Loading...
HomeMy WebLinkAbout2527 Owens Ave - Special Inspections/Engineering - 06/23/2008 (2)16f 'e- June 23, 2008 Timbers, LLC c/o Connell Resources, Inc. 7785 Highland Meadows Parkway Fort Collins, CO 80528 Attn: Mrs. Sherri Welch 1 rerracon Consulting Engineers & Scientists 301 North Howes Fort Collins, Colorado 80521 Phone 970.484.0359 Fax 970.484.0454 T� M� www.terracon.com Re: Foundation System Construction Materials Compliance Summary The Timbers — Phase 4 Housing S/E/C Zephyr and Timberline 2527 Owens Avenue — Building No. 22 - Building Permit No. B0705830 Fort Collins, Colorado Project No. 20041046 Dear Mrs. Welch: At the request of Drahota Construction, we reviewed Terracon observation reports of the foundation system for the above referenced project. Monitoring by Terracon was provided at the direction of Drahota Construction on an "as requested" basis. Terracon services generally consisted of observation of foundation footing excavations "open -hole", reinforcing steel, post - tension placement/stressing, as well as concrete testing. Our foundation observation services on the project building utilized the project specifications and the Geotechnical Engineering Report recommendations (Project No. 20025026) performed by Terracon (dated March 5, 2002). Reinforcina Steel and Post -Tension Terracon provided reinforcing steel and post -tension placement observation in structural concrete placements as requested. In addition, stress tensioning verification was provided with a copy of all reports provided to the client, general contractor and structural engineer of record for the project. The observations were performed per the provided plans and specifications for the project and have been formally reported to the client and designated parties. It is recommended that the project structural engineer review the test reports for acceptance as meeting the project design criteria. Foundation Terracon provided observation of the post -tension beam footing foundation(s) excavations as requested during construction. A summary of the observations and structural review response items were provided in written reports upon completion. Per Terracon's geotechnical report and observations performed, footing foundations have been placed in general accordance with the plans and specifications and were placed on the anticipated bearing material identified in our geotechnical report. Delivering Success for Clients and Employees Since 1965 More Than 95 Offices Nationwide Zvf z The Timbers - Phase 4 Housing Compliance Summary Project No. 20041046 Page 2 Concrete The Portland cement concrete placed was tested for field physical properties and laboratory compressive strength. The reports indicate the specified minimum compressive strength requirements for the project have been achieved. It is recommended that the project structural engineer review the test reports for acceptance as meeting the project design criteria. This report has been prepared for the exclusive use of providing test data and observations to document the foundation operations and concrete testing associated with the foundation system (post -tension) operations conducted for the proposed project. The opinions and conclusions presented have been derived in accordance with generally accepted geotechnical and material engineering practice. No other warranty expressed or implied is made. In the event that there are any changes in the nature or design of the project, the conclusions contained in this report shall not be considered valid unless this firm reviews such changes, and the conclusions of this report are modified or verified in writing. This letter is prepared for the exclusive use and reliance of our client. Use or reliance by any other party is prohibited without the written authorization of our client and Terracon. It has been our pleasure to work with you on this project and to continue providing services during your ongoing construction. Should you have any questions, or need additional information, please contact us at your convenience. Respectfully submitted, Terracon Consultants, Inc. Todd Douglas J. Jobe, P.E.A��FF �Q Project Manager Regional Manager '"Na9oNA 191110%, Enc/Copies to: (2) Addressee (1) Drahota Construction (1) City of Fort Collins Building Department c/o Drahota Construction (1) The Weintraub Organization, LTD