Pass/Fall
d (CFM 5000') Method Air Temperature(F)
Multiplier
(CFM)
(CFM Saco')
OL-w boxy
Total exhaust airflow
—Passive flow hood.
'
-Flow: collar,
-
Not tube traverse
Bath " -zA ;�a
t098_
61;' 9 _
66978
_Flow collar'
,
>''
�• '
-Picot tube traverse
'
Total supply airTl_ow
Flow box • " ..
_
_ Passive flow hood
`!9n
Cooling, Continuous fart
For systems In which supply airflow is circulatecilbthe air handier fan, fan speed for measuremen _Heat
1l.
. -'Balanced airflow in balanced systems
Average of measured suppi Target flow rang f
CFM 5000' -to CFM 5000'
and exhaust Oow (average+/. 15/)`
j
J .. , , ,a Pass �Fati
Sub -structural floor exhaust
r, w
tDesign airflow ;e` CFM 5000,
!Measured airflow
!� Airflow measurement motho Flow bbk - _ Flow collar
Passive flow hood Pitct tube traverse
Temperature of air through Indicated Flow to Volumetric flow multiplier
measurement tool QF @ 5000', air temperature
s
Indicated flow CFM Volumetric flow CFM 5000' Q:�P ass .-Fail
Temperature of air throug
measurement too 67
Indicated flow to Volumetric flow multiplier
F @ 5000', air temperature
I House conditioned floor area 3080
i
sf
Maximum Allowed Duct Leakage Measured Duct Leakage
Test Parameter and Conditions
Normalized Leakage
Absolute
Leakage
Indicated Flow
Volumetric
Flow
Measurement
Timing
Air Handier
(CFM25 1100 sf)
(CFM25)
(CFM25)
(CFM25 5000')
PassfFatl
Total leakage
Rough -in
Excluded
4
❑
a`
, ❑`
Total leakage
Rough -in
Included
6
Total leakage
Complete
Included
12
Leakage to outdoorsC
mplete
Included
8
246
148`
Mechanical Systems Performance Testing SubmlttafFo V20120321 2 of 6
Filter type
�� �,, n
Bran S)CUtt)e Type/ style Disposable Thickness ---(inches MERV(optional)
pressures (OPTIONAL)
Mode: Heating
_ Cooling
_ Continuous Fan.
Fan speed tap
Humidifier bypass _ Open _Closed
All registers open
_Zone dampers open
._T
hP filter
P=.
P=+
X—
aP AC coil =_
P=+
dP Total ESP =
Cooling: Measured air flow�ndoorColl usitg flow grid
Design cooling airflow ) 022 CFM 5000' Target airflow limit; (design +1- 15%) 869 .� to . 1175 " CFM 5000'
S Measured airflow
Cooling fan speed tap High
i
y /t Temperature of air througl
l/ measurement too 6% F
NSOP 22.3. Pa TFSOP — 2".. Pa
j Measured airflow, no adjustments or correction CFM
Volumetric flo I I I7.764 CFM 5000' '; PaSE
Flow grid plate siz _ 14 _ 20..
Indicated flow to Volumetric flow multipli @ 5000', air temperature
Flow Resistance Correction Factor!D—G 700
Adjusted (indicated) airflo I0I.8. CFM
�.: Fall
Heating: Gas manifold pressure
( OEM manifold pressur
specification, 5000 3.3° IWC Target manifold pressure limits (spec +/- 5%) I7, ta•7 .�', IWC
I
,� •t Measured manifold pressur 3 3 IWC Passg� [,Fail
Heating: Temperature rise
af
I OEM temperature rise Itmit q o to '! 0; F
Measured temperature rise
1 S
Return air 65 F Supply air
Temp rise 52 F
U475111111
116 �F
IPA
AFail
El Caution: Temp rise within
10 F of top of range
Mechanical Systems Performance Testing Submidatfo V20120321 0 ol5
(This section under development; not yet being enforced)
Supply air flows (This section under development, not yet being enforced)
Pressure balance
r-�Pressura difference limit, room -to -core —Ito +$ `, - JPa
t i
Room
Measured pressure
Pass
Fail
d
drop (Pa)
master Bedroom_
-0.4
Bedroom 2mid
Bedroom3 / front-
+0.7
0
X.
q �e aa4itdtl 4
-k
OR
Mechanical Systems Performance Testing SubmittaYFo V20120321 4 of 6'
I . I
Outdoor temperature
Worst -case depressurization testing
r-.:l
';House setup
appliances
E pressure
BPI depressurization limit
Applianc
Typ
Locallo
Pa wrt outside
Measured not CAZ depressurizationPa wrt outside
OK (less negative) I Caution (more negative)
BPI maximum limit
Measured spillage duration
Pass = duration not exceeding limit
it pressure
BPI limit
Measured
seconds
seconds
Pa wrt CAZ
Pa wrt CAZ
Pass = pressure more negative than limit
concentration in undiluted flue gas
BPI maximum limit PPM
Measured CO PPM
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
-Draft-hood
, ,
Draft -hood
Ind uced -draft
ndc,
�Irtcluced-draft',
6V
W
60"
1pass
U lic if
C]
P..
11
D
ass
11MVall
i7 j
III] kall
'El
1P...
!-,all
Cl ass
11 lFail
Caution
Caution
tion
Mechanical Systems Performance Testing Submittakfa V20120321 5 of 6
System controls operating per design intent
Approved.Agency
'Name (print)
Title
Company
Signature and Data
HHV1AC contractor
j
jP( -Name (print)
(-+ Title
i
Company
I
La 'Signature and Date
�
System
Pa
Localexhaust.
Whole -house ventilation
CI "
Sub -structural floor exhaust tom+
❑_._ _.
❑F'
Heating
Cooling
' ❑
❑
Paul Higmare = .
Energy Rater
Thermal Concepts/ Allied.
y-is -173
—Dwayne Shawver
Owner/Operator
IMS Heating &..Air, Inc.