HomeMy WebLinkAbout3827 Steelhead Dr - Disclosures/Air Sealing - 04/24/2006 (2)Fort Collins Residential Energy Code the building & zoning dept.',of
AIR SEALING DISCLOSURE FORM Community Planning and Environmentpl Service
rrdSC2-01- MOM 281 N. College Ave., P.O. Box 580, Fort Collins, PO 80522
(Not applicable to E-STAR or ENERGY SCORE rated homes) Voice: 970 221 6760 FAX 970 224 6134 i
Job address:
V11- - U N I i fib
General contractor. Chateau
Air sealing contractor. Collins Cashway Insulation
I .................................:::::
:::::::.:::_...........:
................ .........:..t::....nstr c...........
.......................::....:..........................: ... Complete either Part A or Part B .
Part A is to be signed by the air sealing contractor or representative of the general contractor.
Part B is to be signed by the blower door testing contractor or representative of the general contractor.
The "Blower Door Test Report" or equivalent documentation must be attached.
Please type or print, except for the signature.
If components vary, make multiple entries to describe them.
One copy of this form must be provided to the Building and Zoning Department prior to C. O.
One copy of this form must be provided to the original home buyer.
I
A.:;Prescra ttve atM AIr.::Sea11n Checklist -: :< ;` :::::::::::.:..::::.::
Me certify that the air sealing requirements specified in the current City of Fort Collins Residential Energy Code
have been completed in this building, in accordance with the "Air Sealing Checklist" published by the City of Fort Collins. A
i
Person Certifying Job: Dave Ramirez
i
Siqnature: Date:�� d!'
B.; Performance ath :.B. ;Dwelt Door: Test• :>:. >:>::;:..::::.::...•::>•.:..... ":; ;`` :: ':;:;;>::::
:.........-...p ..:..:.:.{....•.......... .....:.::..............:...:.) ::::..:.:::.:.::::::::::................................................
I/We certify that this building has met the air leakage performance threshold specified in the current Fort Collins
Residential Energy Code, in accordance with the "Blower Door Test Procedures" published by the City of Fort Collins.
Testing contractor:
Date of test:
CFM50: Air flow through the blower door at 50 Pascals pressure difference (c�m)
I
Volume: Volume of home (cu. ft.)
i
ACH50: Air change rate per hour at 50 Pascals pressure difference
ACH50 = (CFM50 x 60)1 Volume j
The performance threshold for code compliance is ACH50
not exceeding 5.0 ac/h
i
Person Certifying Job:
i
Signature: Date:
Business Firm:
Address:
Phone:
I
I