Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4750 Pleasant Oak Dr - Special Inspections/Engineering - 12/06/2007
JIRSAHEDRICK & ASSOCIATES 1245 E. Colfax Ave. Suite 301 Denver, Colorado 80218 303-839-1963 Fax 303-839-1983 www.jirsahedrick. corn CITY OF FORT COLLINS Permit Division 281 N. College Ave. Fort Collins, CO 80524 Re: Letter of Substantial Completion Oakridge Senior Campus 4750 Pleasant Oak Drive Fort Collins, CO 80525 Permit No.: B0601491 JHA Project No. 20050403 To Whom It May Concern: Structural Engineers December 6, 2007 In accordance with Chapter 17 of the 1997 Uniform Building Code, Jirsa Hedrick & Associates, Inc., as the structural engineer of record, has made periodic structural observations of the above referenced project. Based on our periodic site visits and a review of the testing and inspection reports prepared by others, we believe, to the best of our knowledge, belief and opinion, that the building structure has been substantially completed in accordance with the approved plans, specifications and supplemental instructions. Substantial completion is the stage in the progress of the project when the building or designated portion, thereof, is sufficiently complete so the Owner can occupy or utilize the building for its intended use. Sincerely, JIRSA HEDRICK & ASSOCIATES, 12818 Steven T. Jirsa, P.E. \\10.0.1.134\word does\Projects\2005\20050403\Substantial Completion Itr.doc R6h /iv9% 771 S \�71d+ 3311 Red Tail Way Evans, CO 80620 Bus: 303-941-9272 Project Name: Oakridge Senior Campus Client Name: Terracon Inc. ' Contractor: Palace Construction Date: 3/8107 Page 1 of 1 Inspex J/N: 26149 Client J/N. 20061116 //7sv dql- .�e- Description of Work: VT of structural steel erection. Persons Notified of Results: M. Walkerfranacon, S. Brown/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was at Level 3 at lines A F, 7.6-113: Form deck screw attachments were noted as approximately 90% complete and ongoing at the time of this site visit. Screw placement was noted as being in general compliance with plan specifications in areas completed to date. Hrs. Today: t in s Ct+ 3311 Red Tail Way Evans, CO 80620 Bus: 303-941-9272 Project Namw. Oakridge Senior Campus Client Name: Terracon Inc. Contractor: Palace Construction Date: 3/14107 Page I of 1 Inspex J/N: 26149 Client J/N: 20061116 Z/7s0 Description of Work: VT of structural steel erection. Persons Notified of Results: hL WalkedTenacon; S. Brown/Palace Z?6 i�o /4/7/ Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steal was performed in Zone A at the West Stair. Stringer to slab drilled insert dons and landing frame drilled insert connections and HSS welding and deck attachments were noted as substantially complete per plan specifications in observed areas. Stringer to landing connections were noted as tack welded only to date. j ;e d+. 3311 Red Tail Way Evans, CO 80620 Bus: 303-941-9272 Project Name: Oalaidge Senior Campus Client Name: Terracon Inc. Contractor. Palace Construction Date: 3/21/07 Page 1 of 1 Inspex J/N: 26149 Client J/N: 20061116 Description of Work: VT of structural steel erection. Persons Notified of Results: M. Waliwffmracon; S. Brown/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was performed with results as noted in the following locations: Zone B, west stair and Zone F, east stair. Stair stringer and landing frame drilled insert and weld connections were noted as substantially complete per plan specifications in observed areas. Zone F, level 2, lines Q-W, 24-27: Form deck screw attachments were noted as substantially complete per plan specifications in observed areas except where deck placement was noted as incomplete to date at the intersection of Corridors #F-202 and F-205. *Ty- 3. 3.r30 0 • Date: 3/22/07 7in" s Page 1 of 1 3311 Red Tail Way Evans, CO 80620 lnspex J/N: 26149 Bus: 303-941-9272 Client J/N: 20061116 Project Name: Oakridge Senior Campus Client Name: TerraconInc. 7 Contractor. Palace Construction Description of Work VT of structural steel erection and spray -applied fireproofing. Persons Notified of Results: Nt Walkmfrerracon; S. Brown/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was performed with results as noted in the following locations: Zones B, C, and D, level 3: Visual observation of spray -applied Cafco 300 fireproofing was performed with thickness and coverages noted as being in general compliance with plan specifications in observed areas; miscellaneous areas of minor drop-off were noted. Density testing of product as applied yielded results which are in general compliance with product specifications. - Zone E, levels 1-2: Exterior wall stud panel stitch welding was noted as substantially complete per plan specifications in observed areas at exterior wall fasces. Zone F, levels 12; Zones A-D, levels 2-3: Weld porosity, lack of weld fusion, and areas of incomplete stitch welding were observed at exterior wall panel framing. Zone A, levels 1-2: Floor joist squash block screw attachments were noted as incomplete to date in many areas. Zone D, Low Roof level: Deck screw attachments were noted as substantially complete per plan specifications in observed areas except along the north edge of the area where screw placement was noted as incomplete to date. Zone E, east stair: Stair stringer and landing flame drilled insert and weld connections were noted as substantially complete per plan specifications except at the level 2-3 intermediate level landing where stingers display limited bearing at landing frame channel connections. . ins �Ind+* 3311 Red Tail Way Evans, CO 80620 _ Bus: 303-941-9272 Project Name: Oalmdge Senior Campus Client Name: Terra©oa Inc. Contractor. Palace Construction Date: 3/26/07 Page i of 1 Inspex J/N: 26149 Client J/N: 20061116 2 Description of Work: VT of structural steel erection. Persons Notified of Results: K Walkcr/Terracon; S. Brown/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural. steel was performed with results as noted in the following locations: Zone A, Level 3, lines B-r, 2-5: Form deck attachment screw placement was noted as approximately 905/9 complete and ongoing this date. Screw placement was noted as being in general compliance with plan specifications in completed areas. Zone E, south stair. Stringer and landing drilled insert and weld connections were noted as substantially complete per plan specifications in observed areas except at stringer to landing connections where gaps were noted between stringer ends and landing edge channels at several locations. linn indc 3311 Red TO Way Evans, CO 80620 Bus:303-941-9272 Project Name: Oakridge Senior Campus Client Name: Terracon Inc. Contractor: Palace Construction �i Date: 4/23/07 z7ld;�r Page 1 of 1 Inspex JIM 26149 Client J/N. 20061116 Description of Work: VT of structural steel erection - Persons Notified of Results: M. Walkerlferracon; S. Brown/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was performed with results as noted in the following locations: Level 3, Zone F, lines Q-W, 24-27: form deck attachment screw placement was noted as appraadmately 90'/o complete and ongoing; screw placement and spacing were noted as being in general compliance with plan specifications in completed areas. . Levels 1-2, Zone F, south wall: Wall stud frame stitch welding was noted as substantially complete per plan specifications in observed areas at exterior face of exterior walls. Low Roof level, Zone D, lines J-K 15-16:- Deck attachment screw placement was noted as substantially complete per plan specifications in observed areas. Levels 2-3, Zone C: Wall stud frame stitch welding was noted as substantially complete per plan specifications in observed areas at exterior face of exterior walls. Levels 1-3, Zone A, south building wing between grids B-2 and G-5: Wall stud frame stitch welding was noted as substantially complete per plan specifications in observed areas at exterior face of exterior walls. Roof level: Preliminary observations of roof deck screw attachments was performed; areas of missing screws, locations where placed screws do not engage truss top chords, and one location of a beat truss chord were observed. These conditions were reviewed with Palace Construction field personnel and with the erection foremen. 771 S \�77 +* 3311 Red Tail Way Evans, CO 80620 Bus:303-941-9272 Projeat Name: Oakridge Senior Campus Client Name: Terracon Inc, Contractor. Palace Construction Date: 5/15/07 Page 1 of 1 Inspex JIN: 26149 Client J/N. 20061116 4 (5 h) / 41q( Description of Work: VT of structural steel erection; thickness testing of spray -applied fireproofing. Persons Notified of Results: M. Walker/fenacon; S. Brown/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was performed in Zone D at the Mechanical Well area Deck screw placement was noted as substantially complete per plan specifications in observed areas except around roof hatch where screw placement was noted as incomplete to date. Thiclmess testing of Cahco 300 fireproofing was performed in Zones E and F at Levels i and 2 and in Zone A at Level 2. Coverages and thicknesses were noted as being in general compliance with plan specifications in observed areas. : 1 1 ,girl 'I''1M ad ins�Xind+o 3311 Red TO Way Evans, CO 80620 Bus: 303-941-9272 Project Name: Oakridge Senior Campus Client Name: Terracon Inc. Contractor: Palace Construction Date: 5/23/07 Page 1 of 1 Inspex J/N: 26149 Client J/N: 20061116 Description of Work: VT of stnrctmal steel erection. Persons Notified of Results: M. Walkerfrenacon; Zane/Palace 4��-S-o //"",/ e a4,d, Observations. Per the request of Palace Construction, visual observation of the erection of structural steel was performed with results as noted in the following locations: Zone D Mechanical Well flaming at Level 3-Roof level — Vertical wall studs above and below unit ceiling elevation do not align above one another. Rim track at roof level not spliced around perimeter of Mechanical Well area. Rim track has been framed to inside face of wall studs; details show floor joists flaming cantilevered across bop of wall studs at these connections. Roof truss bottom chords do not align atop wall studs in many locations. Smoke demising wall does not frame full height to Mechanical Well floor joists. Zone E, Level 3: Form deck screw placement was noted as substantially complete per plan specifications in observed areas. Zone F, lines T.5-W, 24-27: Roof truss to exterior wall frame connection welding was noted as substantially complete per plan specifications in observed areas. insp ��ind+e / 3311 Red Tail Way Evans, CO 80620 Bus: 303-941-9272 Project Name: Oakndge Senior Campus Client Name: Tee Inc. Contractor: Palace Constriction Date: 6M/07 Page 1 of 1 Inspex J/N: 26149 Client J/N: 20061116 `7 SD Description of Work VT of structural steel erection. Persons Notified of Results: M. Walker/ferracon; S. Brown/Palace /� 6 /dKeFr Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was performed at the Roof level at limes A M at grids 1-11 and 12-15. Light gauge roof truss bridging placement and truss to exterior wall connection welding were reviewed with site personnel; work on these elements was noted as ongoing this date. 46 ito ins d+ 3311 Red Tail Way Evans, CO 80620 Bus: 303-941-9272 Project Name: Oakridge Senior Campus Client Name: Terracon Inc. Contractor. Palace Construction Date: 6/29/07 Page 1 of 1 Inspex Jft 26149 Client J/N. 20061116 Description of Work: VT of structural steel erection. Persons Notified of Results: M. Walker/Terracon; S. Bmwn/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was performed with results as noted in the following locations: Level 3, line D.S, 10-11; lines A-A2, 10-11: Roof truss to CMU shear wall and stair core wall connections were noted as incomplete to date. Roof level, lines Q-T, 17-22: Deck to light gauge truss screw connections were noted as ongoing to date in this area Areas CID Roof Mechanical Well: Floor joist attachments were noted as ongoing this date; clarification for joist connections at the south perimeter of this area was requested of Z. Nelson of Palace Construction. Area C/D, line 14: Break metal roof ridge cap installation was noted as incomplete to date. Roof truss Simpson tie connections were reviewed with Z. Nelson of Palace Construction. Said connections, were noted as incomplete to date. ITTL t 'qFo /6 74 November 26, 2007 Irerracon Consulting Engineers 8 Scierrt�ts MacKenae House LLC 7887 East Belleview Ave. Ste. 800 Fat Collins. NorthHowes 8=1 80521 Englewood, Colorado 80111 6 � Phone 970.484.05 Fax Faz 970.484.0454 Attn: Mr. Jim Clay wwwterracon.com Re: Construction Materials Compliance Summary Oakridge Senior Campus — VAL 7 T Southwest Corner of Oakridge Drive and McMurray Avenue Fort Collins, Larimer County, Colorado Project No. 20061095 Dear Mr. Jim Gay. Earthwork At your request, we reviewed the earthwork materials placed and monitored during construction activities by Terracon on an `as requested" basis. Our services on the project building have included performing laboratory testing of the soils for suitability to the project specifications and the Geotechnical Engineering Report recommendations performed by Terracon (Project No. 20045169 dated June 21, 2005). Terracon also performed in -place field density testing during placement of the fill to check maximum density and moisture control. As recommended in the soils investigation, on -site or approved imported soils were suitable for placement during -construction. Lab oratory_ tests indicated, fill material tested by Temacon met the recommendations as outlined in the geotechnical report. The results of the field and laboratory testing were forwarded for review. In addition, the on -site superintendent and subcontractors were informed on a daily basis of the test results performed. Terracon performed 258 in -place moisture-density/compaction tests for the building, parking lot, curb and gutter, garage, cooling tower, sidewalk, retaining wail and road base subgrade placement and seweriinei waterline, plumbing, electrical, storm sewer and roof drain backfill. The tests at the locations indicated met or ultimately achieved (after retesting) compaction specification requirements. Observation of construction procedures and physical in -place testing of the stabilization process was provided by Terracon personnel on a part-time basis. Based upon the limited tests and observations performed, results indicate suitable materials and specified compaction at the locations tested. Our test results represent only the materials at the location and time of testing. Terracon did not direct nor control -the fill placement and compaction at the site and does not assume responsibility for the placement, compaction or control of the fill materials. Areas of fill which are not representative of our testing may exist, particularly in common fill areas such as slopes or landscaped outside of proposed construction. The foundation type and specific design for each structure will be recommended based on the particular characteristics of the soil type at foundation depth, and on the basis of further evaluations and observations prior to construction. Delivering Success for Clients and Employees Since 1965 More Than 80 Offices Nationwide Z 66 ej) M S \�T1 +* 3311 Red Tail Way Evans, CO 80620 Bus: 303-941-9272 Project Name. Oakridge Senior Campus Client Name: Teen Inc. Contractor. Palace Construction Date: 7/12/07 Page 1 of 1 lospex RN: 26149 Client J/N: 20061116 Z/� 1/�as�� O� Description of Work: VT of structural steel erection. Persons Notified of Results: M. Walkerfrerracon; S. Brown/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was performed with results as noted in the following locations: Levels 1-3, Zones E and F: Interior wall stud panel stitch welding was noted as substantially complete per plan specifications in observed areas. Roof level, Zones CID, E, and F: Deck connection screw placement was noted as substantially complete per -plan specifications in observed areas. Miscellaneous areas of minor roof buss damage were observed during this inspection. Commons Clerestory, Zone A: West wall stud pack stitch welding was noted as substantially complete per plan specifications in observed areas. C;1 o-f 4 Oakddge Senior Campus — UAL Compliance Summary Project No. 20061095 Page 2 Concrete /36-40 /-//9/ MffTM Z/7S_O Aleo'-wr-e 4 4X__ The Portland cement concrete placed and tested on -site consisted of 68 tests for physical property and compressive strength tests of floor, deck and balcony slabs, grade beams, garage footings and stem walls, sidewalks, curb and gutter, storm sewer, inlet box, balcony columns, patio footings and pool foundation wall. The reports indicate the specified minimum compressive strength requirements for the project have been achieved. It is recommended that the project structural engineer review the observation reports for acceptance as meeting the project criteria. � Reinforcing Steel and Post -Tension Terrac on provided reinforcing steel and post -tension tendon placement observation in structural concrete placements as requested. In addition, stress tensioning verification was provided with a copy of all reports submitted to the client, general contractor and structural engineer of record for the project The observations were performed per the provided plans and specifications for the project and have -been -formally reported to the client --and designated -parties.- It is - recommended that the project structural engineer review the test reports for acceptance as meeting the project design criteria. Hot Mix AsghaR (HMA) Paving Two (2) samples of HMA were obtained for bitumen content and gradation to check conformance to the submitted mix design formula during paving operations with test results within the mix design formula tolerances provided to Terracon as reference for asphalt content. The two samples were outside of the job mix tolerances for gradation (Report Nos. 20061095.0137 and 20061095.0143) and are attached for reference. In addition, 12 in -place density tests were performed to determine relative compaction by the nuclear method, and all were within the 92 - 96% requirement. A core versus nuclear correlation test was not performed and typically the core test results will result in a higher test value. Masonry Testing and Observations Five sets of grout samples, five sets of mortar samples, and five sets of masonry assemblages were obtained for compressive strength testing. Test results have met or exceeded the required the reported minimum strength specified for the project. In addition observations of construction procedures and reinforcing steels were performed on an as -requested basis. It is recommended that the project structural engineer of record review the test reports for acceptance as meeting the project criteria. Oakridge Senior Campus — IL/AL Compliance Summary Project No. 20061095 Page 3 Reinforcing Steel 4 o & /41�'/ >rerram So 1)/6WaXt� Terracon provided reinforcing steel placement observation in structural concrete placements as requested. The observations were performed per the provided plans and specifications for the project and have been formally reported to the client and designated parties. It is recommended that the project structural engineer of record review the test reports for acceptance as meeting the project criteria. Structural Steel and Fire Proofing Observation Inspex ndt. provided structural steel/weld site construction and fire proofing observations (services through 7/12107). Observation results were provided to on -site personnel at the time of the visit with a written report as documentation. The observation reports have noted observations as being acceptable per the provided plans with the exception of the attached reports dated 12115106, 1/9107, 2/23/07, 3/6/07, 3/8/07, 3114/07, 3121/07. 3122/07, 3126107, 4123/07, 5/15/07, 5123/07, 617/07, 6/29/07 and 7/12/07. It is recommended that the project structural engineer review the observation reports for acceptance as meeting the project criteria. Miscellaneous Observations Vapor emission testing was performed at frequencies selected by our client and were evaluated by the contractor per the provided construction requirements. Additionally, sound -proof insulation, fire caulking and sc rewfiastener patterns of the interior and exterior gypsum board were observed at frequencies selected by our client. All observations and/or recommendations were provided in a written report. It is recommended that the project structural engineer and/or architect review the observation reports for acceptance as meeting the project criteria. This report has been prepared for the exclusive use of providing test data and observations to document the earthwork, post -tensioned slabs, reinforcing steel, HMA paving, concrete, masonry, structural steel, and fire proofing operations conducted for the proposed project. The opinions and conclusions presented have been derived in accordance with generally accepted geotechnical and material engineering practice. No other warranty expressed or implied is made. In the event that there are any changes in the nature or design of the project, the conclusions contained in this report shall not be considered valid unless this firm reviews such changes, and the conclusions of this report are modified or verified in writing. This letter is prepared for the exclusive use and reliance of our client. Use or reliance by any other party is prohibited without the written authorization of our client and Terracon. Reliance on this letter by the client and all authorized parties will be subject to the terms, conditions and limitations stated in the proposal, report and Terracon's Terms and Conditions. yo�y Oakridge Senior Campus — UAL Compliance Summary Project No. 20061095 Page 4 The limitation of liability defined in the Terms and Conditions is the aggregate limit of Terracon's liability to the client and all relying parties. It has been our pleasure to work with you on this project and to continue providing services during your ongoing construction. Should you have any questions, or need additional information, please contact us at your convenience. 0 REG Respectfully submitted, Terracon Consultants, Inc. Todd A. Tumey Field Project Manager Douglas J. Jobe, P.E. Regional Manager Enclosures: (1) Bituminous Mbdure Test Results dated 12/19/06 (1) Inspex ndt. Structural Steel and Fire Proofing Reports dated 12115/06, 1/9/07, 2/23107, 316/07, 318107, 3/14/07, 3/21/07, 3/22/07, 3126107, 4/23107, 5115107, 5123/07, 6/7/07, 6/29/07 and 7/12/07 Copies to: Addressee (2) Palace Construction (2): Zane Nelson City of Fort Collins Building Dept. c% Palace Construction (1) Jirsa Hedrick and Associates (1): Beth Bradford Lantz Boggio Architects PC (1): Bill Speck North Star Design (1): Patricia Kroetch a Date: 12/15/06 / Page 1 of 1 nd+i 3311 Red Tail Way Evans, CO 80620 lnspex J/N: 26149 Bus: 303-941-9272 Client J/N: 20061116 ProjectName: Oakridge Senior Campus Z 7S Zl ClieatNfame: Terracon Inc. Contractor. Palace Construction Description of Work: VT of structural steel erection. Persons Notified of Results: K Walker/Terracon; S. Brown/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was performed in Zones C and D with the following conditions noted: Light gauge stud flame connection welding was noted as ongmg this date; miscellaneous areas of lack of weld fusion and stud burn -through were noted. These conditions were reviewed with the stud frame foreman to enable corrections to made prior to observation of completed areas. Structural frame erection was reviewed. A325 bolt connection tensioning, column anchor bolt connection tensioning,and Clerestory moment connection welding were noted as ongoing this data. d+6 3311 Red Tail Way Evans, CO 80620 Bus: 303-941-9272 Project Name: Oakridge Senior Campus Client Name: Terracon Inc. Contractor. Palace Construction Date: 1/9/07 1/ Page 1 of 1 Inspex Jft 26149 Client JR4: 20061116 jr6 I�/twaR / a'-k Je Description of Work: VT of structural steel erection. Persons Notified of Results: M. Walkerfrerracon; S. Brown/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was performed with results as noted in the following locations: Level 2, lines J N, 12-14; lines M N, 14-15.8: Light gauge joist hanger to beam connection welding was noted as substantially complete per plan specifications in observed areas. Deck attachment screw placement was noted as approximately 80% complete in the above noted areas. Level 1, Areas c and D: Wall stud framing was reviewed with site erection personnel. Weld overlap, porosity, stud burn -through, and insufficient weld lengths were observed in several areas. W. - ., N mi. . um & Yhorblomm S2 MO - CI ins d+. 3311 Red Tail Way Evans, CO 80620 Bus: 303-941-9272 Project Name: Oakridge Senior Campus Client Name: Terracon Inc. Contractor: Palace Construction Date: 2/23/07 Page 1 of 1 Inspex J/N: 26149 Client J/N: 20061116 Description of Work: VT of structural steel erection. Persons Notified of Results: K Walker/rerracon; S. Brown/Palace Observations: Per the request of S. Brown of Palace Construction, visual observation of the erection of structural steel was performed at Level 2 at lines B-G2, 1-5.2. Form deck screw attachments were noted as substantially complete per plan specifications in observed areas except at several perimeter areas where screw placement was noted as ongoing during this site observation visit. Today: 2,75; 30 mi. / tar9li iirorb)aason ffii2?70�; ' inn" d+. 3311 Red Tail Way Evans, CO 80620 Bus: 303-941-9272 Project Name: Oakridge Senior Campus Client Name: Terracon Inc. Cow: Palace Construction Date: 3/6/07 ^' Page 1 of 1 lnspex JIM 26149 Client 11N. 20061116 Description of Work Thickness and density besting of spray -applied fireproofing. Persons Notified of Results: K Walker/Terracon, S. BrownflNih e '03trei'i4Tr Observations: Per the request of S. Brown of Palace Construction, thickness and density testing of spray -applied Cafco 300 fireproofing was performed at Level 2 in Zones C and D at lines E-S and in Zone A at lines D-G. Thicknesses and coverages were noted as being in general compliance with plan specifications in observed areas, miscellaneous minor areas of drop-off and trade damage were noted in the observed areas. Density testing performed on product as applied yielded results in substantial compliance with product specifications.