Loading...
HomeMy WebLinkAbout5126 Exploration Ln - Disclosures/Mechanical - 03/25/2013City of Fort Collins Residential Mechanical Systems Performance Report This form is a record of testing targets and{esults, with Pass/Fail outcomes. For Information on measurement tools and testing techniques, see the "Residential New Construction Mechanical Systems Testing. Guide.' The guide and this form may be periodically updated; check the Building Services web site for the current version. This form must be completed and signed by an 'Approved Agency." and submitted to Building. Services as a requirement for receiving a C.O., Bath exhaust _ Airflow measurement method v-t' Indicated flow to Volumetric flow multipll x ,4 Temperature of air through Q f ; r ;3 x a�; } vs F @ 5000, air temperatu measurement tool _ <. W;J .: wpasured Exhaust Alrflow Operation � Minimum _' Airflow Design Airflow . Indicated Volumetric Flow Pass Fail Exhaust PickupLocation Intermittent or Requirement (CFM Flow (CFM5000') Continuous (CFM �� �� CFM). ': ( . Kitchen exhaust Oven fuel =Gies , ,r Gf: NIA — Kitchen hood does not vent outside FJeefnc Exhaust airflow Operation[] a fl-Q£� 'gyp — Minimum exhaust airflow requirement CFM 5000 Measured airflow 77 t7ow bole a 'rx��r k LllalS Y i 4 Airflow measurement method big mkiy Temperature of air through' 4 F Indicated flow to Volumetric Flow multiplier measurement tool y @ 50001, air tem i �. Indicated Testing no Medmnirel Systems Pertoasenae Tesft Suhmftlai Form V20120608 i of s Systems other than sub -structural floor exhaust Minimum exhaust airflow requirement MENMCFM 5.009 . Indicated.to Volumoulle Measured Airnew Volumetric Design Airflow Measurement Measurement Location + Flow Indicated Flow Flow Pass/Fail (CFM 5000) Method : Air Temperature (F) Mumplier (CFM) (CFM 50001 ;' p ,� >< ♦3asshre�lkwaiood.. �' O y ( f f k I ~ x t Total exhaust etdlow " J / �'�Bot+tube'tralte?se t < 5" ro'FFlowr�olhdFn r u1 �1 if $ V y' n, '. i t <yk- t w -PiiOtlltila..l+TaVBrSe r '. i e r �. Total supply airflow r N` , J r i f�ewiex r systems in which supply airflow is circulated by the air handler fan, fan speed for measurement Balanced.airflow in balanced systems Averageof measured su ix Target flow rang ak CFM 5000' ppty u ; j CFM 5000' r �. and exhaust flows (average:+/-.15%) - tiA ' PassI ffj= Fail Sub -structural floor exhaust r WA —no sub structural floor exhaust system Design airflow WM CFM 5000' Measured airflow Ftowf x FIg54k ollet Airflow measurement method Q , �, _ P to_ t*Wbe fraiierse - Temperature of air through F Indicated flow to Volumetric flow multipiie measurement tool , < 5000', air temperetu" Indicated flow i ra! CFM Volumetric flown CFM 5000' i� ass Fail House conditioned floor area i` $� r sf Temperature of air thrc measurement Indicated flow to Volumetric flow 50017, air ter Maximum Allowed Duct Leakage Measured Duct Leakage Test Parameter and Conditions Normalized Leakage (CFM25 / 100 sf) Leakage Absolute (CFM25) Indicated Flow (CFM25) Volumetric Flow (CFM25 5.0001 Measurement Timing Air Handler Pass/Fail Total leakage. Rough -in Excluded 4 ?r^_ 6 ` Total leakage Rough -in Included 4K Total leakage Complete Included 12 Leakage to outdoors Complete Included Mechanical Systems Perlomierne Tesffrg Submittal Forth V20120608 2 of 6 Filter type Brand Static pressures (OPTIONAL). Cooling coil installed —Y —N Mode: Heating Cooling Continuous Fan Fan speed tap Humidifier bypass Open _—Closed All registers open P=- AP filter Type / style!N�11 ;K Thickness Inches V n P = . .51 P=+ P=+ • MERV (optlonal)[,.*,,,"�,+,,�,",,�"r� AP AC coil I AP Total ESP Cooling: Measured air flow through indoor coil using flow grid NVA --no AC system installed 7-771 CFM 5000' -, �, - et airflow limits (design CFM SWO Design cooling airflow Ta NA, Meas.ured,alrflow Cooling fan speed tap Temperature of air through F measurement NSOP Pa TFSOP F. Pa Measured airflow, no adjustments or correction CFM Volumetric flowr CFM 5000' N Pass 1 Flow grid plate size r25r Indicated flow to Volumetric flow mullipliet16 J @ 5000', air temperature - Row Resistance Correction Facto Adjusted (indicated) airflow Ja.2G CFM Fail Heating: Gas manifold pressure OEM manifold pressure 7 IWC Target manifold pressure limits (spec 50/6), IWC specificat Measured manifold pressure 3, IWC.Pass Fail 1,,-A "gating: Temperature rise OEM temperature rise limits F Measured temperature rise F Return air F Supply air Su Temp rise[; Fv» Caution: Temp rise within Pass Fall IOFoftop i r ofrange ,Kteduu*ejSystems perWaranceTesWVSub ffitWForm - V2012M 3 of 6 (This section under development, not yet being enforced) Register air flows All registers are cut through finish materials and moving air Pass Fail (Remainder of section under development, not yet being enforced) Pressure balance Pressure difference limit room-W-wre WPANMpa pressure Room IMeasured pass Fail drop (pa) .� as ry; t r '' 1•� l !r .nh':�s `t.S-: A:i� k nK. i� 'f i +.t• > fY" t f k{ }:.Y j r�^.' .te7' �1S..a +? +i. rXK � ,+4 .., 3 2�K�s3? "- _ �.^. P' - ✓.� 'J L � ., ^n x.. 1: f`am.. I y� jl /t •Z eyi F `" F V h 3 -4JI a y i� rn�� f ...1 .. H �F (- ff y l� St• S M'. _ �� t' 1 TFL V FI � - �•}. v,� aµ3tc',j,. s #%m.P '�r"�Pi4f'i, a r{' r^ tv+r f>•?'d'3.3 w'*'i ,ram' y8 f a1.avi:�.tiw1L.."'dr 1 . ��.I �' .1�J 'L'3• 2`yZ-F � nemi- x z*ro"��{, z �rs 5 r vm� ..- { �. W���� ..SY+y,F /,.j'[,�+ •.,, .✓,ri�� �a r� � v_-.5 {�(FvhL' N 4 c �F `31JZ ^. 'L '�''Y"t°N' t��s% ITA+��S i c"- T F� { '.:f?' r a -a h r.. ' y rq 4 �r 1:. e � T v: i � E� x 1 f �•p�aS'�L sr4. �,.y -y`r ?'<' ,t*x✓ d t` �. r 'ht `' as � � _. t .- a ` `, � � ' <w � ri F t TMIR. Mechanical Systems Performance Testlrp SubmdW Form V20120608 - 406 NA no natural draft combustion appliances edepressurization testing House setup appliances Applianci Locaboi CAZ pressure BPI depressurization limit Pa wn outside Measured net CAZ depressurization Pa wrt outside OK (less negative) I Caird.on (more negative) Spillage BPI maximum limit seconds Measured spillage duration seconds Pass = duration riot exceeding limit Draft pressure BPI limit Pa vM CAZ . Measured Pa wrt.CAZ Pass = pressure more negative than limit CO concentration in undiluted flue gas BPI maximum limit ppm Measured CO PPM Pass - CO level not exceeding limit Caution - CO level 25 to IGO PPM Outdoor temperature � F 4-!i I d - fa i FIR oq 0410f,"31-i" OEM 1", in MONROE= LffW&.,pass Fail Pass EFaal Pass Fail Caution Caution Carltlon Medwj0Cw systems peftmarece Tm" SubmRW Form V20120608 .5 . of 6 System controls operating per design intent System Pau Fail Localexhaust r Whole -house ventilation' Sub -structural floor exhaust Heating Cooling Approved Agency (technician performing Inspection and testing documented on this form) ' ,•. Y` 2,i, - 1 b''y S ti x �a M'"t1 '� d-"• �Ya �} il2r'' rc .t .sl'� -3 N.. +�N! Ea' _c r ^%'� G" � t }�' �7iFter r ''f :.r .�, ''3.` .tlt"W�S'^1�-i• to x 4'x...�r I ::ii 1 ...... .:4F..._. •.��.. �n� .-..:3 _(.n�k..�>....♦ �I:. KrI-. .... n..4' .. n.v.�.A�a! .irv. ♦ ,r '. I Name (print) Title Company Signature and Date HVAC contractor (Fort Collins license holder) y Name (print) Title 's Company _._;".:..._.... Signature and Date Mechanical system Peduar nce Testing Subn sl Form V20120606 6 of 6