Loading...
HomeMy WebLinkAbout2656 Thoreau Dr - Special Inspections/Engineering - 05/09/2007970+330+8366 Journey Homes, LLC Journey Homes, LLC 02:05:23 p.m. 06-15-2007 4 /9 n E S Total Engineering Service, Inc. 3310 State Street • Evans, CO 80620 April 23, 2007 Dan Edesun W Construction of Northern Colorado LL.0 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Subsurface Drainage System 2656 'Thoreau hive Maple Hill, Ft. Collins, CO Dear Mr. Ericson: As requested, Total Engineering staff observed the fr and sump system and found it to be completc and in ; design drawings prepared for this structure at the dat, subsurface drainage system was observed on April 2: Please give me a call if you have any questions. Sincerely, !l�/�'1 4 Tom Cope, P.E. President 06-299 1330-1071 • Fax (970) 330-1252 undation subsurface drainage pipe substantial compliance with the of the observation. The foundation 1.2007. n rleQ,s, 970+330+8368 Journey Homes, LLC Journey Homes; LLC Total Engineering Service, Inc. � 5 3310 State Street • Evans, CO 80620 April 20, 2007 Dan Erickson J & J Construction 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Damp Proofing 2656 Thoreau Drive Maple Hill, Ft. Collins, CO Dear Mr. Erickson: As requested, Total Engineering staff observed the fc it to be complete and in substantial compliance with structure at the date of the observation, The foundati April 20, 2007. Please give me a call if you have any questions. Sincerely, / ;n 40e Tom Cope, P.E. President 06-299 02:05:44 p.m. 06-18-2007 330-1071 • Fax (970) 330-1252 dation damp proofing and found design drawings prepared for this damp proofing was observed on 5 /9