HomeMy WebLinkAbout600 Buckingham St - Special Inspections/Engineering - 02/28/2007February 28, 2007
New Belgium Brewing Co
500 Linden Street
Fort Collins, CO 80524
Attn: Mr. Scott Lyon
Irerracon
Consulting Engineers & Scientists
301 North Howes
Fort Collins, Colorado 80521
Phone 970.484.0359
Fax 970.484.0454
www.terracon.com
Re: Construction Materials Compliance Summary
New Belgium Brewing Packaging Hall (Services through February 23, 2007)
500 Linden Street (yap �fcc(u'v►�jGLa�-�„.
Fort Collins, Colorado
Project No. 20061057
Dear Mr. Lyon:
Earthwork
At your request, we reviewed the earthwork materials placed and monitored during construction
activities by Terracon on an "as requested" basis. Our services on the project building have
included performing laboratory testing of the soils for suitability to the project specifications and
the Geotechnical Engineering Report recommendations performed by Terracon (Project No.
20055077; dated May 18 2005.). Terracon also performed in -place field density testing during
placement of the fill to check maximum density and moisture control with one exception; test
No. 62 of which is on the building exterior in a rock mulch/detention area.
As recommended in the soils investigation, on -site or approved imported soils were suitable for
placement during construction. Laboratory tests indicated fill material tested by Terracon met
the recommendations as outlined in the geotechnical report. The results of the field and
laboratory testing were forwarded for review. In addition, the on -site superintendent and
subcontractors were informed on a daily basis of the test results performed.
Terracon performed 183 in -place moisture-density/compaction tests for the building and parking
lot site subgrade and fill placement. The tests at the locations indicated met or ultimately
achieved (after retesting) compaction specification requirements.
Our test results represent only the materials at the location and time of testing. Terracon did
not direct nor control the fill placement and compaction at the site and does not assume
responsibility for the placement, compaction or control of the fill materials. Areas of fill which
are not representative of our testing may exist, particularly in common fill areas such as slopes
or landscaped outside of proposed construction. The foundation type and specific design for
each structure will be recommended based on the particular characteristics of the soil type at
foundation depth, and on the basis of further evaluations and observations prior to construction.
Delivering Success for Clients and Employees Since 1965
More Than 80 Offices Nationwide
New Belgium Brewing Packaging Hall 1rerraran
Compliance Summary
Project No. 20061057
Page 2
Hot Mix Asphalt (HMA) Paving
Seven (7) samples of HMA were obtained for bitumen content and gradation to check
conformance to the submitted mix design job mix formula during paving operations with test
results within the mix design job mix formula tolerances provided to Terracon as reference for
asphalt content and gradation. One sample was outside of the job mix tolerances for gradation
and asphalt content on the fine/high side (Report No. 20061057.0168). In addition, 60 in -place
density tests were performed to determine relative compaction by the nuclear method. The
density tests were within the 92 - 96% requirement. A core versus nuclear correlation test was
not performed and typically the core test results will result in a higher test value. All test results
are within typical construction tolerances for projects of similar size and scope.
Concrete
The Portland cement concrete placed and tested on -site consisted of 57 tests for physical
property and compressive strength tests of screw pile caps, floor slab, retaining wall, site work
and loading dock slab. The reports indicate the specified minimum compressive strength
requirements for the project have been achieved with the exception of set Nos. 50-57 of which
are awaiting 28-day test results. It is recommended that the project structural engineer review
the observation reports for acceptance as meeting the project criteria.
Reinforcing Steel
Terracon provided reinforcing steel placement observation in structural concrete placements as
requested. The observations were performed per the provided plans and specifications for the
project and have been formally reported to the client and designated parties. It is recommended
that the project structural engineer review the observation reports for acceptance as meeting
the project criteria.
Structural Steel & Fireproofing
Inspex ndt. provided the structural steel/weld site construction and fireproofing operations
observation. Observations were provided to on -site personnel at the time of the visit with a
written report as documentation. The observation report has noted observations as being
acceptable per the provided plans. It is recommended that the project structural engineer
review the observation reports for acceptance as meeting the project criteria.
Foundation
Terracon provided observation of the screw pile foundation(s) and open -hole excavations as
requested during construction. A summary of the observations and structural review response
items were provided in written reports upon completion. Per Terracon's geotechnical report and
observations performed, screw piles have been placed in general accordance with the plans
New Belgium Brewing Packaging Hall
Compliance Summary
Project No. 20061057
Page 3
lrerraron
and specifications and were placed on the anticipated bearing material identified in our
geotechnical report.
This report has been prepared for the exclusive use of providing test data and observations to
document the foundation installation, earthwork, HMA paving, concrete, structural steel,
fireproofing and foundation operations conducted for the proposed project. The opinions and
conclusions presented have been derived in accordance with generally accepted geotechnical
and material engineering practice. No other warranty expressed or implied is made. In the
event that there are any changes in the nature or design of the project, the conclusions
contained in this report shall not be considered valid unless this firm reviews such changes, and
the conclusions of this report are modified or verified in writing.
This letter is prepared for the exclusive use and reliance of our client. Use or reliance by any
other party is prohibited without the written authorization of our client and Terracon.
Reliance on this letter by the client and all authorized parties will be subject to the terms,
conditions and limitations stated in the proposal, report and Terracon's Terms and. Conditions.
The limitation of liability defined in the Terms and Conditions is the aggregate limit of Terracon's
liability to the client and all relying parties.
It has been our pleasure to work with you on this project and to continue providing services
during your ongoing construction. Should you have any questions, or need additional
information, please contact us at your convenience..
Respectfully submitted,
TERRACON
/ (� I' (N4_
Mike L. Walker, CET
Manager of Construction Services
Enc/Copies to: (2) Addressee
David A. Ric'
Geotechnical
A.
N
Manager
(1) Peak Engineering Inc
(1) North Star Design
(1) Swinerton Builders — on -site
(1) Ware Malcomb
(1) City of Fort Collins Building Dept. via Swinterton on -site