Loading...
HomeMy WebLinkAbout1841 Indian Hills Cir - Disclosures/Air Sealing - 06/28/1997Fort Collins residential energy code 7196 Air sealing disclosure form Job address: General contractor: Air sealing contractor: A* Prescriptive path [Me certify that the air sealing requirements specified in the current City of Fort Collins Residential Energy Code have been completed in this building, in accordance with the "Air Sealing Checklist' published by the City of Fort Collins. pow 13Tr- Certified by: �., Phone: q87 -/7 it Business firm:,6,Paatee: J6-a8 7 Address: P- o &"e g30 Signature: F+- C.1f,�j C0 ff B♦ Performance path Me certify that this building has met the air leakage performance threshold specified in the current City of Fort Collins Residential Energy Code, in accordance with the "Blower Door Test Procedures," published by the City of Fort Collins. Testing contractor: Date of test: CFM5O: Volume: Air flow through the blower door at 50 Pascals pressure difference (cfm) Volume of home (cu. ft.) ACH50: Air change rate per hour at 50 Pascals pressure difference ACH50 = (CFM50 x 60) / Volume The performance threshold for code compliance is ACH50 not exceeding 5.0 ac/h Certified by: Phone: Business firm: Date: Address: Signature: Instructions Complete either Part A or Part B. PartA is to be signed by the air sealing contractor or representative of the general contractor. Part B is to be signed by the blower door testing contractor or representative of the general contractor. The "Blower Door Test Reporr' or equivalent documentation must be attached. Please type or print, except for the signature. If components vary, make multiple entries to describe them. One copy of this form shall be provided to the Building and Zoning Department at final inspection. One copy of this form shall be provided to the homebuyer. es6zc.vbirs523-fl 4M