Loading...
HomeMy WebLinkAbout2627 Thoreau Dr - Special Inspections/Engineering - 04/27/2007970+330+8368 Journey Homes, LLC Journey Homes, LLC 02:20:52 p.m. 06-21-2007 T Total Engineering Service, Inc. r s 3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252 April 27, 2007 Mr. Dan Ericson Journey Homes 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Footing and Foundation Inspection 2627 Thoreau Drive Maple Hill Subdivision, Ft, Collins Colorado Dear Mr. Ericson: As requested, Total Engineering staff observed the footing and foundation formwork and reinforcing steel and the "Ufer" electrical ground for the subject single family residential property and found them to be in substantial compliance with the design drawings prepared for this structure. The footings were observed on April 17, 2007 and the foundation walls were observed on April 19, 2007. Please give me a call if you have any questions. Sincerely, Tom Cope, -E. President 06-300 71 24 995 :C . 2 /7 970+330+8366 Journey Homes, LLC Journey Homes; LLC 02:21:11 p.m. 06-21-2007 4T Total Engineering Service, Inc. f S 3310 State Street • Evans, CO 80620 • (970) 330-1071 " Fax (970) 330-1252 May 9, 2007 Dan Ericson Journey Homes 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Slab Inspection 2627 Thoreau Drive Maple Hill, Ft_ Collins, CO Dear Mr. Ericson: As requested, Total Engineering staff observed the placement of reinforcing steel in the foundation basement, split level and garage slab and found it to be complete and in substantial compliance with the design drawings prepared for this structure at the date of the observation. The foundation split level and garage slabs were observed on May 2, 2007, The foundation basement slab was observed on May 4, 2007. Please give me a call if you have any questions. Sincerely, 7ome Tom Cope, .E. President 06-300 K1tl No Text No Text