Loading...
HomeMy WebLinkAbout2463 Ashland Ln - Special Inspections/Engineering - 07/09/20074ET Total Engineering Service, Inc. S 3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252 July 9, 2007 Mr. Dan Ericson J&J Construction of Northern Colorado 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Footing and Foundation Inspection 2463 Ashland Lane Maple Hill Subdivision, Ft. Collins Colorado Dear Mr. Ericson: (3c � -, I)- I As requested, Total Engineering staff observed the footing and foundation formwork and reinforcing steel and the "Ufer" electrical ground for the subject single family residential property and found them to be in substantial compliance with the design drawings prepared for this structure. The footing and "Ufer" ground were observed on June 13, 2007 and the foundation walls were observed on June 14, 2007. Please give me a call if you have any questions. Sincerely, Tom Cope, .E. President 06-299 N.DU 4,61, �r 24995 T Total Engineering Service, Inc. E S 3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252 July 9, 2007 Mr. Dan Ericson J&J Construction of Northern Colorado, LLC 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Slab Observation 2463 Ashland Lane Maple Hill, Ft. Collins, CO Dear Mr. Ericson: As requested, Total Engineering staff observed the placement of reinforcing steel in the foundation basement and garage slabs and found them to be complete and in substantial compliance with the design drawings prepared for this structure at the date of the observation. The foundation basement and garage slabs were observed on June 22, 2007. Please give me a call if you have any questions. Sincerely, Tom Cope, P. . President 06-299 iLMvt+e ;era T Total Engineering Service, Inc. E S 3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252 July 9, 2007 Dan Ericson J&J Construction of Northern Colorado LLC 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Subsurface Drainage System 2463 Ashland Lane Maple Hill, Ft. Collins, CO Dear Mr. Ericson: As requested, Total Engineering staff observed the foundation subsurface drainage pipe and sump system and found it to be complete and in substantial compliance with the design drawings prepared for this structure at the date of the observation. The foundation subsurface drainage system was observed on June 19, 2007. Please give me a call if you have any questions. Sincerely, Tom Cope, E. President 06-299 No Text