Loading...
HomeMy WebLinkAbout1315 Vinson St - Disclosures/Final Energy - 02/27/2006THERMAL ddmtk CONCEPTS oil, LENNOY P.O. Box 270066•For[ Collins, CO 80527 MASCO CONTRACTOR SERVICES M� (970)223-7090•Fax (970)223-7098 February 27, 2006 RE: Lennar Homes 2695 W. Eisenhower Blvd Suite 230 Loveland CO 80537 Project: 1315 Vinson ' Plan: N 104 Score: 85.4 The following is a list of the trade-offs used to achieve the 2005 energy code requirement. The house has a Final HERS score of 85.4 Area Value Notes House faces North Exterior walls R-15 R-15 in 2x4 Basement walls R-2.11 R-19 to rim joist space and no insulation to the exposed concrete exterior walls Floors R-30 R-30 fiberglass batt to cantilevered areas Windows 2..45 Combined R-value for all windows used. All Low E units Air infiltration .35 ACH The most allowed without fresh air ventilation. Ceiling insulation R-38 Blown Loose fill insulation for R-38 value Heating System 92% AFUE Effective AFUE Cooling System N/A Water Heater .59 EF Assuming a standard water heater naturally vented with heat traps installed Crawlspace No crawlspace Sincerely, Paul Higman Energy Rater 1/0 Summary Report General Information RatingID: 22583 Rating Type: Final Certificate: Ordered By: Lennar 1315 Vinson, Ft. Collins, CO 80525 Rater: 158 Paul Higman Date Rated: 2/24/2006 Total Area: 2824 Electric Utility = 60, Ft.Collins - Energy Gas Utility = 6, Xcel Energy Output Summary Topic Ref Hse St Code AS -IS UP 1 UP 2 UP 3 UP 4 UP 5 Rating Score - 74.6 85.4 0 0 0 0 0 Total Electricity Cost $484.0 $439.0 $436.0 Total Fuel Cost $1221.0 $1520.0 $999.0 PV Cost Benefit - - Total Electricity Use(kWh) 7612 6902 6854 0 0 0 0 0 Total Fuel Use(Therms) 1201 1495 982 0 0 0 0 0 Heating Electricity(kwh) 188 240 192 0 0 0 0 0 Cooling Electricity(kwh) 761 0 0 0 0 0 0 0 DHW Electricity(kwh) 0 0 0 0 0 0 0 0 Appliance Electricity(kwh) 6662 6662 6662 0 0 0 0 0 Heating Fuel(Therms) 831 1125 649 0 0 0 0 0 Hot Water Fuel(Therms) 370 370 332 0 0 0 0 0 Appliance Fuel(Therms) 0 0 0 0, 0 0 0 0 Electricity Savings(kWh) - - 48 Fuel Savings(Therms) - - 513 Electricity Cost Savings - - $3.0 Fuel Cost Savings - - $521.0 Total Cost Savings - - $524.0 Design Heating Load(kBtu/h) - 64.18 45.5 0 0 0 0 0 Design Cooling Load(kBtu/h) - 0 0 0 0 0 0 0 Price Of Electricity($/kWh) .064 .064 .064 .000 .000 .000 .000 .000 Price Of Fuel($/Therm) 1.017 1.017 1.017 .000 .000 .000 .000 .000 Electric Utility Service - - $46.92 Gas Utility Service - - $108.00 Total Upgrade Costs - - $2067.00 Package Present Value - - $6526.10 CO2 Reduction(tons) - - 3.02 .00 .00 .00 .00 .00 2/27/2006 Page 1 of 4