Loading...
HomeMy WebLinkAbout251 Cajetan St - Special Inspections/Engineering - 02/22/2006Footing Ouality Assurance Observation SECURE Per the clients request, a representative of SECURE has visually CONSULTING ENGINEERS observed the footing forms under construction at the site referenced below. The following summarizes our observations and opinions at the/) C time of our visit. 11//� A CTL I THOMPSON COMPANY Client: f; ,/^i"•-� 4A�^!s - t. Site Address: 25 e'a'e.7 Secure Job #: <? 3 Lot i5- Block:• Filing: Date: �.�92/. Contact: Subdivision: e�jIW /oe�n, ;IL b Foundation Plan Information Plan By: uKE Date: 2 oS e5d _ Job#: Sf OS Jay Fig sizes: g ,r)2 Z 20 ,, 2y Pad sizes: `O r36 e4. Jb'r 4/2 4, 0'X31;K Concrete on -site? ❑ yes , * no, (+/- % fig poured za) Are the footing forms free of loose material, frost, water and or ice, roots, etc? jyyes , ❑ no Are the Footing / Pad form sizes in general conformance to the above foundation plan? ,4 yes , ❑ no Is the footing/pad reinfo(cing steel in -place or on site per the above foundation plan? Jd yes, ❑ no Weather:�zrl/ Notes _ �1-�+,F _ nee• n j �;�. t ie /' �o . i. N Summary of O inions It is our opinion that the footing formwork is in general conformance with the foundation design referenced above. ❑ It is our opinion that the footing formwork differs significantly from the foundation design referenced above (2nd observation required). Corrective action: llx�wl ' 021a,111 c Field Representative r-,rff p0 LIr`F"-,'tea o ` 38108 Secure Foundations, LLC • 211 West Magnolia Street, Ft. Collins, CO 80521 • Ph: 970-472-6255 • Fax: 970-472-6256 Reinforcing Steel Quality Assurance Observation SECURE Per the clients request, a representative of SECURE has visually CONSULTING ENGINEERS observed the reinforcement within the formwork under construction at the site referenced below. The following summarizes our observations r A CTL I THOMPSON COMPANY and opinions at the time of our visit. Client: Site Address: _25/ Ze,e­r ,1 lrrrv.r Secure Job #: Lot: S Block: _�/ Filing: — Date: ' Contact: �..c`�-,:� �<-.crr�.,.,r! Subdivision' Reinforcing Plan Information Plan By: Date: ; z i h Job#: 9-7-1/ Reinforcing Type(s): ❑ footing ZY foundation wall ❑ grade beam ❑ pier cap ❑ structural slab ❑ slab -on -grade ❑ column ❑ other Wall / Grade Beam Reinforcing Steel Grade Horz. Vert./Ties 2 A ":. T(rL' 3 ID 4 Pier Car) / Slab Reinforcing Steel Grade Longitudinal Lateral A B C D UFER Ground .d Installed - Location WjE &4er ❑ Not Observed Max / Min wall height observed: If void forms are required, are they installed as 11 recommended? G- ❑ yes , ❑ no Required thickness: in. Concrete on -site? ❑ yes no (%I poured = +11A Weather:-r�_,`'c / r.;t �✓�i Notes: ,% Summary of Opinions JX It is our opinion that the reinforcing steel observed was in general conformance with the plan. ❑ It is our opinion that the reinforcing steel observed was not in general conformance with the plan. (2nd observation required). Deficiencies noted: Secure Foundations, LLC • 211 West Magnolia Street, Ft. Collins, CO 80521 0 Ph: 970-472-6255 0 Fax: 970-472-6256 Perimeter Drain / Dampproofine Ouality Assurance Observation Per the clients request, a representative of SECURE has visually observed the perimeter drain and/or dampproofing at the site referenced above. The following summarizes our observations and opinions at the time of our visit. SECUIX-E. CONSULTING ENGINEERS A CTL ► THOMPSON COMPANY Client: -Pa iIa8ian Harnes,Inc. Site Address: 251 Caietan Street P-1LRok 27a�Q�� Fot� ��I!�n5 �U Fort C Itlns,CO Secure Job #: S FOoq�4 Lot: _ Block: —4_ Filing: Date: 03/29/06 Contact: GardnPr Subdivision: C)1cJTou,n North Proiect Specifications Foundation Plan By: SP6t)re Date I2/05/()'=i Job# SF05-q;4 Geotechnical Report By:Termcon Date 12/19 /OG Job# 20Qp5251 Recommended Drain type? ❑ Exterior perimeter E(Interior ❑ other Observations Pef 'meter drain observed around: f� Basement ❑ Crawlspace ❑ Other: Where does the pf rimeter drain discharge? ❑ Daylight 16 Sump pit ❑ Subdivision drain Dgmpproofing observed around: WBasement ❑ Crawlspace ❑ All backfill areas Comments Garage i_ _ W.P3., E t AVlb'' �� ; A . l - — _ - — — - Indicates approximate_dialn Location _ Summary of Opinions It is our opinion that the foundation drain and/or dampproofing observed generally conform with the project referenced above. ❑ It is our opinion that the foundation drain and/or dampproofing observed differs significantly form the project specifications (2nd observation required). Corrective Action: By �o L„ 38108 Secure Foundations, LLC • 211 West Magnolia Street, Ft. Collins, CO 80521 • Ph: 970-472-6255 0 Fax: 970-472-6256