HomeMy WebLinkAbout921 Glenloch Dr - Correspondence - 09/28/2001ON
THE ENNTIRAUB
FOUNDATION COMPLIANCE FORM
BUILDING PERMIT# (By Builder)
CONSTRUCTION SITE ADDRESS: q Z / 6rL&/q LOC{4 DRI �/E
Subdivision: \k JA T�G-L J
Lot: 17 z Block: --
BUILDER'S NAME AND PHONE:
Richmond American Homes
Northern Division
3561 Stagecoach Road, Suite 200
Longmont, Colorado 80504
(303) 684-2956
I/We hereby state that the foundation system for the above referenced project was constructed in
general conformance with the foundation plans and specifications designed for this project and
the site where it is constructed.
Date: Initials:
R. Schoenfeld, P
Inspection:
FOOTING TRENCH
CONCRETE -ENCASED ELECTRODE PLACEMENT
TENDON PLACEMENT
CONCRETE PLACEMENT
TENDON STRESSING
POST TENSION FINAL
1111117I/181",
SCHoe,,,�.
V23702
•
1o1QQ,=
6000 EAST EVANS AVENUE ■ BUILDING 2, SUITE 100 ■ DENVER, COLORADO 80222 ■ ( 3 0 3 ) 5 0 4 - 9 3 3 0 0 FAX: (303) 504-9620