HomeMy WebLinkAbout2044 Raven View Rd - Special Inspections/Engineering - 04/12/2007/ DamPyroofing Quality M— C T L I T H O M P S O N
Assurance Observation
Formerly Secure Foundations, LLC
Per the client's request, a representative of CTL has visually observed
the perimeter drain and/or dampproofing at the site referenced above.
The following summarizes our observations and opinions at the time of
our visit.
Client: Anchor Development CO. Site Address: `f-f�i
1338 Catalpa Drive, Fort Col Ens, Co.
Job #: 3F0137r 80521 Lot: I*Z Block: — Filing: --
Date: 04/12/07 Contact: Russ Wei fo Subdivision: Ravenview Mo lf1 tot
Proiect Specifications
Foundation Plan By: CTL'Thompson
Date I l /27ZOG Job# SF01376
Geotechnical Report By: EEC
Date 04-01-247 Job# 09./30/04
Recommended Drain type? preVKJt1S(Y observect
❑ Exterior perimeter ❑ Interior
❑ other
Observations
Perimeter drain observed around: preVIOVSty
❑ Basement ❑ Crawlspace observed
❑ Other:
Where does the perimeter drain discharge?
❑ Daylight ❑ Sump pit ❑ Subdivision drain
prevtovS►y obWved
D�mpproofing observed around:
id Basement ❑ Crawlspace ❑ All backfill areas
Comments
Summary of Opinions
It is our opinion that the foundation drain mt&e
dampproofing observed generally conform with the
project referenced above.
❑ It is our opinion that the foundation drain and/or
dampproofing observed differs significantly from the
project specifications (2nd observation required).
Corrective Action:
(.�i&'w, ki�uvc. 04/►2/07
Field Repr nta ve I— Date
By
CTL I Thompson Structural Engineers Ft. Collins, LLC 1 351 Linden Street, Suite 140, Ft. Collins, CO 80524
ReinforcinLy Steel Quality Assurance Observation C T L I T H O M P S O N
Per the client's request, a representative of CTL Thompson has visually Formerly Secure Foundations, LLC
observed the reinforcement within the formwork under construction at
the site referenced below. The following summarizes our observations
and opinions at the time of our visit.
Client: Anchar Development- Co Site Address: AL4LI 2 yCW Ut pW ,21�
133 C'atalpA DrivP j Fnr (IIl63S*C0. 80521
Secure Job #: SEOi376 Lot: -t2 Block: — Filing: —
Date: 04/04/07 Contact: Russ /eI)Subdivision: Raven VjejAi MuIffint
Reinforcing Plan Information
Plan By: GTI_f1hornpson Structura1Engin r
Date: II/27/OG Job#: SF0137r,
Reinforcing Type(s):
❑ footing
❑ grade beam
❑ structural slab
❑ column
W(foundation wall
❑ pier cap
❑ slab -on -grade
❑ other
Wall / Grade Beam Reinforcing Steel
Grade
Horizontal
Vert./Ties
1
00
(2 Lf are tr per.
2
GO
(2)a4bis tupt
# o-c
3
C
4
Pier Cau / Slab Reinforcing Steel
Grade
Longitudinal
Lateral
A
B
C
D
DER Ground
FR(histalled — Location
❑ Not Observed
Max/Min wall height observed: _9/ 3 ft
If void forms are required, are they installed as
rrm omended?
yes ❑no Required thickness: G in.
Concrete on -site? ❑ yes limo (% poured = +/- )
J
Notes:•• rovv oPorrh • •i
• r fA bs&ri.. • r
• l hnriZontaiii Er r
�
t
E.
�I_
r
+
r
h
i_
k
+;
FA
Summary of Opinions
Or It is our opinion that the reinforcing steel observed
was in general conformance with the plan.
❑ It is our opinion that the reinforcing steel observed
was not in general conformance with the plan.
(2" d observation required).
Deficiencies
�ddlLXLf/f/ �.(•'LA 04 /04 /07
Fielt RepreAntai've Date
$' Q
s
R ewed By
% ,✓�
roF/At
CTL I Thompson Structural Engineers Ft. Collins, LLC 1 351 Linden Street, Suite 140, Ft. Collins, CO 80524
Perimeter Drain / Dampproofing Ouality
Assurance Observation
Per the client's request, a representative of CTL has visually observed
the perimeter drain and/or dampproofing at the site referenced above.
The following summarizes our observations and opinions at the time of
our visit.
CTLITHOMPSON
Formerly Secure Foundations, LLC
Client: &ndhor DP\Je(nPMPnt f n. Site Address:
1339 Cat-alpa j�)rj\/P Fort GntImg, CC,
Job #: S Ft51376 Lot: N 2 Block: --- Filing: --
Date: n3 /Lq /07 Contact: Pogs Welts Subdivision: Raven V i Pw MWti Lot
Project Specifications
Foundation Plan By: CST Lli ham ��r
Dated/27/0(G Job#_SF-01S76
Geotechnical Report By: EEC
Date Oq/3b/o4 Job# 04-01.2-47
Recommended Drain type?
R(Exterior perimeter ❑ Interior
❑ other
Observations
Pe imeter drain observed around:
Basement ❑ Crawlspace
❑ Other:
Where does the p rimeter drain discharge?
❑ Daylight LT Sump pit ❑ Subdivision drain
Dampproofing observed around:
❑ Basement ❑ Crawlspace ❑ All backfill areas
watts not %n place Co-, ftme of observatian
Comments
Summary of Opinions
It is our opinion that the foundation drain and/or
dampproofing observed generally conform with the
project referenced above.
❑ It is our opinion that the foundation drain and/or
dampproofing observed differs significantly from the
project specifications (2nd observation required).
Corrective Action:
—(�IfA'14, i2 l3/1q!0'7
Field Repredntarive Date
38108
CTL I Thompson Structural Engineers Ft. Collins, LLC 1 351 Linden Street, Suite 140, Ft. Collins, CO 80524
No Text
Drilled Pier Ouality Assurance Observation C T L I T xm O M P S O N
Per the client's request, a representative of CTL has visually observed the drilling
of the piers at the site referenced below. The following summarizes our
observations and opinions at the time of our visit. aot-iH 9AAAE l/ vtew i
Client: Anchor Development Co- Foundation Plan:CIL Thranrpaun Strtictura1
1338 Catalpa Drive Date: IIj27Joa Job: , F0�37G,
Fort Colllm C() 80521
Job #: SF01376 Soil Report: Earfb Encitnecringi Cowl an Inc_
Date: 03/a2/o7 Contact: Russ Wens Job #: 04-01-24T ate: ngZkjj24
Site Address:
Lot: I<t2 Block: Filing:
Subdivision: Raven View Multi LDt
Installation Contractor: A.,B,1I ais paDri_1it�,
Weather: !�- G50F
Drilled Pier Specifications
Reinforcing Steel: (3) 1e G G Y
Pier Diameter In in
Min. Pier Length: ja ft
Min. Penetration 12 �
Planned Support Stratum: 0jay3fone
Other:
Description, E=Elevation of top pier, D=Pier Diameter, L=Total Pier Length, P=Penetration, H20=Depth to Water
RMA
®
oManlfl�
I
�Mrom�
M4
Subsurface Conditions observed during drilling:
3 ft M materia i underlati✓ 6., nn1 p/rvs+
,e
Installation Methods Used o
!6 1S iq..
❑ umping ❑ Casing i° r
9 Drill & Pour ❑ Tremy
� b
. °
Summary of opinions: 9
Ld It is our opinion that the drilled piers observed were in "—+ to 1
general conformance with plans and specifications. '" o
❑ It is our opinion that the drilled piers were not in general
conformance with plans and specifications.
10
Corrective Actions: 7 4
'T . 41,50"ri
Field Representative: l.�,4hAg Ca 42rrtAi 03/24107Reviewed By:
108
CTL I Thompson Structural Engineers Ft. Collins, LLC 1 351 Linden Street, Suite 140, Ft.