Loading...
HomeMy WebLinkAbout345 Circle Dr - Special Inspections/Engineering - 05/09/2006�DVANCLOD ENGINEERING, LLC STRUCTURAL DRAINAGE DRAFTING May 9, 2006 Mr. Chad Mohs HighCraft Builders 429 S. Howes Street Ft. Collins, CO 80521 RE: 345 Circle Drive, Ft. Collins, Colorado Advanced Engineering, LLC Project Number 1011-16-01B Dear Mr. Mohs: On May 3, 2006 we visually observed the as -built concrete footings and the crawl space foundation wall reinforcing placed in the forms for the 18 ft. x 18 ft. addition being constructed on the west side of the above referenced residence. It is our opinion the footing widths were in general conformance with our Foundation Plan, Project Number 1011-16-01A, dated March 28, 2006. In addition, the wall reinforcement was in general conformance with the above referenced Foundation Plan and our revised Section 1/1 sketch. The conclusions presented in this letter are not intended to cover structural items other than those listed, site grading, setbacks, or architectural features of the building. Thank you for the opportunity to serve you. If you have any questions, please feel free to call. Sincerely, Advanced Engineering, LLC �-C Jason E. Baker, P.E. �E. �. REGj�,T �33739 152 Barberry Place, Loveland, Colorado 80537 Telephone 970-278-1909 Fax 970-278-1910