Loading...
HomeMy WebLinkAbout2621 Ashland Ln - Special Inspections/Engineering - 10/03/2007CARROLL & LANGE= P R 0 Ff S 5 1 0 N AL ENGINEERS & tANO S J R V E Y 0 R S 3985 N. Lincoln Avenue, Suite 250 Loveland, CO 80537 Ph:970-292-5635 Fax: 970-292-5639 October 3, 2007 Daniel Ericson Journey Homes 7251 W. 20th Street, Bldg, L, Suite 200 Greeley CO 80634 RE: Footing and Foundation Inspection, 2621 Ashland Lane Maple Hill Subdivision, Fort Collins CO C&L Job No. 4194 Dear Mr. Ericson: As requested, I inspected the footing formwork, footing reinforcing steel and ufer ground connection at the subject single family residence. At the time of this inspection the footing formwork, placement of reinforcing steel and ufer ground connection were in substantial conformance with the design drawings prepared for this structure. The footing inspection was performed on September 26, 2007. The foundation wall formwork and reinforcing steel were inspected on September 27, 2007. At the time of this inspection the foundation formwork and placement of reinforcing steel were in substantial conformance with the design drawings prepared for this structure. Please give me a call if Lou have any questions or if I may be of further assistance. Sincerely, a`.�`���o�P00 fl.... `�. �p�,.•OP� E. Bpi :'pc0 '.. Greg Bowdish, Engineering M 'oFFSS/ONAL °jfj0+rgstrfill u00%� T Total Engineering Service, Inc. E S 1601 37'h Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252 October 15, 2007 Mr. Dan Ericson Journey Homes 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Slab Inspection 2621 Ashland Lane Maple Hill, Ft. Collins, CO Dear Mr. Ericson: As requested, Total Engineering staff observed the placement of reinforcing steel in the foundation basement and garage slab and found it to be complete and in substantial compliance with the design drawings prepared for this structure at the date of the inspection. The foundation basement and garage slab was observed on October 9, 2007. Please give me a call if you have any questions. Sincerely, TomCope, P.E. President 06-300 T Total Engineering Service, Inc. E S 1601 37th Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252 October 4, 2007 Mr. Dan Ericson Journey Homes 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Subsurface Drainage System 2621 Ashland Lane Maple Hill, Ft. Collins, CO Dear Mr. Ericson: As requested, Total Engineering staff observed the foundation subsurface drainage pipe and sump system and found it to be complete and in substantial compliance with the design drawings prepared for this structure at the date of the observation. The foundation subsurface drainage system was observed on October 4, 2007 Please give me a call if you have any questions. :a:ea:acc ��eM"'�,�� ���lS'�''a Sincerely, �.• pR�.• s • F°'',. . �� �'��0�`A M/�'p,o. �'�.o � - r'• `/ _ � 2499 Tom Cope, .E. : '• 'L : ? President '%�r090�;���T 0��,`���.�: ��''�.Fss/ONAIE��'��`��� 06-300 T Total Engineering Service, Inc. E 5 1601 37�h Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252 October 4, 2007 Mr. Dan Ericson Journey Homes 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Damp Proofing 2621 Ashland Lane Maple Hill Subdivision, Ft Collins, Co. Dear Mr. Ericson: As requested, Total Engineering staff observed the foundation damp proofing and found it to be complete and in substantial compliance with the design drawings prepared for this structure at the date of the observation. The foundation damp proofing was observed on October 4, 2007. Please give me a call if you have any questions. ;�a:.:�.:E;,; Sincerely, `��,•�a�p,08s�@/,g�.�+,��R , �` �•��pCAA M•CpA. Q'.,+ ' " - 4995 = Tom Cope, P.E. " ', o�y�0 • , President �A'•, � �:��,��� .� � � . 06-300 ''�r�'oFFSSIONAIEN�;C`'�`