Loading...
HomeMy WebLinkAbout3609 Rocky Stream Dr - Special Inspections/Engineering - 08/03/2005Footing Oualitv Assurance Observation Per the clients request, a representative of SECURE has visually observed the footing forms under construction at the site referenced below. The following summarizes our observations and opinions at the time of our visit. S CURE CONSULTING ENGINEERS Client: Site Address: 3609 Rocky S+ream Dr_ l=or^F Coll ins, Secure Job #: �,;F0S-887 Lot: 49 Block: — Filing: — Date: 0R/O2i�S Contact:.Iaonpe.n_ Subdivision: SwSt Ack&tion Foundation Plan Information Plan By: Secure D. O. 1 ••' is Ftg sizes: $ "X 12 ;, 14" 16", W ZP•,, 22", 24 j Z61 ; 28" 34) �8 36 " �—� Pad sizes : 8 k24''Ia 8"X2rn"� . R"'x28" C�.S.,x30„ v I0„x36" O,10„x�(, 0„ I D x42 jd, (0„ x 4 6 Concrete on -site? ❑ yes , 19 no, (+/= % ftg poured 4 Are the footing fob free of loose material, frost, water and or ice, roots, etc? ® yes , ❑ no Are the Footing / Pad form s es in general conformance to the above foundation plan? Dyes , ❑ no Is the footing/pad remforc^' steel in -place or on site per the above foundation plan? 0 yes, ❑ no Weather: j-M" 8 5 T Notes !n. 28 16 2020, 40 Z4 14 qt _ I12 SuAimary of Opinions Ed It is our opinion that the footing formwork is in general conformance with the foundation design referenced above. ❑ It is our opinion that the footing formwork differs significantly from the foundation design referenced above (2nd observation required). Corrective action: 5 G 7 Reinforcing Steel Ouality Assurance Observation Per the clients request, a representative of SECURE has visually observed the reinforcement within the formwork under construction at the site referenced below. The following summarizes our observations. and opinions at the time of our visit. SECUIZE CONSULTING ENGINEERS Client: RGnnen Desl'an + Cb nsj ruchon Site Address: 3(DO9 S(ea" TY Secure Job #: S Fo S -A87 Lot: 4q Block: — Filing, — Date: og/os/OS Contact: Jay Rrannen Subdivision: SwI ft Acidlfio)n Reinforcine Plan Information 1I-Orly Date: nG /1-7/OS -Job#: SIE05-1987 Reinforcing Type(s): / ❑ footing 6/ foundation wall ❑ grade beam ❑ pier cap ❑ structural slab ❑ slab -on -grade ❑ column ❑ other Wall / Grade Beam Reinforcing Steel Grade Horz. Vert./Ties l 2)A 4 bars top, (1 04 ar 60 --ox_ 24"o c- 2 (2)#4bars top, (I) t4 bar t po,nk 24"o-C• 3 GO (2.. 4 barS P� (t #4 barns 24"o.c- 4 O (z� 04 bars +oP ()B 4 bar @ �- 24"o, c- Grade b0fti4tAiR4 7- ,4- 60 CZ kt4 ars 6 d �� G r -$- 0 (l� t# bar (1 9 ar "a.c. E Go <2 tt4 bars toP (1 tt4 bar c_ Max / Min wall height observed: 10 Ft / 3 R If void forms are required, are they installed as recommended? ❑ yes , ❑ no Required thickness: in. Concrete on -site? ❑ yes 0/no (% poured Weather: Clealr,vwarM., 800E Notes: Swmary of Opinions FY It is our opinion that the reinforcing steel observed was in general conformance with the plan. ❑ It is our opinion that the reinforcing steel observed was not in general conformance with the plan. (2"a observation required). Deficiencies noted: `lam Perimeter Drain / Dampproofin2 Ouality - RE 9Assurance Observation 1 ECU Per the clients request, a representative of SECURE has visually 1 CONSULTING ENGINEERS observed the perimeter drain and/or dampproofing at the site referenced above. The following summarizes our observations and opinions at the 11 time of our visit. Secure Job #: SEMAR7 Lot: 4q Block: — Filing: —= Date: Qg1Ls/nS Contact: oPn Subdivision: Swift /�ddlftOn Project Specifications Foundation Plan By: Secure Geotechnical Report By: EEC Recommended Drain type? W Exterior perimeter ❑ Interior ❑ other Observations 'meter drain observed around: Basement ❑ Crawlspace ❑ Other: Where does the p meter drain discharge? ❑ Daylight ®" Sump pit ❑ Subdivision drain Drpproofing observed around: Basement ❑ Crawlspace ❑ All backfill areas Comments t 1 -ir t I t8" Basernerrl� yq _ 5Y; - 1 _ — — - - — — Indicates approximate drain location Summary of Opinions It is our opinion that the foundation drain and/or' dampproofing observed generally conform with the project referenced above. ❑ It is our opinion that the foundation drain and/or dampproofin IT observed differs significantly form the project specif ications (2nd observation required). Corrective Action: