Loading...
HomeMy WebLinkAbout1213 Riverside Ave - Special Inspections/Engineering - 04/26/2007Permit # Permit Date COM check Software Version 3.2.1 Envelope Compliance Certificate 2003 IECC 90702782 Report Date: 04/27/07 Data filename: X:\ARCHIT-1\Drawings\FMC\2006PR-1\FORTCO-1\PROJEC-1\Comcheck.cck Section 1: Project Information Project Title: Fresenius Medical Care - Dialysis Services of Fort Collins Designer/Contractor: C �;�� tt Owner/Agent: 1213 Riverside Avenue Fresenius Medical Care -Biomedical Thee Schneckenberg Christopher Kidd & Associates �/ Applications of Colorado N48 W16550 Lisbon Road Fort Col ins, �L 1400 E. Southern Avenue Milwaukee, WI 53051 Tempe, AZ 85282 (262) g01-0505 Lschneckenberg ® ckiddarchitects.com Section 2: General Information Location (for weather data): Fort Collins, Colorado13b Building Climate Zone: Heating Degree Days (base 65 degrees F): 6368 Cooling Degree Days (base 65 degrees F): Addition Project Type: Vertical Glazing / Wall Area Pet.: 7% Building Tvoe Medical and Clinical Care Section 3: Requirements Climate -Specific Requirements: Component Name/Description �� l� gv -re' TO j�ou F .R4°o Floor Area 2070 ES I 't tom �" ? Z►, f5r- Roof 1: Metal Roof with Thermal Blocks Exterior Wall 1: CMU >B" with Integral Insulation, Furring: Metal Window 1: Metal Frame:Double Pane with Low-E, Tinted, SHGC 0.37 Door 1: Glass, Tinted, SHGC 0.28 Door 2: Solid interior Wall 1: CMU >8" with Integral Insulation, Furring: Metal FI or 1: Slab-On-Grade:Unheated, Vertical 4 ft. 4 Gross Area Cavity nt. Proposed Budget or R-Value -Value U-Factor U-Factor Perimeter 2070 0. 25.0 0.039 0.057 2704 0.0 0.0 0.273 0.064 175 --- --- 0.290 0.570 25 0.300 0.570 42 --- __- 0.166 0.133 1644 0.0 0.0 0.253 0.133 272 --- 8.0 --' 7 0 (a) Budget U-factors are used for software baseline calculations ONLY, and acode requirements. Air eakage, Component Certification, and Vapor Retarder Requirements: in material installed in 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping accordance with the manufacturer's installation instructions. page 1 of 2 Fresenius Medical Care - Dialysis Services of Fort Collins ��, /2� Windows, doors, and skylights certified as meeting leakage requirements. .a s. Component R-values & lJ-factors labeled as certified. "d ❑47 Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R-value without compressing the insulation. ❑ Stair, elevator shaft vents, and other dampers integral to the building envelope are equipped with motorized dampers. CI 6. Cargo doors and loading dock doors are weather sealed. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (ii) installed inside an appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material. Cy'I� Building entrance doors have a vestibule and equipped with closing devices. Exceptions: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. in area. Mfg. Vapor retarder installed. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2003 IECC requirements in COMcheck Version 3.2.1 and to comply with the mandatory requirements in the Requirements Checklist. n o D Principal 125nvelope Designer -Name Signature Date g 4� -4% Fresenius Medical Care - Dialysis Services of Fort Collins Page 2 of 2