HomeMy WebLinkAbout5633 Evening Primrose Ln - Special Inspections/Engineering - 11/12/2007November 12, 2007
Westmark Homes
PO Box 271822
Fort Collins, Colorado 80527
Re: Lot 39, Fossil Lake 6th
5633 Evening Primrose k/i
Fort Collins, Colorado
Project No. 27248
Gentlemen:
Weeks & Associates, Inc.
Structural Engineers
-50"7v(p4D5
On October 22 and 26, 2007, Weeks & Associates observed the footings and foundation wall
steel at the referenced site as requested. The footing sizes and foundation wall reinforcing steel
were in substantial conformance with the foundation plan for the project. In addition, the
electrode had been placed in accordance with the recommendations by NEC.
If I can be of further assistance please contact me.
Sincerely,
Weeks &Associates, Inc
Re by:
Connie J. chneider, E.I.T.
rN ;
� ary G. W ks,;�E�,�L)i 2
Staff Engineer
tructural gi4)er
Weeks & Associates, Inc. 4700 S. College, Suite #1 Fort Collins, CO 80525 (970) 225-2422
November 2, 2007
WestMark Homes, Inc.
P.O. Box 272759
Fort Collins, Colorado 80527
Attn: Mr. Rick Myers
Re: Foundation Drain and Damp Proofing Observation
Lot 39 — Fossil Lake Ranch 6`h Filing
5633 Evening Primrose L A.1
Fort Collins, Colorado
EEC Project No. 07-01-179
Mr. Myers:
EARTH ENGINEERING
COMPANY, INC.
As requested, Earth Engineering Company, Inc. (EEC) personnel have completed the
construction observation services you requested for the referenced project. Those services
included observations of the foundation drain placement and damp proofing at the referenced
address. The results of those observations are included with this report.
On October 31, 2007, EEC personnel observed the foundation drain for the referenced project.
The foundation drain consisted of 4-inch flexible perforated pipe imbedded in 3/4 inch gravel
around the below grade exterior perimeter of the structure and was connected to a sump pit in the
basement. The gravel was covered with filter paper. The damp proofing consisted of grey spray -
on coating that appeared to be placed at the exterior below grade areas of the basement walls.
We appreciate the opportunity to be of service to you on this project. If you have any questions
regarding this report, or if we can be of further service to you in any way, please do not hesitate to
contact us.
Very truly yours,
Earth Engineering Company, Inc.
Shane M. Morris
Project Manager
RO: BOX Z71428.
FORT COLLINS, COLORADO 80527-A 428-
(970) 224- 15.2`2 (FAX) 653-0282-
Michael J. Coley, P.E.
Principal Engineer
P.0. Bois 49322.
COLORADO SPRINGS, COLORADO 80949-9322,
(7 PD) 442-68 1 3 .(FAX) 447-9535