HomeMy WebLinkAbout6349 Rookery Rd - Special Inspections/Engineering - 07/07/2006Reinforcing Steel Quality Assurance Observation SECURE Per the client's request, a representative of SECURE has visually CONSULTING ENGINEERS observed the reinforcement within the formwork under construction at the site referenced below. The following summarizes our observations 1i'':' A CTL I THOMPSON COMPANY and opinions at the time of our visit. Client: 1Sra..v .a �1.sE4 >u_< � r� Site Address: g3y9 Secure Job Lot: i2 Block: 'io Filing: Date: Contact: =g-el .: ., Subdivision: Reinforcing Plan Information Plan By: Date: o4/2-gA6 Job#: ie3A/ Reinforcing Type(s): ❑ footing ❑ grade beam ❑ structural slab ❑ column �i( foundation wall ❑ pier cap ❑ slab -on -grade ❑ other Wall / Grade Beam Reinforcing Steel Grade Horz. Vert./Ties 1 G0 21"'/-7T-ffP3db C/)"vAl 2 Z O -41 yQ 2'�q,L, 3 de (_�)rx<l.'iv. °t6Vs3'0,e, Pier Cap / Slab Reinforcing Steel Grade Longitudinal Lateral A B C D UFER Ground ❑ Installed - Location 4 Not Observed Max / Min wall height observed: /0 ' / z// If void forms are required, are they installed as recommended? /JR- ❑ yes , ❑ no Required thickness: in. Concrete on -site? ❑ yes b no (% poured = +/-0j) Weather: - un,iu-,z �S Notes: Summary of Opinions A It is our opinion that the reinforcing steel observed was in general conformance with the plan. ❑ It is our opinion that the reinforcing steel observed was not in general conformance with the plan. (2nd observation required). Deficiencies Field Representative Date' By Tsi Secure Foundations, LLC • 211 West Magnolia Street, Ft. Collins, CO 80521 0 Ph`. 970-472-6255 • Fax: 970-472-6256 No Text Teinforcing Steel Quality Assurance Observation SECURE Per the client's request, a representative of SECURE has visually CONSULTING ENGINEERS observed the reinforcement within the formwork under construction at the site referenced below. The following summarizes our observations %1';' A CTL I THOMPSON COMPANY and opinions at the time of our visit. Client: Site Address: x9,J Secure Job Lot: i2 Block: ,zd Filing: Date: c�� c,�"vG Contact: Subdivision: Fss•'�' fG �� ��M� L. s Reinforcing Plan Information Plan By: <Xu o e Date: v6/a-.3 Job#: Reinforcing Type(s): ❑ footing ❑ grade beam ❑ structural slab ❑ column ,�f foundation wall ❑ pier cap ❑ slab -on -grade ❑ other Wall / Grade Beam Reinforcing Steel Grade Horz. Vert./Ties 1 Gv 21�f/-TP1�P3vo c//)"y 2 G o y 1/Q 2 `D• L. f R/L� sa ''D, G 3 Z t2) s" g 4 Z,O Pier Can / Slab Reinforcing Steel Grade Longitudinal Lateral A B C D UFER Ground ❑ Installed - Location M Not Observed Max / Min wall height observed: to ' / / If void forms are re uired, are they installed as recommended? / ❑ yes , ❑ no Required thickness: in. Concrete on -site? ❑ yes b no (% poured = +/-p ;) Weather: Notes: Summary of Opinions 74 It is our opinion that the reinforcing steel observed was in general conformance with the plan. ❑ It is our opinion that the reinforcing steel observed was not in general conformance with the plan. (2nd observation required). Deficiencies noted: Secure Foundations, LLC • 211 West Magnolia Street, Ft. Collins, CO 80521 9 Ph`. 970-472-6255 9 Fax: 970-472-6256 No Text 5_��� tilled Pier Quality Assurance Observation SECURE �1- CONSULTING ENGINEERS ' Per the clients request, a representative of SECURE has visually observed theMIM drilling of the piers at the site referenced below. The following summarizes our observations and opinions at the time of our visit.' A CTL I THOMPSON COMPANY Client: Foundation Plan: Date: 6 - Z 3 -vG Job: Secure Job #: ,To / 3 y Soil Report: Date: C - 29 oG Contact: Job #: Zpoo 5-z— Date: a - S-� Site Address: 65-�M L. ,,, l? � . j ;r�.< (mil r5 If - Lot: / Z Block: i o Filing: Subdivision: a 1 L,l, e., . L,- Installation Contractor: A..1� Weather: S - 9� _ s w, , Drilled Pier SDecifications Reinforcing Steel: 34-t5' j '3 at 6, Pier Diameter /o " Min. Pier Length: Z 3 C* al - j, C&3 71, ram, Min. Penetration Planned Support Stratum:_ Other: m h o t e I s �� Description, E=Elevation of top pier, D=Pier Diameter, L=Total Pier Length, P=Penetration, H2O=Depth to Water Pier E D L P H2O 1 3 /'D ,�, 1 3 ' Zo' 2 15/d" Z3' /3' - 3 Yj 0' Z3 z' - 4 /o^ Z3' /31 _ 5 t c, ^ 2 3 / 3' _. 6 2 J /ON ;, / , 7 /o"- 8_ 3 10- 91 n ^ 10 T7 /c- Pier E D L P H2O I y /o" 23' 3 12 /v' 3' 1 -3 _ 13 a /o" 2}' /3' - 14 /o " Z3 / 3' 27-' 15 3 10" 23' /3' -- 16 /o^ 7- -5 17 a # to " 2 -5, — 19 20 le2 Subsurface Conditions observed during drilling: Installation Methods Used U Pumping ❑ Casing Q Drill & Pour Tremy Summary of opinions: N1._r It is our opinion that the drilled piers observed were in L general conformance with plans and specifications. y 7.-i 1-4 --9. ❑ It is our opinion that the drilled piers were not in general l i conformance with plans and specifications. Corrective Field Representative: �(,� ��P Q.„ „ Reviewed By: - , --, 0 Secure Foundations, LLC • 211 West Magnolia Street, Ft. Collins, CO 80521 0 Ph: 970-4 'Drilled Pier Ouality Assurance Observation SECURE Per the clients request, a representative of SECURE has visually observed the -CONSULTING ENGINEERS drilling of the piers at the site referenced below. The following summarizes our ow observations and opinions at the time of our visit. : A CTL I THOMPSON COMPANY Client: i u, . , o-- Foundation Plan: Date: -z-5 -"G Job: jr-o Ira Secure Job #• Date: - Z-1 —oG Contact: Sjg.✓ Site Address: 2oa kA c4 r d . Lot: /Z Block: / Filing: Subdivision:��sg: t L4Ic� Qa 1` Installation Contractor: Weather: 7S- 90 " Soil Report:�'c Job #: Z ao 5Z Date: ! z - 5-- a o Drilled Pier Specifications Reinforcing Steel: 3S j 3 G Pier Diameter ra " Min. Pier Length: 7-1; l 3Z, 2 G (N �) Min. Penetration I o ' Planned Support Stratum: mw Other: �/ < �+, , G /„� y 4-,, Description, E=Elevation of top pier, D=Pier Diameter, L=Total Pier Length, P=Penetration, H2O=Depth to Water Pier E D L P H2O 2 I /a " •2N 1 2 /o' S 3 /o Z 4 to 2 5 to ' 6 ZgIrz) _ 29t Io" �V 1; t Q' Z�7 1 -17 Subsurface Conditions observed during drilling: ra--ZV Installation Methods Used Pumping ❑ Casing qd Drill & Pour (2f Tremy Summary of opinions: It is our opinion that the drilled piers observed were in general conformance with plans and specifications. ❑ It is our opinion that the drilled piers were not in general conformance with plans and specifications. Pier E D L P H2O 11 12 13 14 15 16 17 18 19 20 Corrective Actions: �ti Z i z, B l p ! L; .I-- D.l' Field Representative: �L�„ds , Reviewed By: 381 Secure Foundations, LLC • 211 West Magnolia Street, Ft. Collins, CO 80521 • Ph: 970-4 2 Perimeter Drain / DampproofinE Quality S � Assurance Observation C Ul' LOX - U. Per the clients request, a representative of SECURE has visually CONSULTING ENGINEERS observed the perimeter drain and/or dampproofing at the site referenced above. The following summarizes our observations and opinions at the ' A CTL 1 THOMPSON COMPANY time of our visit. Client: 8,a,)n0,) g Cotes/ Nc/: Site Address: 6207 PooEr r pd.d �d•o��E Ca.�/,�l,a, F•a c.�i.�1. Ce�..�� Secure Job #: Sfo/l3y Lot: /2 Block: /D Filing: Date: 7-10 -o6 Contact: Subdivision: Fps%/ PAc Project Specifications Foundation Plan By: SPcu. Date �-2'1-06 Job# SFO�/3y Geotechnical Report By T„14.'o-, Date /2-;-Z000 Job# 2000,5236 Recommended Drain type? ZI Exterior perimeter ❑ Interior ❑ other Observations Perimeter drain observed around: - -- -- - - - ;1 Basement - -i ❑ Crawlspace - - -- ❑ Other: Where does the perimeter drain discharge? ❑ Daylight g4 Sump pit ❑ Subdivision drain Dampproofing observed around: ® Basement ❑ Crawlspace ❑ All backfill areas Comments D-a•- s oh l :-.s la I!k! c.Je-, e- ;.•ol y•�clA� ol., i��J .fkck�. Tl,� LF,�Gi�r G F% i�•8 t�1 •G r4 a.i r .S --fle �tr �C. p4-�iC)),X GLF I'/brj Re '-S,)rd,c*, l i re$. 4.,ea, , r- r. =' ,! v7 J,1 -tii6 F 113E t i E i. * E $nd�Qates apArox mat.c�raln looation Summary of Opinions w�rc co�.Plrfe A It is our opinion that the foundation drain and/or dampproofing observed generally conform with the project referenced above. ❑ .It is our opinion that the foundation drain and/or dampproofing observed differs significantly from the project specifications (2"d observation required). Corrective Action: 1. geld presentatl a ', j IW pate! iDlf Ar'VL �' % ' Secure Foundations, LLC • 2111 West Magnolia Street, Ft. Collins, CO 80521 • Ph: 970-472-6255 • Fax: 970-472-6256