Loading...
HomeMy WebLinkAbout227 Jefferson St - Correspondence/Reroof - 11/03/1988I nient Services City of Fort Collins November 3, 1988 Mrs. Marjorie Strouse 750 Country Club Rd. Fort Collins, CO 80524 Dear Marjorie: X - --- �� p APPROVED ONLY AS \ IT COMPLIES WITH THE ,�i \ 0� NOV 3 -1988 t/ 1 CITY OF FORT COLLINS ZONING OyO 89ILOING CO[ As you are aware, the Landmark Preservation Commission has given authorization to the shed roof currently in place over the rear entrance at !227 Jefferson. With this authorization, you should be able to pay the applicable fees, obtain a permit, and come into compliance with local building codes. The Commission also approved your request to install curb stops as necessary along the east and west property lines of the back parking area for 221-227 Jefferson Street. The Commission also approved your request to patch and re -stucco the rear elevation of the buildings at 221-227 Jefferson Street. This approval was subject to the following conditions: 1. The existing brick chimney, stone window lintels, and star tie rod ends shall not be covered over by the stucco treatment. 2. The plywood window covers shall be painted to match the color of the stucco. 3. The first story windows that have been filled in by cinder blocks shall be covered with stucco to match the rest of the rear facade. 4. The fire escape shall be treated with a rust -inhibitive paint in a gray tone. If you have any questions on this matter, please call me at 221-6756. Thank you for your cooperation, and good luck with the work on the building. Sincerel /ari Van er Senior City Planner �cc: Building Inspection _ �� a :� ,� 300 LiPorte A%enuc • P.C.I. Box 580 • F:Vrt Collins, CO 80522-0580 • (303) 221-6750