HomeMy WebLinkAbout3450 Lost Lake Pl - CO/LOC/Other - 11/17/2005Citv of Fort Collins
City of Fort Collins
Temporary Certificate of Occupancy
Permit#: B0401595
This is to certify that the building, structure, or land located a 3450 LOST LAKE PL UNIT BLDG #G
Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective o 11/17/2005
and conditional upon the following requirements being completed and approved upon final inspection.
BUILDING INSPECTION Requirements to be Completed By:
11/17/2005 TC OK'D FOR TCO ON G-4 11/14/05
BUILDING INSPECTION ELECTRICAL Requirements to be Completed By: a d�
11/02/2004 FOR G-3 AND G-1 ONLY
ZONING Requirements to be Completed By: / `, d &
10/27/2005 Ok for TCO for Units 1 and 4. Prior to issuance of TCO or CO for unit 2, all site and landscape
improvements must be completed, including hard surface ashpalt/concrete on driveway between buildings
F&G.
Zoning Project Hold Requirements to be Completed By: Ci 40
10/27/2005 for units 1 and 4. Prior to issuance of TCO for unit 2, all site and landscape improvements must be
completed, including hard surface paving/concrete of the driveway between buildings F & G.
If such work is not completed within the time set forth above and approved on final inspection, or unless the time for
completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for
occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to
_a-rxta j�num e o 0 00 per day for every day of violation.
- -- -
- — -----�
. _• I 1-7wa
Contractor/Owner/Lessee Date g
Authorized By Date of Issuance
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in
the owner's name. Construction power rates may be substantially higher than the rate to which the owner
is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and
both the owner of the property and the contractor will continue to be liable to the City for all utility bills.
11/17/2005 8:47:50 AM
City of Fort Collins
Temporary Certificate of Occupancy
City of Fort Collins Permit #: B0401595
This is to certify that the building, structure, or land located a 3450 LOST LAKE PL UNIT BLDG #G
Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective o 10/28/2005
and conditional upon the following requirements being completed and approved upon final inspection.
BUILDING INSPECTION Requirements to be Completed By: -% - O S
10/28/2005 TCO FOR G-1 PER RW 10/27/05
BUILDING INSPECTION ELECTRICAL Requirements to be Completed By: / � -
is ]OX45Hl101►fi7
ZONING Requirements to be Completed By: / / - ,) —) - o S
10/27/2005 Ok for TCO for Units 1 and 4. Prior to issuance of TCO or CO for unit 2, all site and landscape
improvements must be completed, including hard surface ashpalt/concrete on driveway between buildings
F&G.
Zoning Project Hold Requirements to be Completed By: / ( -2-7 -- C)
10/27/2005 for units 1 and 4. Prior to issuance of TCO for unit 2, all site and landscape improvements must be
completed, including hard surface paving/concrete of the driveway between buildings F & G.
If such work is not completed within the time set forth above and approved on final inspection, or unless the time for
completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for
occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to
a maxlmi fyn 0.00 per day for every day of violation.
Con ractor/Owner/Lessee Date
�% /a a
Authorized ey Date df Issuafice
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in
the owner's name. Construction power rates may be substantially higher than the rate to which the owner
is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and
both the owner of the property and the contractor will continue to be liable to the City for all utility bills.
10/28/2005 12:21:53 PM
City of Fort Collins
Temporary Certificate of Occupancy
Permit #: B0401595
This is to certify that the building, structure, or land located a 3450 LOST LAKE PL UNIT BLDG #G
Fort Collins, CO has been inspected and temporary occupancy is hereby authorized, effective 11/03/2004
and conditional upon the following requirements being completed and approved upon final inspection.
BUILDING INSPECTION Requirements to be Completed By:
11/03/2004 REC'D ENGINEEF$? LETTER ON FTG/FND, PERIM DRAIN/DAMPPROOFING, FINAL ESTAR AND ALL
DISCL 40A? Tco 6" Gc44i f'
BUILDING INSPECTION ELECTRICAL Requirements to be Completed By:
11/02/2004 FOR G-3 ONLY
ZONING Requirements to be Completed By:
09/30/2004 ok for unit 3 only.
Zoning Project Hold Requirements to be Completed By:
09/30/2004 tco for unit 3 only.
If such work is not completed within the time set forth above and approved on final inspection, or unless the time for
completion is extended by the Building and Zoning Office, an order to vacate the premises, or a violation notice for
occupying the building, structure, or land without a Certificate of Occupancy will be issued. Such violation is subject to
a maximum fine of $1000.00 per day for every day of violation.
Contractor/Owner/Lessee Date
Authorized By Date of Issuance
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in
the owner's name. Construction power rates may be substantially higher than the rate to which the owner
is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and
both the owner of the property and the contractor will continue to be liable to the City for all utility bills.
11/03/2004 10:21:08 AM