Loading...
HomeMy WebLinkAbout2709 Rawahs Way - Applications/Electrical - 11/09/2012City of Flirt Collins Planning, Development & Transportation 281 N. College Ave P.O. Box 580 Fort Collins, CO 80524. Phone 970-416-2740 Fax 224-6134 OVER-THE-COUNTER PERMITS ONLY This application is to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning ❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log ❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line ❑ Photo -voltaic ❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and manufacturer). Complete all applicable information on he application. Incomplete applications will not be accepted. Application # Q l � Date 140 . For office use only Job Site Address (required) F16/4 y2 sG C) Value of Construction (labor, materials, profit) Property Owner Name . Address City/State Zip Phone ,Of , /% Lem a x>I A! 4 / n S 05 as 20 >- K3.2 - Applicant Name Address OmB City/State Zip Phone `Jc'sS �� 3a5' �iJ� ,� :Q /" F6 .2 2 b— S 5/7--7 _05' Contractor Lic # Address City/State Zip Phone 120- Contractor City of Ft. Collins Sales Tax # Are you paying taxes here or by report? 0 Here ❑ Report Sales tax number isrequiredbyall mntradois Are you paying with your trust account? ❑ Yes 1PNo Is this a residential or commercial project? Jl Residential ❑ Commercial If residential, is it: 4 Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex ❑ Multifamily (apartment) ❑ Garage If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail ❑ Restaurant ❑ Other (explain) Is this building SO years of age or more? ❑ Yes 64 No If yes, you may need to contact Historic Preservation If this is for a demolition permit, what year was the building constructed? Ifpnor to 1975, you will need an asbestos assessment to submit with this application. Description of work *If lawn sprinkler/backnow preventer, must list licensed plumber. If first-time A/C, must list licensed electrician. Subcontractors: List the company name or City of Ft Collins license # Electridan'e/4y7 Plumber Mechanical Roofer Other I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a permit is not valid until it has been paid and issued. Applicant: Q G1 Print Name: r e���f/+ Signature ci !2 �/ Date ' �V / _ /�q