Loading...
HomeMy WebLinkAbout2263 Clearfield Way - Special Inspections/Engineering - 08/29/2007Weeks & Associates, Inc. Structural Engineers August 29, 2007 Aspen Homes 3037 N. Taft Avenue Loveland, Colorado 80538 Re: Lot 9, Block 25, Maple Hill 2263 Clear field Way Fort Collins, Colorado Project No. 27170 Gentlemen: On August 7 and 9, 2007, Weeks & Associates observed the footings and foundation wall steel at the referenced site as requested. Observations indicate the footing sizes and foundation wall steel reinforcing are in substantial accordance with the foundation plan for the project. In addition, the electrode had been placed in accordance with the recommendations by NEC. If I can be of further assistance please contact me. Sincerely, Weeks & Asso fates, Inc. 4 Connie . Schneider, E.I.T. Staff Engineer Weeks & Associates, Inc. 4700 S. College, Suite #1 FortCollins, CO 80525 (970) 225-2422 0 REG/ )'R G ' c STFq�� 23012 ?P.E. Weeks & Associates, Inc. Structural Engineers August 29, 2007 Aspen Homes 3037 N. Taft Avenue Loveland, Colorado 80538 Re: Lot 9, Block 25, Maple Hill 2263 Clear field Way Fort Collins, Colorado Project No. 27170 Gentlemen: On August 17, 2007, Weeks & Associates observed the perimeter drain at the referenced site. Observations indicated a 4" diameter perforated pipe had been placed around the exterior perimeter of the basement foundation and sloped to the sump pit in the basement. The drain pipe installation is in substantial accordance with the perimeter drain recommendations for the project. In addition, the exterior of the basement foundation walls had been damproofed. If I can be of further assistance please contact me. Sincerely, Week & Associate , nc. Conni chneider, E.I.T. Staff Engineer A Weeks & Associates, Inc. 4700 S. College, Suite #1 Fort Collins, CO 80525 (970) 225-2422 0 R�jj`R 23012 P.E.