Re: Foundation Footing Sizes, Wall Steel and CEE Observations
Maple Hill Residential Subdivision
2244 Forecastle Drive — Lot 5 Block 24
Fort Collins, Colorado
Terracon Project No. 20045204
Dear Mr. Sabin:
301 North Howes
Fort Collins, Colorado 80521
Phone 970.484.0359
Fax 970.484.0454
www.terracon.com
A representative from Terracon observed the interior and exterior footing sizes and wall steel
reinforcement, including the "concrete -encased electrode" (CEE), for the above referenced lot
on January 22 and 24, as requested.
Observations made during the foundation construction indicate that the interior and exterior
footing sizes, wall steel and CEE placement were in general accordance with the plans for this
project.
Sincerely,
TERRACON
Todd A. Turney
Field Project Manager
Copies: Addressee (5)
inager
Delivering Success for Clients and Employees Since 1965
More Than 80 Offices Nationwide
January 31, 2007
Aspen Homes
3037 N. Taft Avenue
Loveland, Colorado 80538
Attn: Mr. Jammie Sabin
Re: Exterior Perimeter Drain Observation
Proposed Single Family Residence
Maple Hill Subdivision
2244 Forecastle Drive — Lot 5 Block 24
Fort Collins, Colorado
Terracon Project No. 20045204
Dear Mr. Sabin:
Irerracon
Consulting Engineers S Scientists
301 North Howes
Fort Collins, Colorado 80521
Phone 970.484.0359
Fax 970.484.0454
www.terracon.com
A representative from Terracon observed the exterior perimeter drain at the above referenced
address within the Maple Hill development on January 31, 2007, as requested. At the time of our
site visits, a 4-inch diameter, perforated pipe had been placed around the exterior perimeter of the
basement/lower-level foundation and was observed to exhibit positive gravity flow toward a sump pit
located within the lower level portion of the residence. The pipe was observed to have a layer of/z -
inch washed gravel beneath it. The waterproof dampening was also observed and in our opinion
was uniformly applied to the exterior foundations.
In our opinion the portion of the exterior perimeter drainage system observed was constructed in
general accordance with the plans and specifications for the project.
Sincerely,
TERRACON
Todd A. Turney
Field Project Manager
Copies to: (5) Addressee