Loading...
HomeMy WebLinkAbout1648 Greenstone Trl - Correspondence/Engineering - 03/15/1998MAR-16-98 MON 06:14 PM ROBERT SMITH CONST. 970 223 5533 P.01 GENERAL BUILDING COMPONENTS INC. 224 MAIN STREET P_O. BOX 40 GIICREST CO. 60623 Telephone 1-800-427-2210 Fax1-970-737-2300 Mike Gebo City of Fort Collins Building Dept. Fort Collins, Colorado March 15, 1998 Dear Mr. Gebo, „rA�elyg It is our professional opinion that the truss system designed for the job located at 7418 Blue Water Court satisfactorily supports the the roof. The tile roof system we are using has a total "dead load" of 11.5 lb./sq. ft. (including saturated tile, felt, sheathing, and miscellaneous framing) . By a secondary calculation of the truss system we have increased this "dead load" to 15 lb./sq. ft. Lateral braces had to be added at certain stress points. All supporting hardware used corresponds to the calculated point load requirements. Furthermore, the truss system is designed to support all the necessary "over -framing" , as is common with truss roofs, with point loading no closer than six feet per chord on any given truss, and in accordance to UBC sect. 25-A 1 (allowable unit stress for Hemlock Fir) and UBC sect. 25-U-R-11 (allowable spans) . Thank you for your prompt attention to this letter. 16 Harlin Perry, President General Building Components, Inc. I�'