HomeMy WebLinkAbout844 Napa Valley Dr - Miscellaneous - 01/04/2001Building and Zoning Department
281 N. College Ave.
Fort Collins, CO 80524
970/221-6760
INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION
HIRED BY f&W&ee-,Cr_ PHONE( 910) ZZ3-/8OZ
INSPECTOR .e dAl CQRMC # 'e4 - ;r7
ADDRESS OF INSPECTI N &VY oe�► 4P,4VALLEy ' I 805Z4.
BUILDERICONTR C.40X-r' A10'*?z_eS PHONE L 9;"-0ZZ 3 - / 8 ZZ
CITY �r _ GGc.un/S ST
ADDRESS c9oX Z�Z/yv
CITY STATE e-6 71P
11
Codes: Pass = ✓ Fail = O Not aaDlicable =NA
INSPECTION #1
F FOUNDATION
space
3b�aelment�Sr/5PLNDldef�G�
_slab on grade f�`
TY F SYSTEM BEING INSTALLED
Passive sub -membrane system
_Active sub -membrane system
Passive system - sub slabm
_Active system - sub slab
_combined radon system
ENTS - sub slab/ basement
:7/4in'chesaggregate or perforated
pipe or collection mat
diffusion retarder (not required
ere sealing has occurred)
fitting
?perforatedvent pipes (min. 10 ft.)
INSPECTIONS #2 and #3
SYSTEM APPROVED: YES
NO
_Al _ QQ
Commentiz
C07ONENTS
S ling of openings, penetrations,
omtsDATE
perforated floor vent pipe
�L_4 PVC radon vent pipe
_diffusion retarder membrane
embrane sealed to wall & fixtures
VC pipe sealed at all penetrations
connections
ewall sleeves installed
/Xivrstelabeled inside and outside
ystem accessible for repair or
�S'
/ installation of fan
iectrical connections for fan
termination of system meets
/16andard
corrosion resistant screen at end of
discharge pipe ('% to''/z openings)
fan properly installed outside living
��space
rJ1N Manometer or other US EPA
I approved monitoring device installed
A Make-up air vents
`
CERTIFICATION: 1, the undersigned Inspector, certify that to the best of my Knowledge anal professiona► aoiiity, i
have inspected the above -described radon mitigation system and have found it to be installed in accordance with
the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise
specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or
omissions of the building contractor, owner, or other persons in connection with the installation, operation, or
maintenance of such radon mitigation system.
SIGNATURE OF INSPECTOR DATE
White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources
�,4L44A_J-(nv