Loading...
HomeMy WebLinkAbout2233 Clearfield Way - Special Inspections/Engineering - 03/05/2007Irerracon Consulting Engineers & Scientists March 5, 2007 Aspen Homes 3037 N. Taft Avenue Loveland, Colorado 80538 Attn: Mr. Jammie Sabin Re: Foundation Footing Sizes, Wall Steel and CEE Observations Maple Hill Residential Subdivision 2233 Clearfield Way — Lot 14 Block 25 Fort Collins, Colorado Terracon Project No. 20045204 Dear Mr. Sabin: 301 North Howes Fort Collins, Colorado 80521 Phone 970.484.0359 Fax 970.484.0454 www.terracon.com A representative from Terracon observed the interior and exterior footing sizes and wall steel reinforcement, including the "concrete -encased electrode" (CEE), for the above referenced lot on February 27 and March 5, 2007, as requested. Observations made during the foundation construction indicate that the interior and exterior footing sizes, wall steel and CEE placement were in general accordance with the plans for this project. Sincerely, TERRACON Todd A.Turney ` Field Project Manager DO A. Copies: Addressee (5) David A. Rich Geotechnical Delivering Success for Clients and Employees Since 1965 More Than 80 Offices Nationwide Manager