Loading...
HomeMy WebLinkAbout427 Bow Creek Ln - Special Inspections/Engineering - 02/01/2013mrr ucuurel • heorecnnicai RMG ENGINEERS www.run gengmeers.corn Job No. 136778 f;. February 1, 2013 J & J Construction of N. Colorado 7251 W. 20th St. L-200 Greeley, CO 80634 Re: Open Excavation Observation 427 Bow Creek Ln Lot 29, Block 12, Provincetowne Subdv Fort Collins, CO Dear Jeff: go RMG Engineers Group (RMG) conducted a foundation excavation review for a single-family residence under construction at the above -referenced site located in Fort Collins, CO on February I, 2013. The footings were excavated to a layer of moderately expansive sandy silty clay and/or claystone/siltstone bedrock, which is similar to those soils described in the Final Geotechnical Exploration Report, Provincetown Subdivision, Third Filing, Phase 2, Fort Collins, Colorado, prepared by Total Engineering Service, Inc.,TES project number 12-137 and dated August 8, 2012. RMG did not encounter groundwater within three feet of the proposed footing elevation. The footings need to be over excavated a minimum seven feet (7') in depth. The expansive soils should be replaced with well compacted structural fill. The soils supporting the footings will then be a low expansive material. Based on the soil conditions encountered within three feet of the footing level, a continuous spread footing may be designed and constructed in accordance to the above mentioned Final Geotechnical Exploration Report. Should you have questions, please feel free to contact our office. Cordially, M. �v 3/4/13 24995 m` Thomas M. Cope �QNA . ti Professional Engineer Southern Office: Central Office: Northern Office: Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620 719.548.0600 303.688.9475 970.330.1071 Monument: 719.488.2145 Pueblo: 719.544.7750 woodland Park: 719.687,6077 Sere icG;rel • Ge,nrcchnical ENGINEERS 1601 371h ST. • EVANS, COLORADO 80620 • 970-330-1071 • FAX 970-330-1252 Job No. 136778 February 6, 2013 Mr. Jeff Demaske Journey Homes, LLC 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Visual Compaction of Fill Review 427 Bow Creek Ln Lot 29, Blk 12, Provincetowne Fort Collins, Colorado Dear Jeff: As requested, personnel of RMG Engineers Group (RMG) observed the compacted fill placed in the over -excavated foundation excavation. We visually found the fill to be complete and in substantial compliance with the recommendations of the foundation excavation observation letter dated February 1, 2013. Should you have questions, please feel free to contact our office. Cordially, Thomas M. Cope Professional Engineer ��� �vs{stt/l l001 Structural • Geotechnical RMG ENGINEERS Job No. 136778 February 15, 2013 J & J Construction of N. Colorado 7251 W. 20th St, L-200 Greeley, CO 80634 Re: Foundation Subsurface Drain Observation 427 Bow Creek Ln Lot 29, Block 12, Provincetowne Subdv Fort Collins, CO Dear Jeff: As requested, personnel of RMG Engineers Group (RMG) observed the foundation subsurface drainage pipe and sump pit perimeter drain system on February 13, 2013. RMG found it to be complete and in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure at the date of this observation. Should you have questions, please feel free to contact our office. Cordially, Sp REG v 2/18/13 q •% 24995 Thomas M. Cope S/OINYALL E Professional Engineer Southern Office: Central Office: Northern Office: Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620 719-548-0600 303.688.9475 970-330-1071 Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.68T6077 Structural - Geotechnical RMG ENGINEERS ��""'��� www, rnngengineers.com Job No. 136778 February 20, 2013 J & J Construction of N. Colorado 7251 W. 20th St, L-200 Greeley, CO 80634 Re: Foundation Wall Observation 427 Bow Creek Ln Lot 29, Block 12, Provincetowne Subdv Fort Collins, CO Dear Jeff: As requested, personnel of RMG Engineers Group (RMG) observed the foundation formwork and reinforcing steel for the above referenced single family residential property and found them to be in substantial compliance with the design drawings prepared by High Plains Engineering & Design LLC for this structure. The foundation walls were observed on February 7, 2013. Should you have questions, please feel free to contact our office. Cordially, c' s nt:''•• l �.�3/2/13'. 24995 Thomas M. Cope S�ONAi ti Professional Engineer Southern Office: Central Office: Northern Office: Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620 719.548.0600 303.688.9475 970330.1071 Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077 IN ctural • Gectechnical RMG GINEERS mvw tngengineers.com Job No. 136778 February 20, 2013 J & J Construction ofN. Colorado 7251 W. 20th St, L-200 Greeley, CO 80634 Re: Footing Observation 427 Bow Creek Ln Lot 29, Block 12, Provincetowne Subdv Fort Collins, CO Dear Jeff: As requested, personnel of RMG Engineers Group (RMG) observed the footing formwork and reinforcing steel for the above referenced single family residential property and found them to be in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure. The "Ufer" electrical ground system was placed in the footing and meet the requirements of Article 250.52(A)(3) of the 2008 National Electrical Code (NEC). The footings were observed on February 6, 2013. Should you have questions, please feel free to contact our office. Cordially, � p RQ, 3/2/13 `gyp ' 24995 m' Thomas M. Cope /OVAL Professional Engineer Southern Office: Central Office: Northern Office: Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620 719548.0600 303.688.9475 970.330.1071 Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077 NStructural - C�eotechnical RMG EGINEERS Qz� www. rmgengineers.com Job No. 136778 February 20, 2013 J & J Construction of N. Colorado 7251 W. 20th St, L-200 Greeley, CO 80634 Re: Foundation Damp Proofing 427 Bow Creek Ln Lot 29, Block 12, Provincetowne Subdv Fort Collins, CO Dear Jeff: As requested, personnel of RMG Engineers Group (RMG) observed the foundation damp proofing and found it to be complete and in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure at the date of the inspection. The damp proof was observed on February 11, 2013. Should you have questions, please feel free to contact our office. Cordially, M ON S'!A,-REG/s 3/2/13 24995 Thomas M. Cope s�DNAL ti Professional Engineer Southern Office: Central Office: Northern Office: Colorado Springs, CO Englewood, CO 80112 Evans, CO 80620 719.548.0600 303.688,9475 970.330.1071 Monument: 719.488.2145 Pueblo: 719.544.7750 Woodland Park: 719.687.6077