Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
901 Riverside Ave - Special Inspections/Blower Door Test - 03/06/2013
0 li htl treadin �d� J Y J Advoncing Comfort and Effi ency. Air Leakage Test Results Main Level goi Riverside Ave. Fort Collins, CO Standard is 0.25 CFM/sq. ft. of Envelope Area Pressurize Set Flow per unit envelope area: Test Date and Time 7/h li htl treadin 9 Y 9 Advancing Comfort and Efficiency. 0.343 CFM per square foot +/-3.5% 2013-03-06- 15:36 Height x Temperature difference: 126 ft Fo Air leakage coefficient, Cp: 83.20 CFM/Pan Exponent, np: Correlation coefficient, r2 Air flow at STP: Air change rate: Test Data +/- 32.0% 0.7275 +/- 9.6% 0.9908 1840 CFM at 75 Pa +/-3.5% 4.895 air changes / hour at 75 Pa +/-3.5 % Induced 24.7 30.4 36.6 41.6 43.9 49.0 55.9 6o.i 65.1 70.1 74.6 80.2 Building Pressure (Pa) Measured 49.1 61.7 73.5 80.6 92 108.2 119.8 142 156.5 168.5 181 195.5 Flow (C8) Corrected 944.2 1070 1161 1194 1327 1471 1528 1730 1828 1897 1972 2053 Flow (CFM) Error 4.0% 2.5% -2.2% -7.8% -1.4% 1.3% -4.1% 3.2% 3.0% 1.4% 0.9% -0.2% M Induced pressures taken for 10 seconds. Bias pressures taken for 10 seconds. Environmental Conditions Wind speed: o mph from the Operator Location: Inside the building RA treadinli hti mo g Y g Advancing Comfort and Efficiency. Initial Conditions: Bias Pressure: -1.92 Pa, Temperature: indoors: 62 °F, outdoors: 53 V. Final Conditions: Bias Pressure: -2.02 Pa, Temperature: indoors: 59 °F, outdoors: 51 V. lightlytreading "Aw Advancing Comfort and Efficiency. Pressure MENEM M ONE la� Reacings Building Gauge Pressure vs. Flow .��_� M I'm Pressure (Pa) treadinli htl J Y g Advancing Comfort and Efltciency. Combined Test Data Results Uncertainty Airflow at STP, CFM at 75 1310 +/-2.6% Air change rate at 75 Pa [/h] 3.485 +/-2.6% Flow per unit envelope area at o ,244 +/-,;.o% 75 [cF•nr/P2I Equivalent leakage area at 75 Pa 140.5 +/-8.4% (in2] LBL Effective leakage area at 4 Pa 45.15 +/-13.0% [inz] N ri Induced:p s _ x ©-Primary Gauge ., Other Gauges Primary Ga6gi 0 Other Gauges90 601 1° y 4 d 4� essure , �> x, Depressurize) )epressurize) , ;Pressurize(; �ifl,• : h , >ressurize) lightlytreading cow, 07. treadinli htl 9 Y 9 Advancing Comfort and Ef.riciency. Calibration Certificate Retrotec 2000 . Range N K K1 K2 O en(22) 0.5214 1 .618 -0-07 0.8 -0-115 1 A 0.503 26 6 -0.0 1 0 1 B 0.5 174.8824 0 0-3 0 1 C8 0.5 78.5-0.02 0.5 o.o16 1 C6 0.505 61.3 0.054 0. 0.00 1 C4 0-5077 42 0.009 0.5 0.0009 1 Cz 0.52 22 0.11 0. -0.001 1 C1 0.541 11.9239 0.13 0. -0-0014 1 L4 o. 8 4.0995 0.00 1 0.0004 1 L2 0.502 2.o6 8 0 0.5 0.0001 1 Li 0.4925 1.1614 0.1 0.5 0.0001 1 City of Fort Collins Building Air Leakage Testing Protocol Building Air Leakage Test Protocol - Test Form (Note: this test form is procedural and results can be reported in alternate formats.) Building name: Houska Tire and Oil #2, Main (Lower) Level Retail Building address: 901 Riverside Ave. Prime contractor. Heath Construction Contact Albert Hamill Testing agency: Lightly Treading, Inc. Address: 4303-3 Brighton Blvd. Denver, CO 80216 Testing agency contact Mark Rogers Phone: 303-733-3078, ext. 304 Email: markr@lightlytreading.com Lead on -site personnel: Albert Hammill Phone: 970-567-1422 Test date: 3/6/13 Additional information: The tests were conducted on two separate spaces. This report is for the main (lower) level retail space. Witnesses: Name: Albert Hamill Organization: Telephone/ Email: Heath Construction 970-567-1422 INSERT PHOTOGRAPHS OF SUBJECT BUILDING: Testing agency to provide digital photographs of subject building, setup, test procedures, and diagnostic evaluation to the client. Page 23 of 37 City of Fort Collins Building Air Leakage Testing Protocol City of Fort Collins Certification of Compliance OW' Of ' Building Air Leakage Test Results Fort Collins Pressurization Metric Requirement Actual Requirement Met/Not Met n 0.45 < n < 0.8 0.7275 Requirement Met C N/A 83.2 N/A r2 r2 > 0.98 0.9908 Requirement Met CFM75/sq ft Actual < 0.25 CFM75/sq ft 0.244 Requirement Met 95% C.I. Upper N/A 3% N/A 95% C.I. Lower N/A 3% N/A E LA75 I N/A 197.5 sq. in. N/A Devressurization Metric Requirement Actual Requirement Met/Not Met n 0.45 < n < 0.8 0.6999 Requirement Met C N/A 39.80 N/A r2 r2> 0.98 0.9981 Requirement Met CFM75/sq ft Actual < 0.25 CFM75/sq ft 0.146 Requirement Met 95% C.I. Upper N/A 1.8% N/A 95% C.I. Lower I N/A 1.8% N/A E LA75 I N/A 83.8 sq.in. N/A Average Metric Re uirement Actual Pass/Fail CFM75/sq ft I Actual < 0.25 CFM75/s 1 0.244 Pass Testing Agencv Certified Compliance with the Protocol 1 The test boundary area was obtained from the Architect of Record and was checked on -site for reasonableness. M R Initial 2 Set up was performed according to section 2 of the test form and all deviations and their impact noted here. M R Initial 3 Test equipment used was in compliance with respect to accuracy and calibration date. MR Initial 4 The test procedure used was in compliance except as noted here. M R Initial 5 The calculations were done in strict accordance with ASTM E779-10 except as noted in this Protocol. MR Initial Page 32 of 37 49 City of Fort Collins Building Air Leakage Testing Protocol 6 Provide the value calculated in step 5.15 (or, 5.11 or 5.4 if a hcable). 0.244CFM75/s ft 7 Determine pass/fail status based on the average of pressurization and depressurization. Pass/Fail 8 All accuracies, pressure limits, and data correlations and confidence intervals are within the bounds specified in steps 3, 4 and 5 and all deviations are noted here. M R Initial 9 Supporting documentation described in steps 1, 3, 6, and 7 is attached to this test form, including all digital M R hoto a hs of the buildingand test procedure. Initial I herby certify that the results above are in conformance with the City of Fort Collins Air Leakage Test Protocol. Testing agency name: Lightly Treading, Inc. Testing agency authorized representative signature: Testing agency authorized representative printed name: Mark Rogers Date: 3/7/2013 Page 33 of 37 0 li htl treadin �d� J Y J Advoncing Comfort and Effi ency. Air Leakage Test Results Main Level goi Riverside Ave. Fort Collins, CO Standard is 0.25 CFM/sq. ft. of Envelope Area li htl treadin Advancing Comfort and Efficiency. file name: Building address: 901 Riverside Ave. Houska901 Rivers ideAve_LowerLevel_6Ma rch2013_Test2 Test technician: Mark Rogers Building description: Houska Tire & Test company: Lightly Treading, Inc. Lube Retail First Floor Fan Model: Retrotec 2000 Fan SN: Fr4000823 Gauge Model: Gauge SN: 201621 DM-2 Leakage rate The measured air flow at a test pressure of 75 Pa was 1310 CFM which equates to an equivalent leakage area of 90.45 square inches which also equates to a one inch gap 7.5 feet long. Your building has a leakage rate that would be equivalent to a hole of this size if all the holes and cracks in the exterior were added together. - Results: Flow per unit envelope area at 51CFAI/ft l 0.24 +/ a.oro Since the standard is 0.25 CFM or less air leakage at 75 Pascals of pressure, this building PASSES this standard. Depressurize Set Flow per unit envelope area treadinli htl 9 Y g Advancing„Comfort and Efficiency. 0.146 CFM per square foot +/-1.8% Test Date and Time: 2013-03-06- 15:17 Height x Temperature difference: 141 ft F0 Air leakage coefficient, Cp: 39.80 CFM/Pan Exponent, np: Correlation coefficient, rz Air flow at STP: Air change rate: Test Data +/-12.7% 0.6999 +/- 4.4 % 0.9981 781.o CFM at 75 Pa +/-1.8% 2.075 air changes / hour at 75 Pa +/-1.8 % Induced -24.3 -30.6 -35.3 -40.1 -44.9 -51.2 -55.6 -61.3 -64.1 -71.2 -75.7 -79.7 Building pressure (Pa) Measured 17.5 23.4 31.8 37.2 45.2 54.2 57.2 67.8 71.2 83.5 87.9 92.2 Flow (C8) Corrected 356.3 411.8 480.1 519.9 573.3 628.5 646.6 705.0 722.7 784.6 806.0 825.9 Flow (CFM) Error -0.7'%o -3.2% 1.9% 0.6% 2.3% 2.0% -1.0% 0.74Yo 0.0% 0.7% -0.9% -2.2% M Induced pressures taken for 10 seconds. Baseline pressures taken for 10 seconds. Environmental Conditions Operator Location: Inside the building Initial Conditions: Baseline: -0.98 Pa, treadinli htl 9 Y 9 Advoncing Comfort and Efficiency. Temperature: indoors: 63 °F, outdoors: 53'F. Final Conditions: Baseline: -1.22 Pa, Temperature: indoors: 62 °F, outdoors: 53'F. T �0 lightlytreading Advancing Comfort and Efficiency - Pressure Em W MEMO lose ■ell® Emission { , smile ~•.oil 0 S { �� oil,. Pressure vs. Flow s.=Enduced'Pressure Total((3zpressunzej' ' ival ran(Oepressurize): . Pressure (Pa).