Loading...
HomeMy WebLinkAbout2502 Ballard Ln - Special Inspections/Engineering - 05/28/2008CARROLL & LANGE, e fe(ihc R i NU J6 11 R 3985 N Lincoln Avenue Suite 250 Loveland CO 80537 Ph 970 292 5635 Fax 970 292 5639 May 28, 2008 Daniel Ericson J&J Construction of Northern Colorado 7251 W 2& Street, Bldg, L, Suite 200 Greeley CO 80634 RE Footing and Foundation Inspection 2502 Ballard Lane Maple Hill Subdivision, Fort Collins CO C&L Job No 4242 Dear Mr Ericson As requested, I inspected the footing formwork, footing reinforcing steel and ufer ground connection at the subject single family residence At the time of this inspection the footing formwork and the placement of reinforcing steel were in substantial conformance with the design drawings prepared for this structure We also observed the installation of a 20' long piece of reinforcing steel, tied to the footing reinforcement, to be utilized as a Ufer ground The footing inspection was performed on May 2, 2008 The foundation wall formwork and reinforcing steel were inspected on May 6, 2008 At the time of this inspection the foundation formwork and placement of reinforcing steel were in substantial conformance with the design drawings prepared for this structure Please give me a call if you have any questions or if I may be of further assistance Sincerely, '' o�pQO REGj�l �• �O� �Av E 6p�, �p Greg Bowdi t, PX.4yN _fR3 Engineering , NO 3 CA RROLL & LANGE= Y f M IhCIh EAS i ADD f L 3985 N Lincoln Avenue Suite 250 Loveland CO 80537 Ph 970 292 5635 Fax 970 292 5639 May 28, 2008 Daniel Ericson J&J Construction of Northern Colorado 7251 W 20`h Street, Bldg, L, Suite 200 Greeley CO 80634 RE Foundation Damp Proofing and Perimeter Drain Inspection 2502 Ballard Lane Maple Hill Subdivision, Fort Collins CO C&L Job No 4242 Dear Mr Ericson As requested I inspected the foundation damp proofing for the subject property on May 12, 2008 The foundation perimeter drain was also inspected on May 12, 2008 Based on these visual inspections it is my opinion that these items were installed in substantial conformance with the design drawings prepared for this structure Please give me a call have any questions or if I may be of further assistance �p Rf Sincerely, e s Greg Bowdish cN o d -r57 Engineering MJXAk W. atiio�s� E�°�.d'• d ` CARROL L & LANGE= PPt 11 a 14 i s 'MJ k tY�P 3985 N Lincoln Avenuee Suite 250 Loveland CO 80537 Ph 970 292 5635 fax 970 292 5639 May 28, 2008 Daniel Ericson J&J Construction of Northern Colorado 7251 W 20' Street, Bldg, L, Suite 200 Greeley CO 80634 RE Slab Reinforcement Inspection 2502 Ballard Lane Maple Hill Subdivision, Fort Collins CO C&L Job No 4242 Dear Mr Ericson As requested, I inspected the reinforcing steel for the interior concrete slabs for the subject property on May 19, 2008 Based on visual inspections it is my opinion that these reinforcing steel for the interior slabs was installed in substantial conformance with the design drawings prepared for this structure Please give me a call if you have any questions or if I may be of further assistance Sincerely, Greg Bowdish, Engineering M AEGIJ� 4 `DALE B0� ��D -4*tw a 8 /37 % a` OMAL 0_144