HomeMy WebLinkAbout2626 Thoreau Dr - Special Inspections/Engineering - 04/23/2007970+330+8368 Journey Homes, LLC Journey Homes, LLC 09:53:21 a.m. 06-25-2007
T Total Engineering Service, Inc.
S
3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252
April 23, 2007
Dan Eo ickwn
J & J Construction
7251 W. 20th St_, Bldg L, Ste. 200
Greeley, CO 80634
RE: Foundation Damp Proofing
2626 Thoreau hive
Maple Hill, Ft. Collins, CO
Dear Mr. Erickson:
As requested, Total Engineering staff observed the foundation damp proofing and found
it to be complete and in substantial compliance with the design drawings prepared for this
structure at the date of the inspection. The foundation damp proofing was observed on
April 23, 2007,
Please give me a call if you have any questions.
Sincerely,
��e
Tom Cope, P_E.
President
06-299
n l)I1 i�Lij%b
O�
2a995'
5 /8
970+330+8368 Journey Homes, LLC Journey Homes, LLC 09:53:00 a.m. 06-25-2007
n
i
Total Engineering Service, Inc,
L
3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252
April 25, 2007
Dan E, icson
J14cJ Construction of Northern Colorado LLC
7251 W. 20th St., Bldg L, Ste. 200
Greeley, CO 80634
RE: Foundation Subsurface Drainage System
2626 Thoreau Drive
Maple Hill, Ft. Collins, CO
Dear Mr. Ericson:
As requested, Total Engineering staff observed the foundation subsurface drainage pipe
and sump system and found it to be complete and in substantial compliance with the
design drawings prepared for this structure at the date of the observation. The foundation
subsurface drainage system was observed on April 25, 2007.
Please give me a call if you have any questions.
Sincerely,
Tom Cope, p.
President
06-299
4 95�
y�JS
4 /8
970+330+8368 Journey Homes, LLC Journey Homes, LLC 09:52:19 a.m. 06-25-2007
T Total Engineering Service, Inc.
E s
3310 State Street - Evans, CO 80620 - (970) 330-1071 • Fax (970) 330-1252
April 26, 2007
Dan Ericson
W Construction of Northern Colorado
7251 W. 20th St., Bldg L, Ste. 200
Greeley, CO 80634
RE: Footing and Foundation Inspection
2626 Thoreau Drive
Maple Hill Subdivision, Ft. Collins Colorado
Dear Mr. Ericson:
As requested, Total Engineering staff observed the footing and foundation formwork and
reinforcing steel and the "Wer" electrical ground for the subject single family residential
property and found them to be in substantial compliance with the design drawings
prepared for this structure. The footing and 'Wer" ground were observed on April 19,
2007 and the foundation walls were obsei ved un April 20, 2007.
Please give me a call if you have any questions.
Sincerely,
/v
ae
Tom Cope, E.
President
06-299
218
970+330+8368 Journey Homes, LLC Journey Homes, LLC 09:52:40 a.m. 06-25-2007
T Total Engineering Service, Inc.
E s
3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252
May 9, 2007
M. Dan Ericson
W Construction of Northern Colorado, LLC
7251 W. 20th St., Bldg L, Ste_ 200
Greeley, CO 80634
RE: Foundation Slab Observation
2626 'Thoreau Drive
Maple Bill, Ft, Collins, CO
Dear Mr, Ericson:
As requested, Total Engineering staff observed the placement of reinforcing steel in the
foundation bascmcnt and garage slab and found it to be cotuplcte and in substantial
compliance with the design drawings prepared for this structure at the date of the
observation. The foundation basement and garage slab was observed on May 1, 200T
Please give me a call if you have any questions.
Sincerely,
Tom Cope, P.E.
President
06-299