Loading...
HomeMy WebLinkAbout2774 Canby Way - Correspondence - 05/23/2001Excavation/Pier Inspection CLIENT: Ryland Homes ann0 E Maplewood Avenue, Ste 120 Greenwnnd Village, CO 90111 Recommended Foundation System CTL/THOM�P+SO JOB NO. FC- 03 DATED y n� 6 i 2 000 ❑ DRILLED FRICTION PIERS MAXIMUM END PRESSURE FOR PIERS = SKIN FRICTION OF MINIMUM DEAD -LOAD PRESSURE OF _ PROVIDE A INCH VOID BENEATH GRADE BEAMS. MINIMUM LENGTH _ _ FEET DRILLEDMAXIMUM INTO PRESSURE FOR PIERS= �S U� V PSF. SKIN FRICTION OF 2.1500 PSF. MINIMUM DEAD -LOAD PRESSURE OF 2.01000 PSF. PROVIDE A 6 INCH VOID BENEATH GRADE BEAMS. BEDROCK PENETRATION 7 j � FEET MINIMUM LENGTH�� �_ 1).6 t,lt FEET Foundation Plan BY J-S PLAN NO. I,S PIER DIAMETER I Z INCHES WALL PIER PENETRATION �► _FEET COLUMN PIER PENETRATION FEET CTL/THOMPSON, INC. CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS ADDRESS: 241., LOT -7 L __ ,BLOCK FILING NO. JOB NO._6'IJ' �I_T Foundation Layout Reinforcement r (y r 3 NO. �� GRADE P R O�} BARSN�� bV Conditions Obserye DRILLING COMPANY SOILSEXCAVATION: ` i _ PIER NO. SOILS IN PIERS: �CA i IN OVERBURDEN -` IN BEDROCK DEPTH TO GROUNDWATER Ground Water Conditions I NONE IN EXCAVATION ❑ NONE ENCOUNTERED IN BORING NO. TO [� ENCOUNTERED AT FEET IN BORING NO. ❑ PIER INSTALLATION NOT APPROVED �11, FIELD REPRESENTATIV CASED DEPTH LOWER LEVEL UPPER LEVEL FT. FT. &2- FT. FT. FT. „ FT. FT, FT. Instructions To Contractor PIERS OBSERVED WERE SUPPORTED BY MATERIALS SUIT RECOMMENDED DESIGN CRITERIA �Q RF(;� �p ... Sr" O Do 2= r: F REVIEWED BY, SS/....•�N� O•.f+JAI. <_