HomeMy WebLinkAbout2502 Ballard Ln - Special Inspections/Engineering - 05/28/2008CARROLL & LANGE,
e fe(ihc R i NU J6 11 R
3985 N Lincoln Avenue Suite 250
Loveland CO 80537
Ph 970 292 5635
Fax 970 292 5639
May 28, 2008
Daniel Ericson
J&J Construction of Northern Colorado
7251 W 2& Street, Bldg, L, Suite 200
Greeley CO 80634
RE Footing and Foundation Inspection
2502 Ballard Lane
Maple Hill Subdivision, Fort Collins CO
C&L Job No 4242
Dear Mr Ericson
As requested, I inspected the footing formwork, footing reinforcing steel and ufer ground
connection at the subject single family residence At the time of this inspection the footing
formwork and the placement of reinforcing steel were in substantial conformance with the
design drawings prepared for this structure We also observed the installation of a 20' long
piece of reinforcing steel, tied to the footing reinforcement, to be utilized as a Ufer ground
The footing inspection was performed on May 2, 2008
The foundation wall formwork and reinforcing steel were inspected on May 6, 2008 At
the time of this inspection the foundation formwork and placement of reinforcing steel were
in substantial conformance with the design drawings prepared for this structure
Please give me a call if you have any questions or if I may be of further assistance
Sincerely, '' o�pQO REGj�l
�• �O� �Av E 6p�, �p
Greg Bowdi t, PX.4yN _fR3
Engineering , NO
3
CA RROLL & LANGE=
Y f M IhCIh EAS i ADD f L
3985 N Lincoln Avenue Suite 250
Loveland CO 80537
Ph 970 292 5635
Fax 970 292 5639
May 28, 2008
Daniel Ericson
J&J Construction of Northern Colorado
7251 W 20`h Street, Bldg, L, Suite 200
Greeley CO 80634
RE Foundation Damp Proofing and Perimeter Drain Inspection
2502 Ballard Lane
Maple Hill Subdivision, Fort Collins CO
C&L Job No 4242
Dear Mr Ericson
As requested I inspected the foundation damp proofing for the subject property on
May 12, 2008 The foundation perimeter drain was also inspected on May 12, 2008
Based on these visual inspections it is my opinion that these items were installed in
substantial conformance with the design drawings prepared for this structure
Please give me a call have any questions or if I may be of further assistance
�p Rf
Sincerely, e s
Greg Bowdish cN o d -r57
Engineering MJXAk
W.
atiio�s� E�°�.d'•
d
` CARROL L & LANGE=
PPt 11 a 14 i s 'MJ k tY�P
3985 N Lincoln Avenuee Suite 250
Loveland CO 80537
Ph 970 292 5635
fax 970 292 5639
May 28, 2008
Daniel Ericson
J&J Construction of Northern Colorado
7251 W 20' Street, Bldg, L, Suite 200
Greeley CO 80634
RE Slab Reinforcement Inspection
2502 Ballard Lane
Maple Hill Subdivision, Fort Collins CO
C&L Job No 4242
Dear Mr Ericson
As requested, I inspected the reinforcing steel for the interior concrete slabs for the subject
property on May 19, 2008
Based on visual inspections it is my opinion that these reinforcing steel for the interior slabs
was installed in substantial conformance with the design drawings prepared for this
structure
Please give me a call if you have any questions or if I may be of further assistance
Sincerely,
Greg Bowdish,
Engineering M
AEGIJ�
4 `DALE B0� ��D
-4*tw a 8 /37
% a` OMAL 0_144