Loading...
HomeMy WebLinkAbout844 Napa Valley Dr - Miscellaneous - 01/04/2001Building and Zoning Department 281 N. College Ave. Fort Collins, CO 80524 970/221-6760 INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION HIRED BY f&W&ee-,Cr_ PHONE( 910) ZZ3-/8OZ INSPECTOR .e dAl CQRMC # 'e4 - ;r7 ADDRESS OF INSPECTI N &VY oe�► 4P,4VALLEy ' I 805Z4. BUILDERICONTR C.40X-r' A10'*?z_eS PHONE L 9;"-0ZZ 3 - / 8 ZZ CITY �r _ GGc.un/S ST ADDRESS c9oX Z�Z/yv CITY STATE e-6 71P 11 Codes: Pass = ✓ Fail = O Not aaDlicable =NA INSPECTION #1 F FOUNDATION space 3b�aelment�Sr/5PLNDldef�G� _slab on grade f�` TY F SYSTEM BEING INSTALLED Passive sub -membrane system _Active sub -membrane system Passive system - sub slabm _Active system - sub slab _combined radon system ENTS - sub slab/ basement :7/4in'chesaggregate or perforated pipe or collection mat diffusion retarder (not required ere sealing has occurred) fitting ?perforatedvent pipes (min. 10 ft.) INSPECTIONS #2 and #3 SYSTEM APPROVED: YES NO _Al _ QQ Commentiz C07ONENTS S ling of openings, penetrations, omtsDATE perforated floor vent pipe �L_4 PVC radon vent pipe _diffusion retarder membrane embrane sealed to wall & fixtures VC pipe sealed at all penetrations connections ewall sleeves installed /Xivrstelabeled inside and outside ystem accessible for repair or �S' / installation of fan iectrical connections for fan termination of system meets /16andard corrosion resistant screen at end of discharge pipe ('% to''/z openings) fan properly installed outside living ��space rJ1N Manometer or other US EPA I approved monitoring device installed A Make-up air vents ` CERTIFICATION: 1, the undersigned Inspector, certify that to the best of my Knowledge anal professiona► aoiiity, i have inspected the above -described radon mitigation system and have found it to be installed in accordance with the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or omissions of the building contractor, owner, or other persons in connection with the installation, operation, or maintenance of such radon mitigation system. SIGNATURE OF INSPECTOR DATE White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources �,4L44A_J-(nv