Loading...
HomeMy WebLinkAbout2462 Clarion Ln - Special Inspections/Engineering - 02/13/2007T 'Total Engineering Service, Inc. E S 3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252 February 12, 2007 Dan Ericson Journey Homes 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Slab Inspection 2462 Clarion Lane Maple Hill, Ft. Collins, CO TES Project No. 06-300 Dear Mr. Ericson: As requested, Total Engineering staff inspected the placement of reinforcing steel in the foundation basement, split level and garage slab and found it to be complete and in substantial compliance with the design drawings prepared for this structure at the date of the inspection. The foundation basement, split level and garage slab was inspected on January 29, 2007. Please give me a call if you have any questions. Sincerely, Greg Bowdish, P.E. Senior Project Man, .,,41Q�POQ RE ..... c9 pti •' Q;V E. Bp FO �a�,�SS/ONAtENG`���• T Total Engineering Service, Inc. E 5 3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252 January 12, 2007 Dan Ericson Journey Homes 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Subsurface Drainage System 2462 Clarion Lane Maple Hill, Ft. Collins, CO TES Project No. 06-300 Dear Mr. Ericson: As requested, Total Engineering staff inspected the foundation subsurface drainage pipe and sump system and found it to be complete and in substantial compliance with the design drawings prepared for this structure at the date of the inspection. The foundation subsurface drainage system was inspected on January 8, 2007. Please give me a call if you have any questions. NO �00 REG/& ,N,, Sincerely, '`-'' • �.�o�-rod. Greg BowdishI P.E. Senior Project Manager ��%_4101VA1-10,e`` 4ET Total Engineering Service, Inc. S 3310 State Street • Evans, CO 80620 • (970) 330-1071 • Fax (970) 330-1252 January 5, 2007 Dan Erickson Journey Homes 7251 W. 20th St., Bldg L, Ste. 200 Greeley, CO 80634 RE: Foundation Dampproofing 2462 Clarion Lane Maple Hill Subdivision, Ft Collins, Co. TES Project No. 06-300 Dear Mr. Erickson: As requested, Total Engineering staff inspected the foundation dampproofing and found it to be complete and in substantial compliance with the design drawings prepared for this structure at the date of the inspection. The foundation dampproofing was inspected on January 4, 2007. Please give me a call if you have any questions. Sincerely, Greg Bowdish, P Senior Project M y0�.60pf E_/Bp�.9�rC3 ��t`SS/ONnE E�G�`..��