Loading...
HomeMy WebLinkAbout1020 Rolland Moore Dr - Special Inspections/Engineering - 11/06/1998Nov 09 98 09:06a Thomas Hartmann 1(970)229-0080 P. I November 6, 1998 RE: WIND TRAIL APAItTMLNTS via fax 226-3723 Joint McCoy Prudential Prime Properties 3665 J.F.K. Parkway Building 1 Fort Collins, CO 80525 TWH e o e VW &i nto8Gt1000'tlQillCq John, at your request, 1 reviewed a field condition for the roof framing at a set of upper units. The roof truss was intended to bear at a location where a pantry is framed, and a flue extends up through the roof. A sketch of this location, and revised framing details are included for field installation. As we discussed in the field, there are a number of possible alternate framing conditions that can be considered, as described in the attached details. The framers can build the most practical and expedient approach. Please forward a copy of this to the field for use and for documentation for the Building Department with the plan sets if required. Please call if you have any questions. Best Regards, p _ 4 j Thomas W. Hartmann cc:97029L06.118 enc., details far tvpait TwHartmann, Ins • 107 Cameron, Suite 2 • Fort Collins, CO 90525 • (970) 229-0031 fax (970) 229-0080 -A. Nov 03 98 09:06a Thomas Hartmann 1(970)223-0080 p.3 � ov 08 88 08;0Ga Thomas Hartmann 1\5701225`0088 p,2 -44 :Sequence Sheet sheet of at' Pf, "I hv Date Check by.