RE: Foundation Slab Inspection
2462 Clarion Lane
Maple Hill, Ft. Collins, CO
TES Project No. 06-300
Dear Mr. Ericson:
As requested, Total Engineering staff inspected the placement of reinforcing steel in the
foundation basement, split level and garage slab and found it to be complete and in
substantial compliance with the design drawings prepared for this structure at the date of
the inspection. The foundation basement, split level and garage slab was inspected on
January 29, 2007.
Please give me a call if you have any questions.
Sincerely,
Greg Bowdish, P.E.
Senior Project Man,
.,,41Q�POQ RE ..... c9
pti •' Q;V E. Bp FO
�a�,�SS/ONAtENG`���•
T Total Engineering Service, Inc.
E 5
3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252
January 12, 2007
Dan Ericson
Journey Homes
7251 W. 20th St., Bldg L, Ste. 200
Greeley, CO 80634
RE: Foundation Subsurface Drainage System
2462 Clarion Lane
Maple Hill, Ft. Collins, CO
TES Project No. 06-300
Dear Mr. Ericson:
As requested, Total Engineering staff inspected the foundation subsurface drainage pipe
and sump system and found it to be complete and in substantial compliance with the
design drawings prepared for this structure at the date of the inspection. The foundation
subsurface drainage system was inspected on January 8, 2007.
Please give me a call if you have any questions.
NO �00 REG/& ,N,,
Sincerely,
'`-'' • �.�o�-rod.
Greg BowdishI P.E.
Senior Project Manager ��%_4101VA1-10,e``
4ET Total Engineering Service, Inc.
S
3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252
January 5, 2007
Dan Erickson
Journey Homes
7251 W. 20th St., Bldg L, Ste. 200
Greeley, CO 80634
RE: Foundation Dampproofing
2462 Clarion Lane
Maple Hill Subdivision, Ft Collins, Co.
TES Project No. 06-300
Dear Mr. Erickson:
As requested, Total Engineering staff inspected the foundation dampproofing and found
it to be complete and in substantial compliance with the design drawings prepared for this
structure at the date of the inspection. The foundation dampproofing was inspected on
January 4, 2007.