HomeMy WebLinkAbout1213 Riverside Ave - Special Inspections/Engineering - 04/26/2007Permit #
Permit Date
COM check Software Version 3.2.1
Envelope Compliance Certificate
2003 IECC 90702782
Report Date: 04/27/07
Data filename: X:\ARCHIT-1\Drawings\FMC\2006PR-1\FORTCO-1\PROJEC-1\Comcheck.cck
Section 1: Project Information
Project Title: Fresenius Medical Care - Dialysis Services of Fort Collins Designer/Contractor:
C �;�� tt Owner/Agent:
1213 Riverside Avenue Fresenius Medical Care -Biomedical Thee Schneckenberg
Christopher Kidd & Associates
�/ Applications of Colorado N48 W16550 Lisbon Road
Fort Col ins, �L 1400 E. Southern Avenue Milwaukee, WI 53051
Tempe, AZ 85282 (262) g01-0505
Lschneckenberg ® ckiddarchitects.com
Section 2: General Information
Location (for weather data):
Fort Collins, Colorado13b
Building
Climate Zone:
Heating Degree Days (base 65 degrees F):
6368
Cooling Degree Days (base 65 degrees F):
Addition
Project Type:
Vertical Glazing / Wall Area Pet.:
7%
Building Tvoe
Medical and Clinical Care
Section 3: Requirements
Climate -Specific Requirements:
Component Name/Description
�� l� gv -re' TO j�ou F
.R4°o
Floor Area
2070 ES I
't tom �" ?
Z►, f5r-
Roof 1: Metal Roof with Thermal Blocks
Exterior Wall 1: CMU >B" with Integral Insulation, Furring: Metal
Window 1: Metal Frame:Double Pane with Low-E, Tinted, SHGC
0.37
Door 1: Glass, Tinted, SHGC 0.28
Door 2: Solid
interior Wall 1: CMU >8" with Integral Insulation, Furring: Metal
FI or 1: Slab-On-Grade:Unheated, Vertical 4 ft.
4
Gross Area Cavity nt. Proposed Budget
or R-Value -Value U-Factor U-Factor
Perimeter
2070 0. 25.0 0.039 0.057
2704 0.0 0.0 0.273 0.064
175 --- --- 0.290 0.570
25 0.300 0.570
42 --- __- 0.166 0.133
1644 0.0 0.0 0.253 0.133
272 --- 8.0 --'
7
0
(a) Budget U-factors are used for software baseline calculations ONLY, and acode requirements.
Air eakage, Component Certification, and Vapor Retarder Requirements: in material installed in
1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping
accordance with the manufacturer's installation instructions. page 1 of 2
Fresenius Medical Care - Dialysis Services of Fort Collins
��, /2� Windows, doors, and skylights certified as meeting leakage requirements.
.a s. Component R-values & lJ-factors labeled as certified. "d
❑47 Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a
manner that achieves the rated R-value without compressing the insulation.
❑ Stair, elevator shaft vents, and other dampers integral to the building envelope are equipped with motorized dampers.
CI 6. Cargo doors and loading dock doors are weather sealed.
Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (ii) installed inside an appropriate air -tight
assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material.
Cy'I� Building entrance doors have a vestibule and equipped with closing devices.
Exceptions:
Building entrances with revolving doors.
Doors that open directly from a space less than 3000 sq. ft. in area.
Mfg. Vapor retarder installed.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to
meet the 2003 IECC requirements in COMcheck Version 3.2.1 and to comply with the mandatory requirements in the Requirements
Checklist. n o D
Principal 125nvelope Designer -Name Signature Date
g 4� -4%
Fresenius Medical Care - Dialysis Services of Fort Collins Page 2 of 2