Loading...
HomeMy WebLinkAbout1219 N College Ave - Special Inspections/Engineering - 09/25/2000all RLYZA61 September 25, 2000 Mr. Pete Cottier Cottier Construction, Inc. P.O Box 1051 Fort Collins, CO 80522 Plaza Engineering Consultants, Inc. P.O. Box 1002 Loveland, CO 80539 (970) 663-6353 Re: Addition to Ken's Mu, fter Shop, 1219 North College Avenue, Fort Callms, Colorado. Mr. Cottier, As requested by you and required by the Fort Collins Budding Department, Plaza Engineering Consultants, Inc. conducted various inspections during the construction of the ruferencedprgJect. We previously submitted field -reports -on -the inspection of %all footing&and foundation walls prior to the placement of concrete. We found the construction ofthe foundation to be in accordance with the foundation plan prepared by our office. In addition to the foundation inspections, we observed the construction of the CMU wall at various stages, including bond beam and lintel construction. We also observed the placement of the structural steel members, along with the roof purlins and roof deck. Based on our observations, it appears these structural elements were placed in accordance with the framing plans prepared by our office. It has been our pleasure to aid you in this project. If you have any questions, please feel free to contact us. Copies and/or originals of this letter should be made available to the building department. cc: