HomeMy WebLinkAbout3815 Bonneymoore Dr - Disclosures/Final Energy - 11/07/2000FAI
ort Collins Residential Energy Code the building & zoning dept. of
R SEALING DISCLOSURE FORM Community Planning and Environmental Service
"`d"3i0t-MaW 281 N. College Ave., P.O. Box 580, Fort Collins, CO 80522
(Not applicable to E-STAR or ENERGY SCORE rated homes) Voice: 970 2216760 FAX: 970 224 6134
Job address:
General contractor:
C:: >2G/,r S
Air sealing contractor:
�j 2�c s
7j of {o
,
G G
Instructions a: ..
Complete -either Part -A or -Part -a-.
Part A is to be signed by the air sealing contractor or representative of the general contractor.
Part B is to be signed by the blower door testing contractor or representative of the general contractor.
The "Blower Door Test Report' or equivalent documentation must be attached.
Please type or print, except for the signature.
If components vary, make multiple entries to describe them.
One copy of this form must be provided to the Building and Zoning Department prior to C. O.
One copy of this form must be provided to the original home buyer.
........................ .
A Prescriptive path (Air Sealing Checklist)
INVe certify that the air sealing requirements specified in the current City of Fort Collins Residential Energy Code
have been completed in this building, in accordance with the "Air Sealing Checklist' published by the City of Fort Collins.
Person Certifying Job: —� p Z_
Date: //, D 7 /) D
Business Firm: p,"e�- s 7_-�o e1,0 /Xi e,,,4 L Z c_
Address: �� ' u 5 . 19!�-Cly� N ✓d LIE . c
Phone: 17n—zee6
B Performance path (Blower Door Test)
1NVe certify that this building has met the air leakage performance threshold specified in the current Fort Collins
Residential Energy Code, in accordance with the 'Blower Door Test Procedures" published by the City of Fort Collins.
Testing contractor:
Date of test:
CFM50:
Volume:
ACH50:
Person Certifying Job:
Air flow through the blower door at 50 Pascals pressure difference (cfm)
Volume of home (cu. ft.)
Air change rate per hour at 50 Pascals pressure difference
ACH50 = (CFM50 x 60) / Volume
The performance threshold for code compliance is ACH50
not exceeding 5.0 ac/h
Signature: Date:
Business Firm:
Aadress
Phone: