Loading...
HomeMy WebLinkAbout1917 Pawnee Dr - Correspondence - 10/11/2000October 11, 2000 Project No: 1788-02-00 Mr. Trent Schermerhorn Associates in Building & Design, Ltd. 4803 Innovation Drive, Suite 1 Fort Collins, Colorado 80525 Re: Lot 161, Less North 2 Feet, Indian Hills 8th Filing 1917 Pawnee Drive; Fort Collins, Colorado Dear Mr. Schermerhorn, Shear Engineering Corporation had previously provided header recommendations for the proposed basement windows being provided at the above referenced address. The recommendations and details were provided in a letter dated June 19, 2000. The initial letter and exhibit is attached here for immediate reference. The letter indicated the header requirement to be a single (1) 6" x 6" x 3/8" steel angle lintel at each of the three (3) window locations. For reasons unknown, a quadruple (4) 2x6 header was installed at each window opening and the steel angle was disregarded. Shear Engineering Corporation analyzed the 2x6 headers and found them to be inadequate for the peak anticipated loading conditions from above. Shear Engineering Corporation recommended attaching the originally designed steel angle lintel to the inside of the 2x6 header. The steel angle shall be bolted to the existing 2x6 header. Half -inch (1/2") thru bolts at twelve -inch (12") spacing will provide the load transferring mechanism between the steel angle and the existing 2x6 header, that will allow the beam to work as a composite system. See attached exhibit for details. Double (2) 2x8 trim studs will be required on each side of the window opening to provide adequate bearing for the peak anticipated loading on the window header. The shear capacity of the quadruple (4) 2x6 header is also adequate for the peak anticipated loading. The remodel plan that was prepared by Associates in Building and Design, LTD and reviewed by Shear Engineering Corporation indicated all headers to be double (2) 2x12's unless noted otherwise. The maximum header depth allowable above the new opening that was cut between the kitchen and the new green house was eight and one-half inches (8 '/2"). Shear Engineering Corporation recommended- installing a double (2} 1 3/4"x 8 1;2" microllam in place of the double (2) 2x12's. The header opening is 48" in width and supports upper floor, roof and wall load. Our analysis indicates that the double (2) 1 3/4"x 8 1/2" microllam is adequate to support the peak anticipated loading. If you have any questions concerning our analysis, please call at (970) 226-5334. Sincerely, Wyatt M. Knutson Shear Engineering Corporation B W S / wmk cc: City of Fort Collins Building Department attachments 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 NAww.shearengineering.com