Loading...
HomeMy WebLinkAbout2463 Ashland Ln - Correspondence/Water and or Sewer - 06/22/20076/18/07 Called In 6/20/07 Requested for SANITARY SEWER SYSTEM N' 009097 Saddle Set Stub Out Used OWNER CONTACT KEVIN / J&J EXCAVATING SERVICE ADDRESS 2463 ASHLAND LN OWNER ADDRESS PHONE 539-2352 ❑ SERVICE CALL ❑ WORK ORDER REASON FOR CALL: ❑ LOCATE (If Locate is for new service line construction, read notes for inspection below) REASON FOR LOCATE: Reasonable effort has been made to accurately locate the center of Boxelder Sanitation District sewer lines in the vicinity of the service address as requested and these have been marked on ground surface with green paint. The sewer location markings represent approximate horizontal location of the sewer (accurate to within 18 inches in either direction). Depth is estimated to be Always use caution when excavating near any utility, and expose pipes so that pipes are not damaged and pipe bedding disturbance is minimized. VO.K. TO BACKFILL Date /20 yQw- BSD Initial LANEW SERVICE INSTALLATION INSPE TION NOTE: 1. Connection to sanitary sewer collection system cannot be made until System Development Charge is paid to the District; 2. District saddle set charge includes labor, equipment, and tap saddle connector to drill the collector line and fasten the saddle connector to the collector line. Permittee may NOT, under any circumstances, attempt to penetrate main collector lines or manholes without the consent of the BSD Construction Supervisor; 3. Locator wire is required for burial along the service line for future locating of the line; 4. Permittee shall provide all excavation, shoring, dewatering, service line materials and labor for installation of service line to main connection, and backfill as required by the District, Federal and State OSHA requirements, and applicable Building and Plumbing Codes. No excavation, shoring, dewatering, or backfill work will be done by the District, and the Manager or his agent will require any additional excavation, shoring, or dewatering of the excavated space that in his judgement alone is necessary befof 5. There District requiruate es that all serviection may ce tines be installed sud and chrthatlf tube use of the service line e service line nis willnot granted; contribute inflow or infiltration of groundwater to the collection system due to improper connections, grades, bedding materials or placement, or pipe material. The District will require correction of any improper connection through its enforcement authority; 6. Permittee shall notify the District at least 48 hours prior to when the service line is expected to be installed and ready for inspection and connection; 7. The District shall not be subject to any liability for any deficiency or defect of service line materials or installation which is not discovered by inspection nor shall owner or permittee be absolved from liability for any deficiency or defect of service line materials or installation and any resulting damage or from responsibility to correct such deficiency or defect. The District does not assume any obligation nor acquire any liability for personal injury to any party or damage to the connecting property or any portion thereof caused by or resulting from any such connection to the wastewater collection and treatment system; 8. The District requires payment of a $50.00 construction inspection charge for this inspection. Type of Pipe: /9ve Pipe Bedding Material j40� t 6 E- Installation Satisfactory? ✓ Elder Valve Satisfactory; ✓ Pipe Slope Adequate? Pipe Beddin7;der '� Locator Wire Property Placed? ✓ gad fll Satisfactory? Inspected by: 1 Date Sanitation District O.K. TORTIFICATE OF OCCUPANCY Date BSD Initial_ y signing, I Received by: acknowledge having read and understood the forgoing and ackn wle ge receipt of a copy of this form. Date 3201 E. Mulberry, Unit Q • P.O. Box 1518 • Fort Collins, Colorado 80522 Plinno Mm aaR_nrna . P.107M aoa_07M