August 21, 2007
Project No. STOHOM-7E8E-14-735/740
3521 West Eisenhower Blvd. Loveland, Colorado 80537
Stonybrook Homes
P. O. Box 2425
Loveland, CO 80539
RE: Observation of Footings & Steel Reinforcing for Lot 4, Block 2, McClellands Creek PD
& PLD, a Subdivision of Fort Collins, Colorado. (a.k.a. 3623 Copper Spring Drive)
Gentlemen:
We observed footings and pads and the reinforcing steel placed in the footings, pads and foundation
walls at the subject site on August 16, 2007 and August 21, 2007. All observed footings and pads
and steel reinforcing met the specifications for size, type and installation as per foundation plan
prepared by Landmark Engineering Ltd, Project No. STOHOM-7E8E-14-327, dated May 21, 2007.
Rebar tie-in for grounding electrode was verified to be connected to the foundation rebar and
extended to above grade level for electricians to connect to at time of electrical rough -in.
Very truly yours,
Landmark Engineering Ltd.
/v lA
Larry M' ler
Geolo st
3 177'
The above report has been reviewed and approved by a.�Colorado P.E. No.
35177. �.
Engineers Planners Surveyors Arch
August 29, 2007
Project No. STOHOM-7E8E-14-742
Stonybrook Homes
P.O. Box 2425
Loveland, CO 80539
E"gil—iaal—i"g
Loveland 970-667-6286 Toll Free 866-379-6252
Fax 970-667-6298
www.landmarkltd.com
3521 West Eisenhower Blvd. Loveland. Colorado 80537
RE: Damp Proofing and Perimeter Drain Observation for Lot 4, Block 2, McClellands
Creek PD & PLD, a Subdivision of Fort Collins, Colorado. (a.k.a. 3623 Copper Spring
Drive)
Gentlemen:
Personnel from this office observed the applied damp proofing and perimeter drain installation and
materials on August 29, 2007. The observed damp proofing and perimeter drain system materials
and installation was found to be in general compliance with the recommendations set forth in the
foundation plan, Project No. STOHOM-7E8E-14-327, dated May 21, 2007, prepared by Landmark
Engineering Ltd.
Please contact our office if you have further questions.
Sincerely,
Landmark Engineering Ltd.
Lance Bublitz
Project Engineer