Loading...
HomeMy WebLinkAbout1822 S College Ave - Correspondence/Health Department - 12/06/2007a ?4, . FARIMUN •am COMMITTED TO EXCELLENCE December 6, 2007 Sam Wray dba Human Bean 144 N. Mason Fort Collins, CO 80524 DEPARTMENT OF HEALTH AND ENVIRONMENT 1525 Blue Spruce Drive Fort Collins, Colorado 80524-2004 General Health (970) 498-6700 Environmental Health (970) 498-6775 Fax (970) 498-6772 Dear Mr. Wray, The plans and specifications re bmitted for the construction of Human Bean Drive-Thru Coffee to be located at 1822 S. College in Fort Collins, Colorado, have been reviewed by this department. The plans are approved at this time. The following items correspond to the October 17, 2007 letter: 1. It is acknowledged that baked goods will be obtained from Blue Point Bakery in Denver, Colorado. 2. The sick employee policy has been reviewed and acknowledged. 3. The location of the ice maker is acknowledged and will be drained into a floor sink. 7. Storage shelving acknowledged to be melamine shelving located next to the 3- compartment sink. 13. The 3-compartment sink is acknowledged to be 18"x18"x145' with 24" drain boards on both sides. 17. It is acknowledged that the hot water heater provided will be a Rheem model ES50, with a 9 KW rating and 37 gph at 100°F rise. 21. It is acknowledged that no chemical dispensing tower will be plumbed at any sink in the establishment. 30. It is acknowledged that employee personal items will be stored away from food or food service items. F 1 or- The written plans are approved at this time. Be advised approval of plans, including the above modifications and those outlined in the October 17, 2007 plan review letter, does not constitute acceptance of the completed structures. Inspections of the premises must be conducted by this department prior to approval for operation and licensure of the establishment. Failure to follow the recommended changes may prevent or delay the licensure. In addition to the $75 plan review application fee paid at the time the plans were submitted for review, a review fee is assessed for the actual review time. The review fee is assessed at a rate of $40 per hour. Currently review cost for this project is $180. Please be advised, before the department can give any approval for operation all plan review fees must be must be paid. The plan review billing invoices for this project are attached. Please feel free to contact this department if questions arise, or if I can be of further service at 498-6781. Respectfully, Jennifer Sturgeon cc: Fort Collins Building Department r Z of z