HomeMy WebLinkAbout3737 Landings Dr - Applications/Reroof - 02/05/2013 (2)Fort Collins
Planning, Development & Transportation
281 N. College Ave P.O. Box 580
Fort Collins, CO 80524
Phone 970-416-2740 Fax 224-6134
OVER-THE-COUNTER PERMITS ONLY
This application is.to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning
❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log
❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line ❑ Photo -voltaic
❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and
manufacturer).
Complete all applicable information on the application. Incomplete applications will not be accepted.
Application # ➢/ I -"� 005-t a Date
For ofce use only
Job Site Address (required) Value of Construction (labor, materials, profit)
J� 37 J0Ad 5 � Cs $ 1
Property Owner Name
Hsf,m -0i
all
Address City/State
'2;j7 1 5 jr C7 / I
fT /A
Zip
�J � � .
Phone
S -9
Applicant Name
Address
City/State
Zip
Phone
Contractor Lic #
Address
City/State
Zip
Phone
ben Lie r C
$/ . ,
I Da .
Contractor City of Ft. Collins Sales Tax
#
Are you paying taxes here or by report?
❑ Here ❑ Report
Sales tax number is required by all contractors
Are you paying with your trust account?
❑ Yes ❑ No
Is this a residential or commercial project? ❑ Residential ❑ Commercial
If residential, is it: ❑ Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex
Multifamily (apartment) ❑ Garage
If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail
❑ Restaurant ❑ Other (explain)
Is this building 50 years of age or more? ❑ Yes ❑ No If yes, you may need to contact Historic Preservation
If this is for a demolition permit, what year was the building constructed?
If pnor to 1975, you will need an asbestos assessment to submit with this application.
of work T
'LRl"kofN
*If lawn sprinkler/backflow preventer, must list licensed plumber. If first-time A/C, must list licensed electrician.
Subcontractors: List the company name or City of Ft Collins license #
Electrician Plumber Mechanical Roofer Other
I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to
comply with all requirements contained herein and city ordinances and to laws regulating building construction. I know that a
permit is not valid until it has been paid and issud.
Applicant: j1 l
Print Name: `� ` f 1::�Ssignature Date �� �+ 3
q
0W