Loading...
HomeMy WebLinkAbout427 Bow Creek Ln - Disclosures/Mechanical - 03/25/2013e)I bD0-31 ( City of Fort Collins Residential Mechanical Systems Performance Testing Submittal Form This form is a record of testing targets and results, with PassiFail outcomes. For Information on measurement tools and testing techniques, see the "Residential New check the Building Services web site for the current version. Construction Mechanical Systems Testing Guido:' The guide and this form may be periodically updated; This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O. Measured value to Target o'r Iimlt compare with target o „ -' "Pass ��eall�k 4Coutlon_ ; - 'Other data,- , Color key Address 427 Bo%vcreek- Tesflngdale(e) $ 01 BuIldet Journe i Hot , HVAC contracto r T ` Bath exhaust (` wbox _Flow collar. ;tk Alrflow measurement metho ^ Passive flow hood: Pilot tuba traverse `--"- Temperature of air throng Indicated flow to Volumetric flow multlpli r F 1.098 .; Q5000', air temperature measurement too 67 Operation Minimum Airflow Indicated Volumetric Flow PassFall haust Pickup Location Intermittent or Requirement Flow (CFM) (CFM 5,000') Continuous - CFM 5000') 6master mterma _Conlin 0, ,d F 566 73.1ath �- Bath _ ermu _Conlin rm)f _ Connn 5,0=cfilt ;; SO cfina 73', 69' 80:154 75.762 wdr Inlelmiit. _Conlin Intermits _Conlin intermit _ Conlin Intermit _Conlin Inlormit Conlin Kitchen exhaust Gas Oven fuel — leclrlc Minimum exhaust airflow requlremenlCFM 500 Exhaust airflow E' Operation _Intermittent _Continuous y- ,!Measured airflow, _ Flow box _, Flow collar Airflow measurement method passive flow hood _ Pilot tube traverse erature of a Tem ir through Indicated now to Volumetric flow multiplier P �F Q 5000'. air temperature k measurement tool © Pass ;0, Fall 1 Indicated flow FM Volumetric flowCFM 5000' ) I Testing notes (fen speed, maskin! flow out of range,... i ol6 1.lechanlcal Systems Performance Tasting Submittal Fonr1V20120321 Systems other than sub -structural floor exhaust Minimum exhaust airflow requirement �.I SS FM 5000' Indicated to Measured Airflow Design Measurement Volumetric Measurement Location; Flow Indicated Flow Volumetric n,.Method Air Temperature(F) Multiplier (CFM) Flow Pass/Fail C-( (CFM 5g00') dw 6oiiTotal exh= PassiveDow hood._ collar Flo_PltottubeVaverse Pilo Ul:Batli 1.098 73 80.154collar— Total sup_ Pitot tubefraverso _Flow b_Passive flowhood. - r o` For systems In which supply aldlow Is circutatedlbthe air handier fan, fan speed for measuremen _ Heal Cooling Contlnuousrem `Balanced airflow In balanced systems Average of measured suppl ' and exhaust flow - CFM 5000' Target flow rang < �` (average+l• IS%.) +- .` to; ,' _. CFM 5000, Pass E10F3Fall Sub -structural floor exhaust (Design airflow, CFM 5000, ,Measured airflow . Airtlow measurement melhoC—Ffowbox Flow collar sive flow hood Pilot lobe Traverse Temperature of air through measurement fool F Indicated flow to Volumetric flow multiplier QQ 5000', air temperature I Indicated flow CFM Volumetric flow CFM 5000, P �-i (tt -.Pass Fall Temperature of air througi measurement too 68 F House conditioned floor area 2456 sf Test Parameter and Conditions leakage leakage leakage as to ou Indicated flow to Volumetric flow multiplier @ 5000', air temperature EEI Maxlmum Allowed Duct Normalized Leakage (CFM251100 all 4 8 12 8 Mechanical Systems Performance Tosting Submilloffo V20120321 Absolute Leakage (CFM25) Measured Duct Leakage Indicated Flow Volumetric Fiow !-4 ❑. 35 i-. 2 of Filtertype {i 'i eras urolatoC f312 c pressures (OPTIONAL) Mode: _ Heating _ Cooling Continuous Fan Fan speed lap. Humidifier bypass _ Open _Closed _ All registers open _ Zone dampers open �T AP tiller = Type I style DIS )Os1b1t; Thicknes =Inches MERV(optional){---� P=- :T p=+ AP AC coil = . AP Total ESP = Cooling: Measured air flow throu h Indoor coil usirg flow grid Oesign coaling alAlo "132U CFM 5000' Target airflow limit; (design +1- 15%) 1 ,�"22. K tO 1518 CFM5000' Measured airflow j Cooling fan speed tap High " Temperature air thr�F measurement too68 I, NSOP "29.3 -Pa TFSOP r28.4 Pa Measured airflow, no adjustments or correction 1CFM i yj Volumetric rlo 1418.616 CFM 5000' Pass Flow grid plate siz 14 _ 20 Indicated flow to Volumelrc flow mulllPll rl.•O�g,.:. Q 5000', air temperature Flow Resistance Correction Facto DG 700 Adjusted (indicated) airlfos 1292' CFM =Fail Heating: Gas manifold pressure I {i OEM manifold pressu 9 C specification, 5000 3.3 IWC Target manifold pressure limits (Spec +l-5/) 3�3 (to..�5� IWC JJ Measured manifold pressor 3,4 IWC Q[I— , ,Pass IRE � �,•, Fail 4. 3 Heating: Temperature rise OEM temperature rise Ilmll A O to 70r F #Measured temperature rise Return air 68 F Supply air 123 F Caution: Tomp rise within Temp rise S $ F ,Pass Fall 10 F of top or range t.lechanical systems Performance Testing suemitiflWo V20120321 3 of 6 (This section underdevelopment, not yet being enforced) Supply air flows (This section underdevelopment, not yet being enforced) difference limit, room -to -core 1 416 +3,... Pa Room Measured pressure Pass Fall drop (Pa) master Bcdroom +1.2� Bedroom 2 Front middle -0.9 �_ ❑t ` a Bedroom 3 Front end _ 1.3 ❑' ❑ of 4,� ❑ El .a tm?". !.Mechanical Systems Performance Testing $ubmiQoiPo V20120321 4 of 6 Outdoor temperature F Worst -ease depressurization testing i-`House setup !/ L appliances Applianc Typi Locelloi Z pressure BPI depressurization limit Pa wrt outside Measured not CAZ depressurizatlonPa wrt outside OK (less negative) ( Caution (more negative) BPI maximum limit seconds Measured spillage duration seconds Pass - duration not exceeding limit it pressure BPI limit - Pa wrt CAZ Measured Pa wrt CAZ Pass = pressure more negative than limit concentration In undiluted flue gas BPI maximum limit ppm Measured CO ppm Pass - CO level not exceeding limit Caution - CO level 25 to 100 ppm 71. _ Draft -Hood- induced draft-. _ Draft -hood _ _ 'Induced-dtafte _ Draft -hood." ` = Induced -draft - ❑. OK 'Q; Caution on %%❑_ K ❑ Caution 60 % 60 80 - . ❑- Pass 0' ail ❑, Pass 3 it 1 ❑. Lass uail 100 100, 100 ❑2. Pass `n. all ❑ Pass IrLAII ❑ ass I LAall outlon Qr Caution EF aution Mechanical Systems Performance Testing Submittalfo V20120021 Set 6 System controls operating per design Intent Approved Agency (I r_ 1 1; - Name (print) 1 Title 4 1, Company LIsignature and Date HVAC contractor F , {"4. iName (print) Mile Company. f _Signature and Dale RVOOM pass Fail localexhaust Whole -house ventilation 'ml. ❑ g, ,�/ Sub -structural Door exhaust I" ❑ ❑�� Healing Cooling ecnnictan pefforming inspection no testing aocumenteo on tors worm PAW Higntan Energy. Rater" Thermal Concepts/ Allied - /3 Mechanical Systems Performance Testing SubmittnWo V20II0321 Wit